Statement of Work Summary: Office Workplace Furniture – Tier II

This is a Statement of Work (SOW) for office workplace furniture installation at Moody Air Force Base, dated May 2026 (Version 1.1). The project operates under the Department of Air Force Office Workplace Furniture Program, wherein Tier I manufacturers have established discounted pricing that authorized Tier II small business dealers may propose on projects. The contractor must be an authorized dealer of a specific manufacturer and must not exceed the manufacturer's discounted pricing established under the Tier I contract. A site visit is scheduled for August 11, 2026, and the project will be awarded competitively based on total project cost.

The scope requires furnishing and installing stackable and monolithic office workspace systems including: 12 combination 4x6 workstations, 4 monolithic 6x6 workstations, 2 collaboration spaces (7x11 and 13x13), and 1 hoteling workstation (10x8), all complete with storage and ergonomic seating sourced through the DAF Mandatory Use Seating II program. Additional requirements include three private offices with adjustable-height desks and power outlets, moveable demountable walls with various finishes, and carpet installation using exclusive DAF carpet program vendors with comprehensive subfloor moisture and pH testing. The contractor is responsible for complete design services with space planning, delivery, uncrating, assembly per manufacturer specifications, removal of existing furniture, and final installation with zero punch list items remaining before project completion. Design work must be performed by qualified professional designers with three years' experience using AutoCAD or Microstation-compatible software. Key performance thresholds include zero late deliveries, resolution of customer complaints within 24-48 hours, and minimal product marking errors (less than 1%). The contractor must provide a project manager with minimum three years of product installation experience, ensure all personnel comply with base security requirements and REAL ID Act standards, and maintain standard business hours (0730-1630, Monday-Friday, excluding federal holidays) with all Air Force inquiries responded to within two business days.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW Office Workplace Furniture – Tier II

CUI

SOW Office Workplace Furniture – Tier II

Version 1.1

(Moody Air Force Base, USA)

May 2026

Table of Contents

Section

Section................................................................................................................................. ii Revision History ................................................................................................................. ii

1.0 Background cover sheet or appendix

2.0 Scope

3.0 Description of Work

3.1 General Work

3.2 Design Work

3.3 Product Markings/Documentation/Tools

3.4 Delivery Work

3.5 Installation and Removal Work

3.6 Carpet Installation

3.7 Inspection and Acceptance Checklist

4.0 Product

4.1 Monolithic Panels and Components

4.2 Stackable Panels and Components

4.3 Hoteling/Collaboration Furniture

4.4 Demountable Walls

5.0 Government Furnished Property/Support

6.0 Site Conditions

7.0 Base/Installation Specifics

8.0 Performance Objective Summary

Revision History

Author Name Date Reason For Changes Version

Voorhis 4/6/23 Sharepoint corruption 1.1

1.0 Background

This project is being solicited in compliance with the Department of Air Force Office Workplace Furniture Program. Manufactures (Tier I) have established discounted prices for their product lines and have authorized specific small business dealers (Tier II) to propose on projects using the discounted pricing.

The PA office serves as a face of the wing when community leaders, honorary commanders and agency partners come to collaborate on projects and events. The current state of the office presents a dilapidated environment not conducive to creativity and professional collaboration with outside agencies. Also, the current setup is not conducive to mission accomplishment for many reasons: 1) The seven-member cubicle farm in the Command Information section is full height, blocking vision of the team and creating isolating spaces that degrade communication and training opportunities; 2) the cubicle farm is more than 10 years old and is presenting a health and safety hazard with many of the walls thinly secured/can be pushed or fall down; 3) all three authorized private office spaces have furniture that does not adhere to industry standards with design, flow and functionality. The furniture in the PA office has been furnished by pilfered/recycled from other offices on base and has reached and surpassed its lifespan.

2.0 Scope

This project will be proposed using product lines with discounts as described in the tier I contract.

