ATTACHMENT 2 - STATMENT OF WORK 70Z03821QJ0000075.pdf
PDF 223 KB Posted
- Attached to
- Overhaul Ice Detectors Federal contract opportunity
- Solicitation number
- 70Z03821QJ0000075
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 3 - TERMS AND CONDITIONS - 70Z03821QJ0000075.pdf | ||
| ATTACHMENT 1 - SCHEDULE 70Z03821QJ0000075.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2 - STATEMENT OF WORK (SOW)
70Z03821QJ0000075
OVERHAUL ICE DETECTOR
1.0 Contractor Requirements for Overhauled
1.1 This SOW requirement is for overhauling the following component(s):
Description Quantity National Stock Number (NSN) Part Number (P/N)
DETECTOR,ICE 15 6340-01-212-2907 871FF3
The component(s) are utilized on the MH-60T aircraft. Upon receipt of the components, the Contractor shall perform a test and evaluation to determine the condition of the component. Any component where no faults are found or the component is determined to be Beyond Economical Overhauled (BER) shall be returned to the United
States Coast Guard (USCG) in accordance with (IAW) Sections 2.4 and 2.7. All other components shall be overhauled IAW this SOW.
1.2 The part(s) are utilized on the H-60 aircraft. Upon receipt of the component(s), the Contractor shall perform a test and evaluation to determine the condition of the component. Any component where no faults are found or the component is determined to be Beyond Economical Overhauled (BER), the Contractor will be allowed one of the following firm-fixed prices only:
Service Total
Test and Evaluation Fee TBD at time of award
BER/Scrap Fee TBD at time of award
2.0 Overhaul
2.1 Non-RFI components shall be overhauled and returned to RFI condition IAW the original equipment manufacturer (OEM) functional performance specifications. Components shall be overhauled for the specific fault noted on the DD Form 1577-2, Unserviceable Tag-Material, or CG-1577-A (11-90), Unsatisfactory Report Tag, which will be attached to each non-RFI component. The contractor shall perform an inspection and correct all deficiencies found. This shall include, but is not limited to, replacement of missing or broken parts and the removal of any foreign matter or corrosion.
2.2 During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part.
Corrosion removal and treatment of affected areas will be accomplished IAW OEM specifications and Federal
Aviation Administration (FAA) Advisory Circular AC 43-4B, dated 09/11/2018, Corrosion Control for Aircraft.
2.3 Work under this purchase order shall be performed at the contractor’s facility or USCG approved facility.
The contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and overhauled the components listed in this purchase order at the firm-fixed prices listed in the schedule (or modification).
2.4 Overhauled services must be performed IAW the procedures established in this SOW. The documents are listed in order of precedence. Latest revisions of any instruction or manual shall apply. The information contained within is not intended to be all inclusive nor to detract from or modify procedures outlined in the manuals. If the applicable technical manual does not cover a procedure, the Contractor shall utilize the OEM overhauled manual.
If the OEM manual does not cover a procedure, the Contractor shall utilize the best commercial business practice.
Where an application of “best commercial practice” is in conflict with these manuals, the Contracting Officer may approve deviation from requirements. When applicable, each manual will specify if the Export Control Act applies.
The following document(s) are required to complete the services required by this acquisition. The USCG does not own nor can it provide the technical documents specified herein.
All OEM shop, inspection, overhaul, overhauled, or other OEM Component Maintenance Manuals (CMM)
All OEM service bulletins, amendments, modifications, and specifications as applicable
Naval Air Systems Command Technical Manuel Ice Detector, A1-450QA-MDB-000 dated Oct 31, 1987.
2.5 The Contractor shall have access to required overhauled specifications and test/acceptance criteria and data to ensure all components are tested and overhauled IAW the current specifications and procedures. The USCG may review overhauled manuals and performance/test/ acceptance criteria as required. The Contractor is solely responsible for obtaining all specifications required for this effort. Original design or functional capabilities of the end component and parts thereof shall not be changed unless authorized or directed by the requirements of this
SOW.
