Attachment 2- Statement of Work.pdf
PDF 314 KB Posted
- Attached to
- Overhaul of Check Valves
- Solicitation number
- 70Z03821QJ0000060
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5- Response to Questions (2).pdf | ||
| Attachment 4- Responses to Questions.pdf | ||
| Attachment 3- Terms and Conditions.pdf | ||
| Attachment 1- Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
Statement of Work (SOW)
Overhaul Check Valve
70Z03821QJ0000060
1.0 Scope
1.1 This SOW requirement is for the anticipated following component(s):
Description National Stock
Number (NSN)
Part Number
(P/N)
Base
Year
Qty
Option
Year
One
Option
Year
Two
Option
Year
Three
Option
Year
Four
Check
Valve
4820-01-308-4672 83810-105 or
70307-82806-
10 10 10 10 10
*Annual estimate is ten (10) per year.
The component(s) are utilized on the MH-60T aircraft. Upon receipt of the components, the Contractor shall perform a test and evaluation to determine the condition of the component. Any component where no faults are found (NFF) or the component is determined to be Beyond Economical Repair (BER) shall be returned to the United States Coast Guard (USCG) in accordance with (IAW) Sections 2.6. All other components shall be overhauled IAW this SOW.
1.2 The objective for the Contractor will be to provide the Aviation Logistics Center (ALC) with overhauled components that are Ready for Issue (RFI) in support of our efforts to sustain forty-five (45) aircraft. The Contractor should be capable of delivering the overhauled components within the delivery requirements established in this SOW. The USCG anticipates the material will be shipped to the vendor within five (5) business days after issuance of a task order. The Contractor will not be penalized if the
USCG is not timely in the shipment of the material.
2.0 Overhaul
2.1 Requirements
Work under this contract shall be performed at the Contractor’s facility or USCG approved facility. The
Contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and overhaul the components listed in this contract at the firm-fixed prices listed in the schedule.
The Contractor shall inspect, test, and determine if a component is NFF, BER or requires overhaul.
2.1.1 Certification
In accordance with the National Defense Authorization Act for Fiscal Year 2004, Public Law 108–136, §
802, 117 Stat. 1392 (2004), the Naval Supply (NAVSUP) Systems Command, Weapons Systems Support
(WSS), Philadelphia, PA, is the design control activity and as such, has the sole authority for approving sources for the procurement, repair, and overhaul of components managed by the Navy. Responsible
Contractors are limited to only NAVSUP WSS approved sources for the components listed herein.
2.2 Specific Tasks
2.2.1 Overhaul Services
The Contractor shall perform all overhaul services in accordance with the SOW and Federal Aviation
Regulations Parts 43 and 145. The Contractor shall perform a thorough visual and technical inspection of each component requiring overhaul and correct all deficiencies found. This shall include replacement of broken parts and the removal of any foreign matter or corrosion. Parts found to be defective shall be
STATEMENT OF WORK
OVERHAUL CHECK VALVE
replaced with new parts. A DD Form 1577-2, Unserviceable Tag-Material, or a CG-1577-A (11-90), Unsatisfactory Report Tag, will be attached to each Not Ready for Issue (NRFI) component describing faults found. Once the components have been overhauled to like new condition, the Contractor shall remove the unserviceable tag from the component.
2.3 Place of Performance
The place of performance will be at the Contractor’s facilities.
2.4 Government Furnished Resources
The Government will provide the components specified in the overhaul section to the Contractor for overhaul work required under this contract.
The Government will not furnish any drawings, parts, hardware, specifications, tooling, or any other overhaul documents required to overhaul the components specified herein.
2.5 Procedures
Sikorsky Aircraft Corporation (SAC) is the original equipment manufacturer (OEM) of the components listed in section 1.1 and the only NAVSUP WSS approved vendor when procuring new stock. The
Contractor shall perform all overhauls IAW the Component Maintenance Manuals (CMM) listed in section 3.1. All services shall be accomplished on an as required basis, as directed by the Government.
Request for clarification shall be directed to the Contracting Officer.