Discounted product pricing has been previously established by the Tier I manufacturer for each product line, but the contractor in this case, an authorized Tier II dealer of said manufacturer, will propose discounted pricing for those items or services on the Tier I discount list. This project will be awarded on a competitive basis using total project cost.

A site visit has been established for 11 August 2026.

For this project we require the following product types: Stackable and Monolithic

Office Refresh Furniture Overall Need:

• 12- 4x6 combination stackable and Monolithic workstations complete with storage and chairs

• 4 – 6x6 Monolithic workstations (complete with storage and chairs)

• 2 – 7x11; 13x13 Collaboration spaces with lounge seating for a waiting area and interview studio

• 1 – 10x8 Hoteling workstation with storage for check-ins and package holding (complete with chair)

Detailed Need:

1. Cubicle Workstations (8):

a. Medium-height cubicles (approximately 54-60 inches high) to allow for some visual connection and collaboration while providing a degree of privacy.

b. Stackable or monolithic construction, as determined by the vendor assessment and DAF requirements.

c. Transparent glass panels at the top of the cubicle walls to enhance natural light and visibility.

d. Work surfaces with adjustable height options to accommodate different user preferences and ergonomic needs.

e. Adequate storage solutions, including drawers and shelves.

f. Integrated power and data connectivity.

2. Private Offices (3):

a. Desks with adjustable height options, with built-in power outlets.

b. Ergonomic task chairs sourced through the DAF Mandatory Use Seating II program.

c. Storage solutions, including filing cabinets, bookshelves, and credenzas.

d. Guest seating for visitors.

e. Layout designed to promote a welcoming and professional environment, with monitors and seating oriented to avoid barriers between the occupant and visitors.

3. Collaboration Areas:

a. Open and inviting spaces for team meetings and informal discussions.

b. Tables and chairs suitable for collaborative work.

c. Whiteboards or other writing surfaces.

d. Power and data connectivity for laptops and other devices.

e. Open bullpen in the middle of the cubes.

4. Moveable Walls:

a. Demountable walls that can be easily reconfigured to create different workspace layouts.

b. Variety of finishes available, including paint, fabric, and glass.

c. Doors and windows as needed to provide access and visibility.

Carpet Installation and Subfloor Preparation:

1. Provide and install new carpet sourced exclusively through the DAF carpet program.

2. Conduct comprehensive non-destructive moisture and alkalinity (pH) testing of the concrete subfloor prior to installation to determine subfloor suitability.

3. Halt work for government validation of test results prior to material ordering or installation.

4. Execute an approved moisture mitigation plan (Optional CLIN) if subfloor conditions exceed manufacturer tolerances, ensuring full compatibility and warranty retention.

It is the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer. In no case shall prices exceed discounted price amount established in the Tier I contract. A final furniture layout and Bill of Materials (BOM) will be provided that meets the customer requirements and accommodates the physical environment as part of proposal. Design requirements can be found in Section 3.2. For any Demountable Walls, a lineal foot expectation will be included along with the anticipated wall materials such as paint, fabric, wood or glass, as well as number of doors or windows to be included.

3.0 Description of Work

3.1 General Services

Coordination and management of all product, equipment and people required to create, deliver and install new office workplace furniture within an Air Force location. This includes ongoing servicing of any items defective due to manufacturing error as well as for replacement or repair of any damaged item after purchase.

3.1.1 The contractor shall perform tasks on Office Workplace Furniture in accordance with the requirements stated in this contract and the tier I Contract.

3.1.2 The contractor shall be responsible for all personnel, equipment, tools, materials, supervision, storage, assembly, transportation, incidentals and all other items and services necessary to provide and install office workplace furniture.

3.1.3 The contractor shall be knowledgeable of and shall comply with all applicable federal, state, and local laws, codes, permits, DoD, AF, and base requirements and instructions required for the performance of the duties in this Performance Work Statement (PWS).