2.6 Parts of a component found to be in a serviceable condition as a result of functional testing shall be reused.
Missing parts and parts found to be defective or that require replacement by manufacturer’s instructions shall be replaced with parts meeting the manufacturer’s specifications and drawings or as otherwise authorized in writing by the Contracting Officer. Replacement parts shall be new and accompanied with OEM traceability. The cost for parts that are replaced systematically during overhauled shall be included in the price listed in the schedule for these operations.
2.7 Prices do not include components that have been cannibalized or severely damaged due to mishandling.
Additionally, USCG aircraft is used primarily around salt water at low altitude for search and rescue missions.
Therefore, corrosion is to be anticipated and is considered "normal" for the aircraft. Corrosion does not constitute unusual damage.
2.8.1 Components received which indicate obvious misuse, cannibalization, or severe damage due to mishandling or crash damage may dictate an exclusion from the prices specified in the contract schedule. Such components shall be inspected, overhauled costs determined, and authorization to proceed obtained from the
Contracting Officer prior to commencement of work. Once notified of a possible exclusion, The Contracting
Officer will make a written determination within thirty (30) days as to exclusion validity. The Contracting Office may approve the quote, decline the quote and have the component returned as-is, or consider the component BER.
2.9 The USCG will provide disposition instructions (either to scrap the component at the contractor’s facility or to return the component to ALC) for all components that are considered BER. The contractor shall not dispose of a component until they have been notified by a written modification to the order. When returning the component to ALC, the components shall be clearly marked as “BER” with the supporting evidence.
2.10 The Government shall not be liable for any amount expended by the contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the Contracting
Officer.
2.11 The contractor shall submit a failure data report for each overhauled component. This report shall include
NSN, P/N, Serial Number (S/N), nomenclature, date of overhauled, contract delivery order number, line item number, description of overhauled failure, the USCG’s reported failure, a listing of parts overhauled and a listing of parts replaced. The contractor’s in-house work order may be used to satisfy this requirement if it includes the information requested above. This report shall be attached to the packing slip and shipped with the overhauled component.
2.12 The contractor may be is required to be certified and maintain a quality system that complies with the requirements of ISO 9001-2000 Quality Management Systems – Requirements or equivalent. The contractor is responsible for performing or assuring all inspections and tests necessary to substantiate that the goods or services furnished conform to Government’s requirements. The contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements. Records of conformance shall be maintained on file at the contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at contractor’s facility to verify the existence, adequacy, and effectiveness of the quality system.
2.12.1 The Contractor shall, immediately upon discovery, notify and disclose conditions to the Contracting Officer of any event, supply change, material change, supply malfunction, counterfeit/suspect parts or materiel, defect or non-airworthy condition of any product or component (to include components used in overhaul) found to potentially cause a non-conformity to the original specifications of this contract. The Government reserves the right to inspect any non-conforming product or component. Therefore, the Contractor shall obtain approval from the
Contracting Officer prior to the disposition of any non-conforming product or component.
2.12.2 The contractor’s quality control manual shall address in detail the contractor’s risk management, test, inspection, non-conforming product and counterfeit/suspect parts processes. Upon request by the Government, the contractor(s) shall forward a copy of their current certification and quality control manual for review.
2.12.3 The Contractor shall immediately notify the Contracting Officer of any changes that potentially have an impact on the product. Changes may include but are not limited to products, processes, materiel, supplier sources, manufacturing facility location and personnel qualifications.
2.12.4 Upon notification of the change, the USCG will approve or deny the change. Facility location changes may require the Government to perform a facility inspection. The contractor shall allow the Government access to all applicable areas of the contractor’s facilities to ensure compliance with contractual requirements. In the event that the change is not approved by the USCG, the contract, delivery order or task order may be cancelled or terminated in accordance with the Federal Acquisition Regulations (FAR).
2.12.5 The contractor shall retain all records in accordance with FAR 4.7 Contractor Records Retention. The contractor shall be required to permit Government access to applicable records retained at any level of the supply chain.
2.12.6 Unless otherwise specified, the Contractor shall flow down all requirements in this contract to their supply chain, to include all subcontractors and suppliers.
2.13 ALC considers components RFI upon acceptance. Components determined to be non-RFI upon installation may be returned to the contractor with deficiencies described in a Product Quality Deficiency Report.
