Attachment 2 Statement of Work Solicitation 1232SA26Q0591.docx
DOCX document 58 KB Posted
- Attached to
- Procurement and Installation of AMSCO® 250LS Small Steam Sterilizers and Electric Pure Steam Generator
- Solicitation number
- 1232SA26Q0591
About this file
This is a Statement of Work (SOW) for USDA Agricultural Research Service procurement and installation of sterilization equipment at the Edward T. Schafer Agricultural Research Center in Fargo, North Dakota. The contractor must furnish two AMSCO 250LS (or equal/similar) small steam sterilizers with chamber dimensions of 20" x 20" x 38", including loading racks, two shelves, loading cart/transfer carriage, and auto utility startup/shutdown capabilities. The sterilizers must be BSL2 compliant and include new green mode energy conservation features. Additionally, the contractor must furnish one electric pure steam generator with carbon steel construction, a 3-stage impurity separation process, and continuous hot water circulation design, compatible with the AMSCO sterilizers and operating on 208v power.
Installation requirements include uncrating, inspecting, assembling, and positioning both sterilizers—one in Range J with its accompanying steam generator and one outside Range B—at the Northern Crop Science Laboratory greenhouse complex. The contractor must make all air, steam, water, and drain utility connections from building termination points (maximum 6 feet) using flexible or hard-piping per local regulations, and must handle electrical connections either by supplying and fitting cable within 6 feet or by providing final termination to equipment connection points. All work must comply with state and federal building codes. Deliverables due within 30 days of award include equipment cutsheets with dimensions and a work schedule for completion within 60 days. The contractor must provide operation and maintenance manuals in hard copy and PDF formats, conduct witnessed equipment startup testing with USDA personnel present, and provide a minimum one-year parts and labor warranty. Key personnel must include staff experienced in steam piping and controls, with the lead supervisor holding a Journeyman's License. All contractor personnel require valid U.S. photo identification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 Price Schedule of Line Items Solicitation 1232SA26Q0591.xlsx | XLSX spreadsheet | |
| Attachment 1 Terms and Conditions Solicitation 1232SA26Q0591.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Deliverables / Schedule: 60 days after notice to proceed. | 4 |
| 5.0 Contractor’s Key Personnel | 5 |
| 6.0 Security Requirements | 5 |
| 7.0 Section 508 – Electronic and Information Technology Standards | 5 |
| 8.0 Performance Requirement Measures. | 5 |
Project Furnish two (2) AMSCO® 250LS (or equal/similar) Sterilizers and one (1) Electric Pure Steam Generator.
Installation of two (2) AMSCO® 250LS (or equal/similar) Sterilizers and one (1) Electric Pure Steam Generator.
General Information
1.0 Scope of Work
USDA, ARS, Plains Area (PA), Edward T. Schafer Agricultural Research Center, Northern Crop Science Laboratory (NCSL) Greenhouse Complex, 1307 18th Street N., Fargo, ND 58102 has a requirement for a Sterilizer/Autoclave installed in Range J, NCSL Greenhouse complex, with the option for a second unit installed outside Range B. The Range J Sterilizer will require a Electric Steam Generator.
2.0 Background
The existing derelict sterilizers have become obsolete and will be removed by the USDA Facilities Department prior to instillation of new.
Contractor Requirements
3.0 Technical Requirements / Tasks
Technical Requirements
1. Furnish two (2) AMSCO® 250LS (or equal/similar) Small Steam Sterilizers.
AMSCO® 250LS (or equal/similar) Small Steam Sterilizers.
Salient Characteristics:
· Sterilizers must be BSL2 compliant.
· Chamber size must be 20” x 20” x 38” (508 x 508 x 965 mm).
· Loading rack and two shelves (20” x 20” x 38”).
· Loading Cart/Transfer Carriage.
· Auto utility start up and shutdown.
· Standby mode – shuts down the jacket and generator.
· New green mode - only turns off the jacket, conserving energy, can return to temperature quickly.
2. Furnish one (1) Electric Pure Steam Generator.
Electric Pure Steam Generator.
Salient Characteristics:
· Must be compatible with AMSCO® 250LS (or equal/similar) Small Steam Sterilizer (20” x 20” x 38”).
· Must be Carbon Steel.
· 3-stage impurity separation process.
· Continuous hot water circulation design.
Tasks
1. Installation of two (2) AMSCO® 250LS (or equal/similar) Small Steam Sterilizers (20” x 20” x 38”) and one (1) Carbon Steel Electric Pure Steam Generator.