3.1.4 The contractor shall ensure policies and procedures are established that protect the safety and welfare of customers, employees, and the community to minimize or eliminate safety or environmental risks. These policies shall be in compliance with Federal and Installation policies and procedures.

3.1.5 The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer (CO) within 10 days after contract award. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operations of this contract on the installation.

3.1.6 The contractor shall provide a Project Manager with a minimum of 3 years of experience installing your company's product, responsible for project site management, scheduling, coordination and technical assistance to the Air Force representative as required throughout the project. Resumes and letters of intent shall be provided upon request.

3.1.7 Any electrician provided by the contractor shall be a licensed electrical contractor. The electrician will be paid in accordance with Davis-Bacon wage determination GA20260316.

3.1.8 The contractor shall submit a complete list of personnel in accordance with installation policy, including deliverymen, who will be expected to work on the installation. This list will contain Privacy Act information as required as well as the expectation that each individual will be able to present a current and valid state/federal identification complying with the REAL ID Act, to meet local Air Force security requirements. (Please note that many installations require this information be coordinated days in advance).

3.1.9 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.

3.1.10 The contractor shall be the authorized dealer of the specific office workplace furniture manufacturer proposed for the project.

3.1.11 The contractor shall manage ordering, shipment, delivery and installation of all new furniture from manufacturer to final acceptance by the Government Project Manager (GPM).

3.1.12 The contractor shall provide customer service during normal duty hours, 0730-1630 hours, Monday through Friday; except for federal holidays.

3.1.13 Recognized US Federal Holidays are as follows: New Year’s Day, Birthday of Martin Luther King Jr., Washington’s Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday.

3.1.14 When the contractor desires to work other than standard times, a written request shall be submitted to the GPM for approval. Written approval from the CO must be received before proceeding with the work. The request shall be submitted at least five (5) work days prior to the proposed performance of work, and it shall indicate the day/days, time/amount of work, and reason why performance is necessary during nonstandard hours.

3.1.15 The contractor shall provide alternate work locations for employees or allow employees to take vacation during designated Government non-work days or other periods where government offices are closed.

3.1.16 All Air Force inquiries shall be responded to by a contractor representative within two business days.

3.1.17 Meetings may periodically be held between base personnel and contractor management to discuss contract status. The CO will notify the contractor in writing in advance of the place and time of required meetings.

3.1.18 Reserved

3.1.19 The contractor shall be responsible for coordination of an escort through any controlled areas through the local GPM.

3.1.20 Lost vehicle and entry passes shall be reported immediately to the Security

Police as well as the GPM in accordance with the local security forces policy.

3.1.21 The contractor shall be responsible for any storage of all office workplace furniture, components, parts and assemblies prior to and during installation in accordance with the agreed upon delivery schedule.

3.1.22 Reserved

3.1.23 The contractor shall maintain the capability to adjust workforce in the event of unforeseen circumstances such as extended duty hours, travel, classes and education, and mission related changes. These expenses are reimbursable with prior approval of the GPM and the CO.

3.1.24 The contractor shall maintain continuity between the support operations at Moody AFB and all other assigned performance locations and the contractor’s corporate offices. The contractor shall provide the necessary resources to manage and administer the contract. The contractor shall, as a minimum, maintain a single point of contact for this effort to be available in person to the 23 WG/PA, during the same business day.

3.1.25 The contractor shall provide for the management and support of personnel, to include: making necessary arrangements for employees required to travel; supporting personnel co-located on Moody AFB and other locations specified with additional resources, expertise, advice; necessary infrastructure to support work to be accomplished off-base; conducting personnel meetings; providing administrative support for employees in a timely fashion; and providing facility and staff security requirements.

3.1.26 All personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

3.2 Design Work

Providing professionals versed in programming, space planning and product specification, able to communicate product capabilities to the customer, to ensure products purchased meets the requirements.