2.5.1 The Contractor must have access to required overhaul specifications and test/acceptance criteria and data to ensure all components are tested and overhauled IAW the current specifications and procedures. The USCG may review overhaul manuals and performance/test/acceptance criteria as required. The Contractor is solely responsible for obtaining any and all specifications required for this effort. Original design or functional capabilities of the end item and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.
2.6 Test and Evaluation
If, after visual and functional inspections, a component is found to be RFI (No Fault Found) or is considered to be BER IAW Section 2.8, the Contractor will be allowed the firm fixed price for
NFF/BER/Scrap only. The Contractor shall prepare a failure data report IAW Section 2.10 in these instances. This report shall be included with the returned component. The parts shall be marked "RFI” or
“BER” and returned IAW Section 2.8. A copy of the failure data report shall be attached to the invoice.
2.7 Discrepancy Evaluation
NRFI components shall be overhauled and returned to RFI condition IAW the functional performance specifications. Components shall be overhauled for the specific fault noted on the DD Form 1577-2, Unserviceable (Repairable) Tag-Material, or CG-1577-A (11-90), Unsatisfactory Report Tag, which will be attached to each NRFI component. The Contractor shall perform an inspection and correct deficiencies found. This shall include, but is not limited to, replacement of missing or broken parts and the removal of any foreign matter or corrosion.
Discrepancies (over and above repair components) may be identified during initial evaluation. Over and above repair components consist of any findings of unusual damage IAW Section 2.14. The Contractor shall be responsible for documenting and reporting all over and above repair components to the
Contracting Officer after receipt of components at the Contactor’s facility. The Contractor’s quote shall be valid for thirty (30) calendar days and the documentation must include:
Description of each discrepancy found
Number of man-hours per discipline required to complete each discrepancy
Total dollar amount for each discrepancy
Total dollar amount for complete list of discrepancies
Delivery Order Number and applicable Line Item.
2.7.1 The Contracting Officer will be responsible for reviewing the list of discrepancies and either accept, negotiate, or decline the Contractor’s proposal. The Contracting Officer shall provide a response to the quotation within thirty (30) calendar days after receipt. Additional work shall not be performed until the quotation is accepted and a modification to the task order is provided by the Contracting Officer.
The Contractor will have ninety (90) calendar days (plus the number of calendar days it takes the
Contracting Officer to provide a response to the over and above quotation) to complete the repairs and return the component(s) to the Government. In the event that a quotation is declined by the Contracting
Officer, the Contractor shall return the component “As-Is”. The Contractor will be authorized the firm-fixed Test and Evaluation fees established in contract.
2.8 Beyond Economic Repair
After receipt of a quotation for over and above overhaul component, the Contracting Officer may determine that a component is BER and will provide a written modification to the Contractor. The USCG will provide disposition instructions for all components that are considered BER. The Contractor shall not dispose of a component until they have been notified by a written modification to the order. When returning the component to ALC, the component(s) shall be clearly marked as “BER” with the supporting evidence. The Contractor will be authorized the firm-fixed BER/Scrap fees.
2.9 Scrapping at Vendor
Components can be scrapped on site at the overhaul facility when a government representative properly witnesses the scrapping of a flight safety critical aircraft part. The Contractor shall submit a letter to ALC on corporate stationary stating the part or parts have been “mutilated”. The letter shall include the serial number (S/N) if applicable, NSN, P/N, quantity, and be dated and signed by the Defense Contract
Management Area Office or government representative. The letter serves as a cradle to grave record and shall be filed with the contract. Receipt of the contract line item number cannot take place at ALC until the proper scrap documentation has been received. Failure to provide adequate documentation could cause rejection of submitted invoices resulting in postponement of payment.
2.10 Failure Data Report
The Contractor shall submit a failure data report for each overhauled component. This report shall include NSN, P/N, S/N, nomenclature, date of overhaul, contract task order number, line item number, description of overhauled/repair failure, the USCG’s reported failure, a listing of parts repaired, and a listing of parts replaced. The Contractor’s in-house work order may be used to satisfy this requirement if it includes the information requested above. This report shall be attached to the packing slip and shipped with the overhauled component.
2.11 Replacement Parts
Parts of a component found to be in a serviceable condition as a result of functional testing shall be reused. Missing parts and parts found to be defective or that require replacement by manufacturer’s instructions shall be replaced with parts meeting the manufacturer’s specifications and drawings.
