Attachment 2_ Statement of Work_Specification.pdf
PDF 474 KB Posted
- Attached to
- USCGC ALERT DEPOT FY21
- Solicitation number
- 70Z080-21-Q-P4584700
About this file
This statement of work outlines requirements for a depot availability period aboard the USCGC ALERT from 3 May 2021 to 29 May 2021. The solicitation seeks contractors to perform work items including renewing sewage piping, refrigerant piping, and external watertight scuttles. Specific tasks involve removing and replacing approximately 165 feet of sewage piping and valves, renewing a refrigerant valve and up to one foot of associated piping, and replacing two external watertight scuttle hatches. Contractors must adhere to all technical specifications for surface preparation, coating application, testing, and documentation. The period of performance is defined as 3 May 2021 to 29 May 2021 and the point of contact is Kaity George of the Department of Homeland Security US Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2_Refrigeration Drawing.pdf | ||
| Amendment 2.pdf | ||
| Amendment 1.pdf | ||
| Attachment 1_Schedule of Services.xls | XLS spreadsheet | |
| 70Z080-21-Q-P4584700.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC ALERT (WMEC 630)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2021
Developed By: Steven R Hendricks
(Rev-0, 9 February 2021)
USCGC ALERT (WMEC-210B) DOCKSIDE AVAILABILITY FY2021
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: Sewage Piping, Renew WORK ITEM 2: Refrigerant Piping, Renew WORK ITEM 3: Watertight Scuttles (External), Renew iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Bill of Materials 627 WMEC 099, Rev D, ARRT MSD System Coast Guard Bill of Materials 627 WMEC 327, Rev G, Watertight Doors, Hatches & Scuttles Coast Guard Drawing 618 WMEC 593-056, Rev -, Sewage Discharge Pump Coast Guard Drawing 618 WMEC 593-057, Rev -, Sewage Ejector Pump Coast Guard Drawing 627 WMEC 167-001, Rev L, Schedule of Steel Doors, Hatches, Scuttles &
Manholes Coast Guard Drawing 627 WMEC 516-007, Rev A, Mods Incidental to the Carrier Reefer Plant Install Coast Guard Drawing 627 WMEC 593-002, Rev D, Arrg’t. MSD System Coast Guard Drawing 627 WMEC 601-003, Rev E, General Arrangement – Second and Third Decks Coast Guard Drawing 627 WMEC 601-005, Rev F, General Arrangement – 02 Dk, Bridge Dk, & House
Top
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jan 2014, Coatings and Colors Manual NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary
Services
OTHER REFERENCES
ASTM International (ASTM) F683, 2014, Standard Practice for Selection and Application of Thermal
Insulation for Piping and Machinery ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates Commercial Item Description (CID) A-A-59316, Nov 2016, Abrasive Materials; for Blasting Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2018, Pipe
Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation v (Rev-0)
MIL-A-22262, Jan 2021; Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning 2015 vi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
3 N ***21 inch Diameter
Quick-Acting Watertight Flush
Scuttle, Steel, 3-Dog, OTBD Hinge
NSN: 2040-00-554-6911 2 ea. 2,200.00
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
vii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4 (Inspection report particulars)):
Work Item Title
This section is not applicable to this package.
viii (Rev-0)
PRINCIPAL CHARACTERISTICS
210' WMEC (B-CLASS)
PHYSICAL
Length overall 210' 6" Length between perpendiculars 200' 0" Beam molded 34' 0" Depth molded, main deck amidships 19' 6" Full load displacement 1,170 long tons Draft, full load to baseline amidships *Baseline is 9” below keel amidships
12' 0"
Design drag between perpendiculars 1' 6" Highest projection above baseline *VHF-FM ADF antenna
90' 0"
Shore tie voltage requirements 400A / 440V Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 16-251-B Diesel Engines, 5,000 BHP total Ship's service generators 2 Caterpillar Model 3406B Diesel-driven SR4, 250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle
Emergency generator Caterpillar Model 3306B Diesel-driven SR4, 180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle
Number of propellers 2 Propeller diameter 7' 6" Number of blades, each 4 Pitch Controllable Shaft RPM 300 Shaft diameter 8.25" at exit of hull Anchor & chain Two 2,800 lb Navy Stockless Anchors, 7 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 48,427 gal.
Fresh water total (100%) 11,693 gal.
JP-5 fuel total (95%) 4,683 gal.
Lube oil total (95%) 2,390 gal.
1 (Rev-0)
00000_0121_FLT
REC_00000_FLT_Commercial Project @ CG Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Conditionally Exempt Small Quantity Generator (CESQG).