3.2.1 As a part of the request for proposal/quote process, the contractor will propose products and a design that takes into account site layout considerations, as well as other information gathered during initial customer review at the discounted price upon which the award will be based.

3.2.2 In no case should product prices exceed the discounted amounts set forth in the Tier I contract applicable to the contractor. The proposal shall show list price and discount and net price.

3.2.3 The contractor shall provide design services, including space planning, site verification, material selection and programming as necessary for the project.

3.2.4 The contractor shall define and furnish the necessary hardware, software, and all other equipment necessary to accomplish design tasks. Standard equipment in addition to the hardware and software shall include but not necessarily be limited to: reproduction machines, plotters, paper, pencils, fax machines, and office furniture.

3.2.5 The contractor shall be responsible for collection of information relevant to the design/redesign of a space. Examples could include personnel interviews, questionnaires and walk-through inspections of the facility, as well as the existing furniture database (if available).

3.2.6 Services shall include site evaluation to ensure proper fit of the furniture within the given space and that all structural and other anomalies are taken into account.

3.2.7 The contractor is responsible for notifying the GPM of all power requirements regarding location of communication, LAN and power junction boxes, with the expectation that the government will be responsible for providing and locating those junction boxes within 4'-0" of the ceiling penetration of the power pole location provided by the contractor.

3.2.8 Design shall ensure that power poles do not protrude into main walkways.

3.2.9 Design shall ensure that all outlets included in the design are accessible to the user, free and clear of obstacles.

3.2.10 Design shall not allow more than four cubicles to be served by a single circuit.

3.2.11 Design shall ensure that no more than two duplex outlets (four plug in points) are put onto the same circuit.

3.2.12 Design shall ensure that no existing wall outlets or thermostats are covered or concealed by panels or other systems furniture components.

3.2.13 Design shall consider utilize wall mounted applications where possible.

3.2.14 The contractor shall utilize any existing government product to its maximum as applicable when project includes add on parts to existing systems furniture.

3.2.15 All designs of furniture layouts, including original designs and any subsequent redesigns, must be accomplished by, qualified professional designers and should have three years’ experience using software similar to that proposed for this contract.

3.2.16 The contractor shall meet with the GPM to review the installation drawings prior to submission of any revised price quote.

3.2.17 The contractor shall provide additional drawings of furniture layouts, if requested by the GPM on a non-rewritable CD or DVD in both .dwg and .pdf formats unless otherwise specified in the contract.

3.2.18 The hardware/software shall perform computerized inventory, computer aided design, automated take-off function, and report generation for all product purchased. The software for this contract shall be compatible software for AutoCAD and Microstation. The software shall be fully compatible with Microsoft Windows, the most current version.

3.2.19 Design service shall include an initial complete design with up to two additional minor revisions prior to final approval.

3.2.20 Designs of each location shall include a Basic component floor plan sheet in which all systems furniture and workstation is tagged: to include graphic symbols for all major hanging components (flipper cabinets, shelves, task lights, tack boards, work surfaces, drawers, etc) as determined by the government. This design sheet shall include station numbers and movable wall and associated product locations, in 1/4" = 1'- 0" scale.

3.2.21 Designs of each location shall include a Panel and Hardware Layout sheet:

to include all finish colors and fabrics, panel widths (30", 36", 42", etc), in 1/4" = 1'0" scale, in addition to display hardware, keys and locksets shall be included.

3.2.22 Design sheet layouts of each location shall include a Furniture Power Distribution sheet in 1/4" = 1'0" scale to include: the location of all powered panels, powered components, receptacles, communication ports, power poles, powered raceways, base electrical feeds and building connection points.

3.2.23 Within ten (10) workdays after the final design has been accepted by the base requesting organization, a bill of materials detailing all inventory, and

(3) copies of all plans including basic floor plan, movable wall, panel and electrical layouts will be provided to the GPM for the project.

3.2.24 The contractor shall maintain an updated, automated master copy of all furniture layouts, (designs/redesigns) accomplished under this contract for the duration of the warranty, after government acceptance of the project.