Replacement parts shall be new. The cost for parts that are replaced systematically during overhaul shall be included in the price listed in the schedule for these operations. The Contractor shall submit a listing of all systematically replaced parts and other replacement parts to be utilized in support of the maintenance procedure of each component. The replacement parts listing must show the following information: Component Description, OEM P/N, and Price.
2.12 Separately Priced Replacement
Pricing for other overhaul components and supply material, yet unspecified by P/N contract award, will be incorporated as firm fixed prices after negotiation of the first-time replacement. The Government reserves the right to provide separately priced replacement parts as Government furnished property on an as-needed basis as determined by the Contracting Officer. The Contracting Officer will either issue a modification to the task order authorizing use of the separately priced replacement part(s) or provide disposition instructions. The delivery schedule will be adjusted accordingly for any delay associated with requesting and obtaining the approval to utilize the specified separately priced replacement part(s).
2.13 Corrosion Treatment
During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part. Corrosion removal and treatment of affected areas will be accomplished IAW OEM specifications and FAA Advisory Circular AC 43-4B dated September 11, 2018, Corrosion Control for
Aircraft.
2.14 Exclusions – Unusual Damage
Prices do not include components that have been cannibalized or severely damaged due to mishandling, water immersion, or crash damage. Additionally, the MH-60T helicopter is used primarily around salt water at low altitude for search and rescue missions. Therefore, corrosion is to be anticipated and is considered "normal" for the aircraft. Corrosion does not constitute unusual damage.
2.14.1 The Government shall not be liable for any amount expended by the Contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the Contracting Officer.
3.0 Applicable Documents
3.1 Directives
The USCG does not own nor can it provide the required directives for this requirement (except where stated below).
Overhaul services must be performed IAW the procedures established in this section. The following documents are listed in order of precedence. Latest revisions of all manuals shall apply. The information contained in this section is not intended to be all inclusive nor to detract from or modify procedures outlined in the manuals. If the applicable technical manual does not cover a procedure, the Contractor shall utilize the OEM overhaul manual. If the OEM manual does not cover a procedure, the Contractor shall utilize the best commercial business practice. Where an application of “best commercial practice” is in conflict with these manuals, the Contracting Officer may approve deviation from requirements. When applicable, each manual will specify if the Export Control Act applies.
All OEM shop, inspection, overhaul, repair, or other OEM CMM and revisions as applicable
All OEM service bulletins, amendments, modifications, and specifications as applicable
FAA Advisory Circular AC 43-4B, dated September 11, 2018, Corrosion Control for Aircraft
Coast Guard Aviation Logistics Center Instruction 4100.1A, Aviation Logistics Center Material
Disposal Procedures (included as a separate attachment to this Federal Business Opportunities
(FBO) notice under CG ALCINST 4100.1A)
Coast Guard Aviation Logistics Center Instruction 4855.4A, Policy and Quality Assurance
Procedures for the Receipt Inspection of New, Repaired, and Overhauled items from Vendors
(included as a separate attachment to this FBO notice under CG ALCINST 4855.4A)
Coast Guard Aviation Logistics Center Instruction 4200.3C, ALC Spare Parts Breakout/New
Product Development (included as a separate attachment to this FBO notice under CG ALCINST
4200.3C)
The USCG has the sole responsibility for the development of internal procedures for the Aviation
Logistics Command’s Spare Parts Breakout Program. Any commercial Contractor that manufactures, repairs, overhauls, reverse engineers, or the like any USCG component is subject to Coast Guard Aviation
Logistics Center Instruction 4200.3C, ALC Spare Parts Breakout/New Product Development.
Occupational Safety and Health Standards (OSHA) 1910.1025 (Lead)
OSHA 1910.1026 (Chromium VI)
OSHA 1910.1027 (Cadmium)
Military Standard (MIL-STD) MIL-STD-129R, Military Marking For Shipment and Storage
MIL-STD-2073-1E, Standard Practice For Military Packaging
3.2 Availability of Documents
The documents listed in section 3.1 may be available from the USCG. Before obtaining copies of these documents, Contractors shall be registered in the Defense Logistics Agency’s Joint Certification Program.