3.5.2 Test and procedures. The Contractor must be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor must be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be
3 (Rev-0) provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, and must be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor must be aware of the following:
3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
5 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
7 (Rev-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
8 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
9 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
COATING MFG PRODUCT NAME BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
10 (Rev-0)
S_59311_PpngRnwl_SWIT_SLE_0121_SWIT
S19_0021_59311_SRH_0221_630
S19_0022_59311_SRH_0221_630
S19_0023_59311_SRH_0221_630
S19_0024_59311_SRH_0221_630
S20_0013_59311_SRH_0221_630
WORK ITEM 1: Sewage Piping, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew designated sewage piping and valves in Table 1 below
TABLE 1 – PIPING AND VALVES
DESCRIPTION SIZE (IN) LOCATION QUANITITY
Sewage Piping 1.5 4-52-0-M 15 ft Sewage Piping 2 4-52-0-M 28 ft Sewage Piping 3 4-52-0-M 8 ft
Valve 1.5 4-52-0-M 2 ea.
Valve 2 3-72-0-C 1 ea.
Sewage Piping 1.5 3-72-0-C 3 ft.
Sewage Piping 4 4-84-0-Q 36 ft.
Sewage Piping 2 4-84-0-Q 10 ft.
Valve 2 4-84-0-Q 7 ea.
Sewage Piping 1.25 4-32-0-A 5 ft Sewage Piping 1.5 4-32-0-A 10 ft.
Sewage Piping 3 4-32-0-A 3 ft.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Bill of Materials 627 WMEC 099, Rev D, ARRT MSD System Coast Guard Drawing 618 WMEC 593-056, Rev -, Sewage Discharge Pump Coast Guard Drawing 618 WMEC 593-057, Rev -, Sewage Ejector Pump Coast Guard Drawing 627 WMEC 593-002, Rev D, Arrg’t. MSD System
11 (Rev-0)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2018, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
• Bilge and Deck Plating
• A/C and R/W Piping
• Electronics
• Synthoglass on piping to be replaced
3.1.5 Contamination prevention. The Contractor must take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.
3.2 Fluid handling. The Contractor must remove and dispose of removed fluids from the affected piping system, in accordance with all applicable Federal, state, and local regulations.
WARNING
Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.
12 (Rev-0)
3.3 Piping renewal particulars. The Contractor must renew the sewage piping and valves designated in Table 1, using Coast Guard Drawings 618 WMEC 593-056, 618 WMEC 593-057, and 627 WMEC 593- 002 as guidance.
3.3.1 Pipe hangers. Furnish, fit, and install new pipe hangers in accordance with MSS SP-58.
3.3.2 Pipe labeling. The Contractor must label affected piping as follows:
3.3.2.1 Stencil the following onto the pipe surfaces:
• Name of the piping system service.
• Destination, where feasible.
• Direction of flow, indicated by an arrow three inches long pointing away from the lettering
(for reversible flow, point an arrow away from each end of the lettering).
3.3.2.2 Ensure all lettering and arrow(s) are as follows:
• In general, black color except white for dark-colored piping.
• Applied in conspicuous locations and preferably near control valves.
3.3.3 Valve labeling. The Contractor must renew all missing and damaged valve label plates, and install new valve label plates on new valves, in accordance with ASTM F992.
3.3.4 Pipe flushing. The Contractor must flush all new and disturbed piping with clean fresh water until all debris is removed but no longer than five minutes. Ensure flushing fluid is directed to move scale and foreign debris away from installed machinery to prevent possible damage upon operational testing.
Submit a CFR documenting date and time of flushing process and level of pipe cleanliness.
3.3.4.1 Dispose of flushing fluid in accordance with all applicable Federal, state, and local regulations.
WARNING
Do not drain ANY Fluids (including fresh water) into any space, bilge, or exterior location.
3.4 Testing. After all work has been completed, the Contractor must, in the presence of the Coast Guard Inspector, accomplish the following tasks, and submit a CFR:
3.4.1 Hydrostatic test. After all authorized repairs, the Contractor must hydrostatically test all new and disturbed piping and components of the steam piping system in accordance with SFLC Std Spec 0740, Appendix C, Hydrostatic Test. Ensure zero leakage from or permanent deformation of pressure-containing parts by repairing all leaks, deformations, and discrepancies. Submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.4.2 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
13 (Rev-0)
3.4.3 Visual inspection. The Contractor must visually inspect the Urinal Collection Tank, and all associated parts of the Urinal Vacuum System under the deck. Submit a CFR.
3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
3.6 Temporary Restroom Facilities. The Contractor must provide temporary restroom facilities for the duration of sewage piping interruption.
4. NOTES
This section is not applicable to this work item.