3.2.25 Drawing changes required to a layout due to contractor errors or omissions shall be the responsibility of the contractor and the corrected drawing and bill of materials shall be delivered to the government within three calendar days of the request.

3.2.26 Contractor shall provide the GPM a copy the installation drawings and bill of materials via mutually agreed upon electronic media.

3.2.27 Contractor shall make the government aware of any discrepancies to existing conditions not previously identified.

3.3 Product Markings/Documentation/Tools

Items used after product acceptance used to identify or modify a particular product.

3.3.1 All documentation (Owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, etc.) shall be provided to and reviewed with the GPM upon completion of the installation.

3.3.2 Special assembly tools (security hardware wrench, spare parts provided with the furnishings, etc.) shall be provided to the GPM prior to final Government acceptance of products and services.

3.4 Delivery Work

Transportation of all products, loading, unloading, storage and all necessary movement from factory to final onsite set up.

3.4.1 The contractor Project Manager shall be responsible for on-site coordination of all staging and deliveries, to include access to and operation of any equipment needed for unloading and movement of materials or product. This includes any products obtained from suppliers other than the holder of the Tier I agreement.

3.4.2 Contractor shall be responsible for determination of the appropriate delivery method and handling, based on site conditions to include the non-existence of loading docks and equipment at any given location. Special circumstances may be identified to and negotiated with the CO.

3.4.3 Delivery shall be in accordance with the terms of the contractor's agreement. If the ordering activity designates an accelerated delivery schedule it will be identified in the contract.

3.4.4 A maximum of 30 days offsite storage shall be included in the contractor's agreement.

3.4.5 Work shall comply with applicable building standards and codes, specifically: National Electrical Code (National Fire Protection Association (NFPA 70) and National Life Safety Code (NFPA 101).

3.4.6 The contractor shall be responsible for following all safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.

3.4.7 The contractor shall maintain accountability and control of any keys provided and shall return them to the GPM upon completion of work.

Duplication of keys or other means of access is not authorized.

3.4.8 The contractor shall prevent its personnel from entering any area other than the designated work area.

3.4.9 The contractor shall maintain a means of egress within all designated work areas to comply with fire codes.

3.4.10 The contractor shall ensure its personnel eat, drink, or smoke only in designated areas.

3.5 Installation and Removal Work

Manufacturer certified professionals to install office workplace furniture per the approved design drawings.

3.5.1 Contractor shall provide, or have capability of obtaining support services to include removal and warehousing of the proposed furniture and demountable walls.

3.5.2 The contractor shall appoint an authorized representative who will be the company's senior representation on site for all customer communication and enforce compliance of all requirements for the project. This representative shall have a physical presence during any delivery and throughout installation unless agreed to by the GPM.

3.5.3 The contractor representative shall meet with GPM to review the installation drawings prior to installation.

3.5.4 The contractor shall install office workplace furniture in accordance with each requirement statement and basic component floorplan, panel plan and electrical plan, designed and provided by the contractor with each purchase.

3.5.5 Contractor shall be liable for any damage to government property caused by the contractor or their representatives.

3.5.6 During installation the contractor shall protect all furniture and building materials, to include carpet, existing within the space with industry approved protective coverings inclusive of craft paper, moving blankets and such type material. The contractor shall not use protective materials that will leave any type of residual print, outline or imaging on any furniture or building materials. Contractor shall not repair damage to finishes unless directed by CO, but will be responsible to pay for damages.

The government will make repairs and back charge the installation contractor.

3.5.7 Services shall include product transportation of existing inventory as required.

3.5.8 The contractor shall uncrate/unpack all items and perform required assembly in accordance with the manufacturer instructions.

3.5.9 Services shall include inspection of product for shipping damage. If damage is found it shall be the responsibility of the contractor to notify the GPM and make all arrangements for replacement or repair of the item(s) damaged. Damaged items are not to be installed unless otherwise directed by the GPM.