More information on this certification can be found at http://www.dlis.dla.mil/jcp/Default.aspx. After ensuring registration, the Contractor shall complete Department of Homeland Security Form 11000-6, Sensitive but Unclassified Information Non-Disclosure Agreement (Attached to the Solicitation) and return with a written request to Hayley.W.Osmon2@uscg.mil referencing solicitation number
70Z03821QJ0000060. Copies will not be posted to the Federal Business Opportunities website.
3.2.1 The USCG will only release these documents to United States (US) businesses that have followed the above procedures. The documents will not be released to any foreign entity. If the U.S. business plans to release these documents to any foreign entity, they must first provide the USCG with a copy of a valid Technical Assistance Agreement and Directorate of Defense Trade Control form DSP-5 authorizing release to that entity.
http://www.dlis.dla.mil/jcp/Default.aspx mailto:Hayley.W.Osmon2@uscg.mil
4.0 Government Property
4.1 Government Furnished Property
Government furnished property will be shipped to the Contractor’s facility from ALC and documented using DD Form 1577-2, Unserviceable (Repairable) Tag-Material, CG-1577-A (11-90), Unsatisfactory
Report Tag, or Form 1348. These documents will accompany and remain with the equipment.
Equipment shall be returned to ALC upon completion of the task order, unless otherwise directed by the
Contracting Officer.
4.2 Government Property Records
Upon receipt, the Contractor shall update Government Property Records based on the DD Form 1577-2, Unserviceable (Repairable) Tag-Material, CG-1577-A (11-90), Unsatisfactory Report Tag or Form 1348 information provided and any discrepancies. The Contractor shall account for all end-components received from, and shipped to, the Government. The Contractor shall provide a copy of its Government
Property Records to the Contracting Officer no later than the 15th of each month. Government Property
Records will include the following minimum information:
Kit/Equipment/Component Description, Part Number, Serial Number
USCG consignee
Date received
Status of contract service
Expected contract service completion date.
5.0 Improvements
5.1 Service Bulletins
The Contractor shall provide the Contracting Officer with two (2) copies of all service bulletins within ten
(10) calendar days of receipt. The Contracting Officer will notify the Contractor in writing when incorporation of mandatory or optional service bulletins is required. The Contractor shall submit, within thirty (30) calendar days after receipt of this notification, a detailed proposal which shall include a listing of replacement parts and/or materials required, the time needed to affect the modifications, estimated price breakdown of each part, and the number of labor hours required.
5.2 Service Bulletins, Modifications, Engineering Change Proposals (ECP), Local Engineering
Change Proposals (LECP) and Time Compliance Technical Orders (TCTO)
The Contracting Officer shall notify the Contractor in writing of components requiring incorporation of a service bulletin, modification, ECP, LECP, or TCTO. Upon receiving such notice, the Contractor shall submit, within thirty (30) calendar days, a firm fixed price (FFP) proposal for an incremental charge to be assessed each time the service bulletin or change is incorporated. The proposal shall contain a breakdown of material and labor costs based upon the FFP labor rates and material factors. The incremental charge agreed upon for incorporation of a service bulletin shall apply only to those components for which the
Contractor has incorporated a required service bulletin, not those for which the service bulletin has been previously incorporated. Upon agreement of an incremental charge and issuance of an order modification to reflect this change, the service bulletin shall be incorporated into each subsequent component received at the overhaul facility if the service bulletin has not already been incorporated. When incorporation of a service bulletin changes the P/N of the component contained in the schedule, the new P/N and NSN (if applicable) will be added to the order via modification.
6.0 Quality
6.1 Quality Control
The Contractor is required to be certified and maintain a quality system that complies with the requirements of International Organization for Standardization 9001-2000 Quality Management Systems
– Requirements or equivalent. The Contractor is responsible for performing or assuring all inspections, tests and calibration necessary to substantiate that the goods or services furnished conform to
Government’s requirements. The Contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements. Records of conformance shall be maintained on file at the Contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at
Contractor’s facility to verify the existence, adequacy and effectiveness of the quality system. Upon request of the Government, the Contractor(s) shall forward a copy of their current certification and
Quality Assurance Manual for review.