14 (Rev-0)
S_55800_PpngRnwl_SWIT_SLE_0121_SWIT
S20_0004_55800 _SRH_0221_630
WORK ITEM 2: Refrigerant Piping, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew designated refrigerant piping, hardware, and associated valves, located in the Passage (2-156-01-L).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627 WMEC 516-007, Rev A, Mods Incidental to the Carrier Reefer Plant
Install Coast Guard Drawing 627 WMEC 601-003, Rev E, General Arrangement – Second and Third
Decks
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary Services NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
OTHER REFERENCES
ASTM International (ASTM) F683, 2014, Standard Practice for Selection and Application of
Thermal Insulation for Piping and Machinery ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates
15 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
• Insulation
• System recovery
• Evacuation and recharging
• Compressor panel
• Food items
3.2 Fluid handling. The Contractor must remove and dispose of removed fluids from the affected piping system, in accordance with all applicable Federal, state, and local regulations.
WARNING
Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.
3.3 Piping renewal particulars. The Contractor must crop and renew valve SLV4, associated hardware, and up to 1 linear foot of associated piping, as shown on Coast Guard Drawing 627 WMEC 516-007, and as designated by the Coast Guard Inspector.
3.3.1 Valve labeling. The Contractor must renew all missing and damaged valve label plates, and install new valve label plates on new valves, in accordance with ASTM F992.
3.3.2 Pipe flushing. The Contractor must flush all new and disturbed piping with clean fresh water until all debris is removed but no longer than five minutes. Ensure flushing fluid is directed to move scale and foreign debris away from installed machinery to prevent possible damage upon operational testing.
Submit a CFR documenting date and time of flushing process and level of pipe cleanliness.
3.3.2.1 Dispose of flushing fluid in accordance with all applicable Federal, state, and local regulations.
WARNING
Do not drain ANY Fluids (including fresh water) into any space, bilge, or exterior location.
16 (Rev-0)
3.4 Testing. After all work has been completed, the Contractor must, in the presence of the Coast Guard Inspector, accomplish the following tasks, and submit a CFR:
3.4.1 Hydrostatic test. After all authorized repairs, the Contractor must hydrostatically test all new and disturbed piping and components of the affected piping system in accordance with SFLC Std Spec 0740, Appendix C, Hydrostatic Test. Ensure zero leakage from or permanent deformation of pressure-containing parts by repairing all leaks, deformations, and discrepancies. Submit a CFR.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.4.2 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
3.6 Piping insulation installation. The Contractor must install new insulation materials over the exposed pipe surfaces at thicknesses appropriate to the application and temperature ranges specified in ASTM F683 Tables identified in Table 1 below and in accordance with details in NAVSEA Drawing 804- 5959214:
• Associated pipe hangers
• Valves
• Fittings
• Flanges
CAUTION
Use glass cloth lagging only in high traffic areas where insulation is subject to damage.
TABLE 1 - PIPING SYSTEMS INSULATION INSTALLATION REFERENCES
PIPING SYSTEMS
APPLICATION
TEMPERATURE RANGE ASTM F683 TABLES
Interior refrigerant, hot water, cold water, and chill water piping
-20 to +180 Deg. F S1.1 and S1.5
3.6.1 Coat the newly installed insulation using the system specified for “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam” in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems).
3.7 Temporary service particulars. The Contractor shall provide the below listed temporary services, in accordance with SFLC Std Spec 8635.
TABLE 1 - SERVICE SELECTION
17 (Rev-0)
*SUB-
PARAGRAPH TITLE Y/N
3.3.14 Refrigerated stores. 400 square feet of refrigerated space and 400 square feet of frozen food space.
Y
This section is not applicable to this work item.
18 (Rev-0)
S_16802_ESD_0121_SWIT
S20_0007_16802_SRH_0221_630
WORK ITEM 3: Watertight Scuttles (External), Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the external watertight scuttles identified in Table 1.