3.5.10 Services shall include assembly of product to conform to final CO approved design drawings.

3.5.11 Any furnishings attached to the building shall be attached securely.

3.5.12 Installation of office workplace furniture must be under the oversight of an onsite manufacturer certified installer.

3.5.13 The contractor shall ensure that all communication outlet faceplates are provided with the furniture, based on the unique specifications of the IT requirements at that location.

3.5.14 Services shall include removal of packing materials from the installation and cleaning of product including steam cleaning reused panels and thorough cleaning of all products.

3.5.15 Services shall include removal of all excess product and transport to the GPM approved warehouse or other location as specified.

3.5.16 Services shall include removal of packing materials from the installation and cleaning of product including steam cleaning reused panels and thorough cleaning of all products.

3.5.17 All trash removed from the worksite shall be disposed of in accordance with state laws, and packaging and other recyclable materials shall be recycled where ever possible.

3.5.18 The contractor shall maintain environmental controls when working in any government facility, to include but not limited to keeping doors shut and lights off when not in use and turning off vehicle engines when parked.

3.5.19 Light fixtures shall have appropriate lamps and be in working order.

3.5.20 Prior to acceptance, the contractor shall clean all furniture only with the manufacturer's recommended cleaning agents/products.

3.5.21 The contractor shall provide all components, completely assembled, installed, and operational, including keys in each lock set.

3.5.22 Furniture, equipment, and accessories shall be level, square, and in proper alignment with adjoining furniture. All drawers should operate smoothly and stay closed when not in use.

3.5.23 The contractor shall inspect to ensure the furniture is free of surface dirt and defects, the installation is complete, and the furniture is ready for use.

3.6 Carpet Installation

3.6.1 General Requirement: The Contractor shall be solely responsible for determining the suitability of the concrete subfloor for the specified carpet and adhesive. Prior to ordering materials and commencing installation, the Contractor shall perform all necessary Non-destructive moisture and alkalinity (pH) testing in accordance with the flooring manufacturer’s most current written instructions and applicable industry standards (e.g., ASTM F1869 Calcium Chloride test or ASTM F2170 In-Situ Relative Humidity test).All areas requiring correction shall be documented in a punch list by the contractor and provided to the GPM upon completion of a joint walk through by the contractor and the GPM. No payment will be authorized while punch list items remain open.

3.6.2 Contractor Liability and Warranty: The awarded Contractor shall conduct their own testing and shall not rely on third-party or historical test data. The Contractor assumes full liability for the compatibility of their provided materials with the existing site conditions. The Contractor shall ensure that proceeding with the installation will not void any manufacturer or workmanship warranties.

3.6.3 Government Validation (Hold Point): Upon completion of the moisture and pH testing, the Contractor shall halt work and submit the certified test results in writing to the Contracting Officer(COR) and the Project Manager. The Contractor shall not proceed with material ordering, subfloor preparation, or installation until the government has reviewed and validated the results.

3.6.4 Test Results and Course of Action: Based on the validated test results, the project will proceed under one of the following conditions:

3.6.4.1 Passing Results (Condition within Manufacturer

Tolerance): If the moisture and pH levels meet the flooring manufacturer's requirements for a standard installation, the government will provide written authorization to proceed. The Contractor shall immediately commence with the standard installation as outlined in the base contract. The Optional Contract Line Item Number (CLIN) for Moisture Mitigation will not be exercised.

3.6.4.2 Failing Results (Conditions exceed Manufacturer

Tolerance): If the test results exceed the manufacturer's allowable limits, the Contractor shall immediately notify the COR and Project Manager. The Contractor shall provide a written moisture mitigation plan and a cost breakdown utilizing the pre-established Optional CLIN / Not-To-Exceed (NTE) allowance for "Moisture Mitigation." The government will review the mitigation plan. Upon COR approval and exercise of the Optional CLIN, the Contractor shall execute the moisture mitigation system (e.g., application of a specialized epoxy moisture vapor barrier) prior to carpet installation. The mitigation system must be fully compatible with the chosen adhesive and carpet system and must guarantee the standard product and installation warranties.