6.2 Warranty
The Contractor’s standard warranty for overhauled components will be incorporated into the contract.
7.0 Records and Reports
7.1 Flight Critical
The component(s) within this SOW is considered FLIGHT CRITICAL. A flight critical safety item is a part, assembly, installation, or production system with one or more critical characteristics that, if not conforming to the design data, or quality requirements, would result in an unsafe condition. Unsafe conditions related to mishap severity I (Catastrophic) and II (Critical), and include conditions which could cause loss or serious damage to the end item or major component, loss of control, serious injury to personnel, or death of personnel.
7.2 Contractor Verification of Receipt of Components
Serial Number (S/N) tracking shall be used for validating the correct component(s) were received at the
Contractor’s overhaul facility and returned to the USCG. Upon receipt of the component(s) from the
USCG, the Contractor shall verify each component received to ensure that the S/Ns match the ones specified in the order within five (5) calendar days. Should a discrepancy be identified, the Contractor shall notify the Contracting Officer in writing of the discrepancy. Email notification is acceptable. The
USCG utilizes an S/N tracking system and places high priority on parts integrity within aircraft components. As a result, any part which is determined to be in a serviceable condition as a result of inspection and functional testing shall be reused in the component from which it was removed, if practical, with the exception of parts specifically replaced during the overhaul as required by the directives as specified within the order.
Occasionally, a component may be received without a data plate. When a data plate is missing, the
Contractor shall notify the Contracting Officer in writing requesting approval of serial number assignment. Upon the Contracting Officer’s acceptance of the serial number proposed, a modification may be issued stating the serial number to be assigned. Upon receipt of a fully executed modification authorizing assignment of the stated serial number, the Contractor shall affix a new data plate to the component. The data plate shall include all the required information about sited component including the newly assigned S/N.
7.3 Certificates
The Contractor shall maintain NAVSUP WSS certifications for overhaul of components identified in the schedule for the entire duration of this contract. The Contractor shall provide immediate notification to the Contracting Officer upon loss of any required certifications. The Contractor shall also:
Comply with the certification/documentation requirements specified herein.
Attach certifications/documentation to the outside of the shipping container.
All components overhauled under the provisions of this contract must be airworthy and suitable for installation on USCG aircraft. Each returned component shall be tagged with a DD Form 1574
Serviceable Condition Code Tag or a FAA Form 8130-3, Airworthiness Approval Tag, completed in its entirety. The Contractor should furnish a Certificate of Airworthiness in accordance with FAA procedures (or USCG approved alternate procedure) and a Certificate of Conformance (COC) IAW FAR
52.246-15 for all components. If the Contractor cannot provide an Airworthiness Certificate, the alternate
ALC MRR Engineering approved document is a COC. The COC shall be signed by an authorized official of the approved source and must specify the nomenclature, manufacturer’s P/N, and date of manufacture.
The Contractor’s FAA certification must reflect authorization to repair the exact category f component specified in this SOW. These forms shall be packaged with each component and copies shall be included with the invoice. FAILURE TO SUBMIT THE APPROPRIATE CERTIFICATES SHALL
CONSTITUTE AN IMPROPER INVOICE AND WILL RESULT IN NONPAYMENT.
The COC shall be signed by an authorized official of the approved source and must specify the nomenclature, manufacturer's P/N, and date of manufacture. For Production Approval Holder, a COC and a copy of the FAA Parts Manufacturer Approval or other manufacturing authority shall be provided.
Contractors shall also provide documentation reflecting the complete unbroken history of ownership of the parts from purchase from the approved manufacturing source until delivery to the USCG.
7.4 Monthly Production Report
The Contractor shall submit a monthly production report to the Contracting Officer no later than the tenth
(10th) business day of each month. The production report shall provide the status of each contract line item number (CLIN) received, being overhauled, and shipped during the monthly reporting period. Any format is acceptable as long as the report provides the following information; nomenclature, P/N, NSN, S/N, CLIN, task order, and receipt date at Contractor’s facility, date scheduled to be inducted, are inducted, date scheduled for delivery, total days in work, if the part is late, and any comments.