TABLE 1 - WATERTIGHT SCUTTLES
DESCRIPTION LOCATION DRAWING
QAWTS 02-58-2; 21” Diameter Quick-Acting Watertight Flush
Scuttle, Steel, 3-Dog, OTBD Hinge
CIC Room (02-56-2-C) BUSHIPS 805-1623056
QAWTS 02-58-1; 21” Diameter Quick-Acting Watertight Flush
Scuttle, Steel, 3-Dog, OTBD Hinge
CIC Room (02-56-2-C) BUSHIPS 805-1623056
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N ***21 inch Diameter Quick-
Acting Watertight Flush Scuttle, Steel, 3-Dog, OTBD
Hinge
NSN: 2040-00-554-6911 2 ea. 2,200.00
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Bill of Materials 627 WMEC 327, Rev G, Watertight Doors, Hatches & Scuttles Coast Guard Drawing 627 WMEC 167-001, Rev L, Schedule of Steel Doors, Hatches, Scuttles &
Manholes Coast Guard Drawing 627 WMEC 601-005, Rev F, General Arrangement – 02 Dk, Bridge Dk, &
House Top
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
19 (Rev-0)
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Commercial Item Description (CID) A-A-59316, Nov 2016, Abrasive Materials; for Blasting MIL-A-22262, Jan 2021; Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface
Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning 2015 The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to, the following:
• Insulation
• Bulkhead
• Electronic Equipment
• Secure space
NOTE
Geometric dimensioning and tolerance variances and minor hardware differences are to be expected with the Government-furnished closures. These variances and differences are not limited to the following: location and physical size of the hinge assemblies; location, physical size, and number of flush mounted pockets; location, size, and orientation of securing devices.
3.2 Renewal. The Contractor must crop, remove, and dispose of the scuttles identified in Table 1 of this work item, including the associated coaming in accordance with SFLC Std Spec 0740 and using Coast Guard drawings 627 WMEC 167-001 and 627 WMEC 601-005 as guidance.
20 (Rev-0)
3.2.1 Visually inspect exposed adjacent plating and submit a CFR.
3.2.2 Install GFP scuttle in place of the one removed.
3.2.3 Perform all necessary modifications not limited to relocation, fabrication and installation of a new securing device, and modifications to ensure all renewed items properly fit and function. At the direction of the Coast Guard Inspector, perform all necessary relocation and modification of securing latches.
3.2.4 Modify each CIC door by welding a plate to cover the existing opening, made for the installation of a T-handle, in order to prevent outside access, as designated by the Coast Guard Inspector, and as seen on the existing doors.
3.2.5 Provide and install new gaskets and fasteners for each new installation identified in Table 1.
NOTE
The CIC room is a secure space. Security measures need to be in place if scuttle is removed for a prolonged period of time.
3.3 Boundary test. Upon complete renewal of each structural closure, the Contractor must perform the following boundary tests in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR.
• chalk test
• water hose test
NOTE
Do not paint knife-edges, gaskets, or any moving parts; including dogs, nuts, wedges, spindles, yokes, packing, connecting rods and hinge pins.
3.4 Preservation. The Contractor must prepare and coat the surfaces of all installed items identified in Table 1 of this work item in accordance with Table 2 and as determined by the material to be preserved.
TABLE 2 – SURFACE PREPARATION AND COATING
PREPARATION COATING
SURFACE STEEL ALUMINUM STEEL ALUMINUM
SCUTTLE
TOP
SSPC-SP10/NACE
No. 2, using grit conforming to MIL- A-22262 (1.5 to 2.5 mil anchor profile) -Or-
SSPC-SP 11 (1.0
mil anchor profile)
Brush blast to bare metal with clean, fine aluminum oxide, garnet or equivalent inert material conforming to CID A-A-59316, Type I & IV (1.0-1.5 mil anchor profile).
-Or- Power tool clean, using non-metallic abrasive padding, to remove all coatings and contamination.
SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) “Freeboard/ Superstructure/Mast” Freeboard/Superstruct ure, Steel – Prone to Mechanical Damage or High Wear
SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior Painting Systems) “Freeboard/ Superstructure/Mast” Option I for Freeboard/Superstruct ure, Aluminum or Galvanized Steel
SCUTTLE SSPC-SP 11 (1.0 Power tool clean, using SFLC Std Spec 6310 , Appendix B (Cutter and
21 (Rev-0)
BOTTOM mil anchor profile) non-metallic abrasive padding, to remove all coatings and contamination.
Boat Interior Painting Systems) “Door, Joiner, Option I”
3.4.1 Touch-up preservation. The Contractor must prepare and coat all disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.).
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.5 Operational test, post repairs. After completion of work, the Contractor must thoroughly test (in the presence of the Coast Guard Inspector) and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
The Contractor must demonstrate:
• Closures are properly secured to prevent accidental or unintentional movement.
• Securing latches adequately engage closures and positively lock into place without excessive force or manipulation by the operator.
4.1 Damage control decals. Ship’s force will apply damage control decals.
| Revisions Record |
| Consolidated List of References |
| Consolidated List of Government-furnished Property |
| Consolidated List of Critical Inspection Items |
| Principal Characteristics |
| General Requirements |
| WORK ITEM 1: Sewage Piping, Renew |
| WORK ITEM 2: Refrigerant Piping, Renew |
| WORK ITEM 3: Watertight Scuttles (External), Renew |
File details come from the government source that posted it. Updated .