3.6.5 Customer’s Carpet Selection:

The contractor shall work with one of the vendors listed under the Air Force Carpet Program (or approved by the Government Representative) and install one of the following carpet selections. Final selection will be determined in coordination with the 23WG/PA office.

• Mohawk – Visual Edge Collection – 989 Dark Charcoal

• Engineered Floors – Tip Sheared Patterned Loop – 2872 Ticking

• Interface Americas – PDF Unavailable

• Mannington Vivendi Collection – Circ – Travertine 35216

• Tarkett Corded Cloth – 11570 – Modern refinement collection – 60801

Night Vale

• Milliken Ghost Artist – Semblance – SEM – 52 Stealth

• Bentley Mills – 4RXT40221K-6GCR-P-Redux

3.7 Inspection/Acceptance Checklist

Validation between the contractor and the GPM that all product has been installed according to manufacturer guidelines and customer specifications.

3.7.1 A post-installation walkthrough shall be coordinated with the contractor’s authorized representative and GPM.

3.7.2 All areas requiring correction shall be documented in a punch list by the contractor and provided to the GPM upon completion of a joint walk through by the contractor and the GPM. No payment will be authorized while punch list items remain open.

3.7.3 A final walk through will be performed with the contractor and the GPM and the CO to ensure all punch list items have been addressed to the satisfaction of the government.

4.0 Product

4.1 Monolithic Panels and Components

The contractor shall supply all monolithic panel system parts and components needed to fulfill a complete office as referenced on the Office Workplace Furniture Tier I Contracts.

4.2 Stackable Panels and Components

The contractor shall supply a stackable panel system product as referenced on the Office Workplace Furniture Tier I Contracts.

4.3 Hoteling/Collaboration Furniture

The contractor shall supply furniture product as referenced on the Office Workplace Furniture Tier I Contracts.

4.4 Demountable Walls

The contractor shall supply demountable wall product as referenced on the Office Workplace Furniture Tier I Contracts.

5.0 Government Furnished Support

5.1 Base support includes Government-controlled working space and utilities.

6.0 Site Conditions

6.1 Standard site conditions shall be considered those that include:

6.1.1 Free and clear hard surface access to the receiving and installation location during regular working hours

6.1.2 Parking and off-loading area suitable for access by a semi-trailer combination or truck within 100 feet of the building entrance closest to product installation area

6.1.3 Threat condition level of the base is Alpha. This requires dealer personnel to get base access in order to complete the product installation.

6.1.4 A staging area adequate to sort, stage and uncrate products along with a waste receptacle suitable for disposal of materials

6.1.5 Includes electric power, working lights, heating and air conditioning, and access to a working freight elevator if location is on a floor other than the first floor

6.1.6 Current and correct CAD drawings of the building shell

6.1.7 A building ready for the installation of furniture (i.e. other tasks such as painting and flooring are complete so as not to cause any delays in performance)

6.2 Contractor shall notify the CO of any deviations from the above standards, as well as any requests for equitable adjustment to the contract price based on a condition not available at site visit.

7.0 Base/Installation Specifics

7.1 All commercial trucks must enter through Davidson Gate, which is located east of the main road at the intersection of Bemiss Road and Davidson Street for inspection. In accordance with the Installation 23d Wing Security Forces Squadron; base entry procedures must adhere to delivery vehicle process requirements mandated by the Wing, Moody AFB, GA. Once at Davidson Gate the driver must have a current visitors pass from 23d Moody AFB Visitor Center, and be able to show:

• A current Vehicle Registration

• A current Proof of Insurance

• A valid and current Driver's License for the driver

• A valid and current Driver's License or other State Identification for any passenger(s) in the vehicle.