2.14 All parts must be thoroughly cleaned IAW applicable CMMs. ALC may take random samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025 (lead), 1910.1026 (Hexavalent Chromium) and 1910.1027 (Cadmium).
2.15 Quarterly audits are conducted by ALC on Government Furnished Property at commercial Contractor facilities. The Contractor shall follow the instructions provided each quarter by ALC and comply with its instructions. The Contractor’s role shall be to validate each component identified by S/N by ALC. Validation shall take place on the same date as the audit.
3.0 Certifications
3.1 When checked the Contractor shall:
Maintain NAVSUP WSS certification for the overhauled of the components listed in this statement of work. The Contractor shall provide immediate notification to the Contracting Officer upon loss of any required certifications. The contractor shall also:
Comply with the certification/documentation requirements specified herein.
Attach certifications/documentation to the outside of the shipping container.
All parts overhauled under the provisions of this contract must be airworthy and suitable for installation on USCG aircraft. Each returned component shall be tagged with a DD Form 1574 Serviceable Condition
Code Tag or a FAA Form 8130-3, Airworthiness Approval Tag, completed in its entirety. The contractor shall furnish a Certificate of Airworthiness in accordance with FAA procedures (or USCG approved alternate procedure) and a Certificate of Conformance (COC) IAW FAR 52.246-15 for all components.
These forms shall be packaged with each component.
The COC shall be signed by an authorized official of the approved source and must specify the nomenclature, manufacturer's part number, and date of manufacture. For Production Approval Holder, a
COC and a copy of the FAA Parts Manufacturer Approval (PMA) or other manufacturing authority shall be provided. Contractors shall also provide documentation reflecting the complete unbroken history of ownership of the parts from purchase from the approved manufacturing source until delivery to the USCG.
4.0 Tracked Components
4.1 Serial number tracking shall be used for validating the correct component(s) were received at the
Contractor’s overhauled facility and returned to the USCG. Upon receipt of the component(s) from the USCG, the
Contractor shall verify each component received to ensure that the S/Ns match the ones specified in the order.
Should a discrepancy be identified, the Contractor shall notify the Contracting Officer in writing of the discrepancy.
4.2 When checked the contractor shall comply with the following documentation requirements:
The components to be overhauled under this Purchase Order are tracked in the USCG’s Asset Computerized
Maintenance System (ACMS). ACMS is the management information system used to schedule and record all
USCG equipment maintenance actions and calibration intervals.
Tracked components will be shipped to the contractor with a Significant Component History Record (SCHR).
The SCHR records the maintenance history of the serial number tracked components. It remains with its corresponding part until reinstalled on an aircraft or is annotated “BER” and scrapped. (NOTE: written approval from the Contracting Officer is required prior to scrapping a serial number tracked component). The SCHR for scrapped components shall be returned with the component. The Contractor shall retain a copy of the SCHR for ninety (90) calendar days.
The Contractor shall provide a Component Overhauled Record (CRR) with the overhauled component(s). The
CRR records the maintenance performed on a serial number tracked component and enrolls or disenrolls components from ACMS when those components are scrapped, added to, or removed from the USCG inventory.
At a minimum, the CRR shall identify the equipment and contain a description of the maintenance action performed, parts replaced, service bulletins and modifications. The Contractor shall mail one (1) copy of the CRR to USCG ALC, ATTN: AVENG/ACMS, Elizabeth City, NC 27909-5001 no later than five (5) business days following completion of the rework effort. The original CRR shall be packed with the component. The Contractor shall retain a copy of each CRR for ninety (90) calendar days. The Contractor may request that their in-house work order be accepted to fulfill the CRR requirement. The Contracting Officer will provide a written determination in response to the request.
5.0 Delivery Requirements
5.1 The following table shows the required delivery for each priced line item listed in the schedule. Early deliveries, when appropriate, are desired and acceptable.
Item Description Due No Later Than:
Test and Evaluation Fifteen (15) calendar days after receipt of components
Overhaul Ice Detector 60-90 days after induction
5.2 Final inspection and acceptance shall be performed at origin by the Defense Contract Management Agency.
Equipment found to have operational deficiencies may be reported on standard form "SF 368", Product Quality