INSTALLATION REQUIREMENTS.
A. Install one (1) AMSCO® 250LS (or equal/similar) Small Steam Sterilizer Chamber Size (20” x 20” x 38”) and one (1) Carbon Steel Electric Pure Steam Generator required for Sterilizer in Range J at Range J - Northern Crop Science Laboratory (NCSL) Greenhouse Complex.
· Uncrate the equipment at the site and inspect for shipping damage.
· Assemble or re-erect the equipment.
· Assemble equipment piping packages and accessories where provided.
· Install standard final panels where provided.
· Move the equipment to specified facility location. Customer to provide clear, unimpeded ingress to installation site. No special rigging or rigging equipment is included in this scope unless previously addressed and priced.
· Put the equipment into its place and level it (See Seismic restrictions).
· Make all air, steam, water & drain utility connections from building termination to the equipment (maximum of 6ft/1.8m) using flexible or hard-piping* according to local regulations.
· Install one (1) 208v Carbon Steel Electric Steam Generator required to supply steam to 20” x 20” x 38” Sterilizer.
· Make electrical connections to the equipment, a service which includes one of the following which must also be specified in advance through contact with the STERIS District Service Manager. EITHER – supply and fit electrical cable from the junction box within 6ft/1.8m of unit to the STERIS equipment electrical connection point according to local regulations. Wall or ceiling penetrations and junction / isolation /disconnect box to be supplied by others, OR – the final termination / connection to the cable (supplied by others) to the STERIS equipment electrical connection point according to local regulations.
· Remove and dispose offsite all packaging material and cleanup of site daily.
B. Install one (1) AMSCO® 250LS (or equal/similar) Small Steam Sterilizer Chamber Size (20” x 20” x 38”) outside Range B at Range B – Northern Crop Science Laboratory (NCSL) Greenhouse Complex.
· Uncrate the equipment at the site and inspect for shipping damage.
· Assemble or re-erect the equipment.
· Assemble equipment piping packages and accessories where provided.
· Install standard final panels where provided.
· Move the equipment to specified facility location. Customer to provide clear, unimpeded ingress to installation site. No special rigging or rigging equipment is included in this scope unless previously addressed and priced.
· Put the equipment into its place and level it (See Seismic restrictions).
· Make all air, steam, water & drain utility connections from building termination to the equipment (maximum of 6ft/1.8m) using flexible or hard-piping* according to local regulations.
· Install one (1) 208v Carbon Steel Electric Steam Generator required to supply steam to 20” x 20” x 38” Sterilizer.
· Make electrical connections to the equipment, a service which includes one of the following which must also be specified in advance through contact with the STERIS District Service Manager. EITHER – supply and fit electrical cable from the junction box within 6ft/1.8m of unit to the STERIS equipment electrical connection point according to local regulations. Wall or ceiling penetrations and junction / isolation /disconnect box to be supplied by others, OR – the final termination / connection to the cable (supplied by others) to the STERIS equipment electrical connection point according to local regulations.
· Remove and dispose offsite all packaging material and cleanup of site daily.
4.0 Deliverables
· Submittals (must be received no more than 30 days after award).
· Provide cutsheets on all mechanical equipment to be replaced. Ensure that dimensions are included.
· Provide work schedule, including schedule for delivery of materials, no more than 60 days from the date of the award.
· Testing. USDA must be notified in advance of equipment startup upon completion of repairs. USDA will be present to witness and assist in verification of operation.
· Contractor at completion of project will do a walk through with USDA personnel to address any deficiencies.
· O&M. Provide all operation and maintenance manuals in both hard copy and digital formats (Adobe Acrobat PDF file is appropriate).
· Warranties. Provide a minimum of one-year parts and labor warranty or manufacturer’s warranty, whichever is greater.
· Conduct all work in accordance with the State and Federal building codes.
5.0 Contractor’s Key Personnel
Contractor must have staff experienced in steam piping and controls. Lead man on job must have Journeyman’s License in their respective trade.
6.0 Security Requirements
All personnel shall have a U.S. photo ID, such as a U.S. Driver License, or U.S. Passport. Contractor shall meet with the Maintenance Staff on 1st day of construction to coordinate temporary parking permits, badges and keys as necessary. All contractors shall have a U.S. photo ID, such as U.S. Driver’s License or U.S. passport.
7.0 Section 508 – Electronic and Information Technology Standards Electronic submittals and manuals are to be in Adobe file format.
8.0 Performance Requirement Measures.
Items will be inspected before payment will be rendered.