7.2 Gate Procedures:

• Once at Davidson Gate, be prepared to exit the vehicle and allow for vehicle inspection. At this time you may ask for directions to your final destination.

• If the final destination requires the driver to leave Davidson Gate, and re-enter the base through an alternate gate, the pass received will be sufficient documentation for entry into both gates, within a pre-established time directed by the Security Forces representative.

• Arrival at the appropriate gate after the designated allotted time will result in non-admittance to the installation.

• This procedure will occur each time a commercial truck requests access to the base.

7.3 Current Bill of Lading (BOL) to get delivery driver and the vehicle on base. BOL must include the AF installation name, date of anticipated delivery, and specific destination (including building number, street address, and point of contact information).

7.4 Personnel should the following items when entering an installation:

• Current Registration for all vehicles

• Current Proof of Insurance for all vehicles

• Valid driver’s license for each driver

• Valid driver’s license or other state identification for each passenger

• Depending on the current Force Protection Condition, a government representative may be required to sponsor those people in person at Pass & ID, at the Moody AFB Visitor Center.

• The sponsor must state the guest's purpose and destination. It is the responsibility of the contractor to validate this need with their government POC prior to their arrival so as to coordinate the arrival time accordingly.

Sponsors may request that a pass be applicable for multiple days if needed.

7.5 To sponsor 10 or more people, a typed list of those people must be submitted by the COR in Word or Excel format, stating LAST NAME then FIRST NAME of each person. The sponsor must submit that list to Pass & ID Moody AFB Visitor Center, no fewer than three days prior to the anticipated arrival. Names listed must be complete names, (no nicknames), and correspond to the names on the state ID for each person.

7.6 Mission Essential Services: Contractors are not considered mission essential.

7.7 Prohibitions: Firearms may not be brought on base under any circumstances.

Individuals with criminal records are not allowed on base. Contractor personnel are prohibited from sponsoring guests onto the installation.

8.0 Performance Objective Summary

Performance Objective SOW

Paragraph Performance Threshold

1) General –Oversight and accountability for all people and equipment used and product ordered for a project

3.1 No more than 1 customer

complaint per time period and resolution of all issues identified by the COR within 24 hours

2) Design – design was provided within the allotted time frame, fulfills the customer’s requirements and fits appropriately within the site conditions of the space.

3.2 Zero late delivery of designs. Issues relating to customer requirements and site conditions will be successfully resolved within 24 hours.

3) Product Markings – products are labeled with appropriate markings so future users can identify them at a later date.

3.3 Minimal mistakes in

product markings (less than 1%). Mistakes shall be corrected within 48 hours of identification by the GPM

4) Delivery – delivery time met expectations and was unloaded by appropriate contractor personnel using appropriate equipment without damage.

3.4 Zero late deliveries.

Damage resolved in accordance with the SOW.

5) Installation/Removal

– product was uncrated, and assembled per manufacturer’s instructions and per customer’s approved layout within the allotted time frame

3.5 No more than one

customer complaint per week. Complaints must be successfully resolved within 48 hours.

6) Acceptance – All punch list items have been remedied and all furniture is in proper working condition.

3.6 Zero punch list items

remain unresolved prior to project completion.

1.0 Background
2.0 Scope
3.0 Description of Work
3.1 General Services
3.2 Design Work
3.3 Product Markings/Documentation/Tools
3.4 Delivery Work
3.5 Installation and Removal Work
3.6 Carpet Installation
3.7 Inspection/Acceptance Checklist
4.0 Product
4.1 Monolithic Panels and Components
4.2 Stackable Panels and Components
4.3 Hoteling/Collaboration Furniture
4.4 Demountable Walls
5.0 Government Furnished Support
6.0 Site Conditions
7.0 Base/Installation Specifics
8.0 Performance Objective Summary

File details come from the government source that posted it. Updated .