8.0 Delivery Requirements
8.1 Standard delivery and monthly output rate after induction for each components is listed below.
Induction shall be no later than fifteen (15) calendar days to meet the contract scheduled delivery date.
Nomenclature NSN Delivery days after Induction Minimum rate per Month
Check Valve 4820-01-308-4672 60 2
8.2 The USCG desires early deliveries therefore early shipments are encouraged at no additional costs to the Government. In the event the Contractor anticipates or encounters difficulty in complying with the delivery schedule or date, they shall immediately notify the Contracting Officer in writing. All requests for time extensions shall be in writing and shall include substantiation of the need for such time extension(s) IAW FAR 52.212-4(f), excusable delays. If nonperformance is not covered by an excusable delay, the Contractor and the Contracting Officer shall negotiate consideration for the approval of the extended delivery date. A modification will be issued to the order to reflect the consideration and the extension.
8.3 F.O.B. Point
The Freight on Board (F.O.B.) point for shipments under this contract is F.O.B. destination. The shipping charges must be included as a separate line item on the invoice. For shipping charges over $100.00 an invoice from the actual shipping company must be attached to the invoice (a quote will not suffice). The amount shown on the invoice must match the amount on the freight invoice EXACTLY.
9.0 Contract Information
9.1 Contract Administration Data
Only the Contracting Officer is authorized to issue and modify any order, approve changes in any of the requirements, or obligate funds. Notwithstanding any term or condition contained elsewhere in the order, the authority to modify the order remains solely with the Contracting Officer. If the Contractor makes any order changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the order to cover any increase in costs that may result. The Contracting Officer has the authority to perform any and all post-award functions in administering and enforcing an order IAW its terms and conditions.
9.2 Laws and Regulations
The Contractor shall be knowledgeable of and comply with all applicable federal and state laws and regulations and any local laws and ordinances regarding environmental protection. In the event environmental laws and/or regulations change during the term of this order, the Contractor is required to comply as such laws come into effect.
9.3 Quarterly Audits
The ALC conducts quarterly audits validating Government Furnished Property at commercial Contractor facilities. The Contractor shall follow the instructions provided each quarter by ALC and comply with its instructions. The Contractor’s role shall be to validate each component identified by S/N by ALC.
Validation shall take place on the same date as the audit.
9.4 Environmental Requirements
All parts must be thoroughly cleaned IAW applicable CMMs or FAA Advisory Circular 43-205, Guidance for Selecting Chemical Agents and Processes for Depainting and General Cleaning of Aircraft and Aviation Products, to ensure they are as free as practicable of all hazardous dust to include hexavalent chromium, cadmium, lead, etc., prior to being returned to ALC. ALC may take random samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in
Occupational Safety and Health Standards 1910.1025 (lead), 1910.1026 (Hexavalent Chromium) and
1910.1027 (Cadmium).
9.5 Shipping Instructions
Unless otherwise specified on individual task orders issued hereunder, deliverable items shall be shipped to the following address:
USCG ALC
Receiving Section, Bldg. 63
Elizabeth City, NC 27909-5001
Contract No. ______________________________
(To be assigned at time of issuance)
Task Order No. ______________________________
(To be assigned at time of issuance)
9.6 Aircraft on Ground (AOG) Situations
Upon notification from the USCG that an AOG situation exists, the Contractor shall expedite overhaul and initiate shipment within twenty-four (24) hours after notification. The shipping container shall be marked on the outside in highly visible lettering "A.O.G." At the time the Contractor is notified of an
AOG requirement, the Contractor shall advise the Contracting Officer, or their representative, if there are additional shipping charges. The Contracting Officer may issue an order modification authorizing additional funding as agreed upon by the Government and the Contractor to accomplish the expedited overhaul. The Contractor shall ship the component(s) directly to the destination the Contracting Officer designates as quickly as possible using the fastest traceable means (i.e., air freight, next day delivery).
9.7 Packaging and Preservation
9.7.1 Packaging and Marking
The Contractor shall comply with MIL-STD-129 (latest version), Military Marking for Shipment and
Storage, with the following exceptions:
a. Each component shall be individually packed in a separate approved shipping container.
b. Each individual container shall be labeled on the outside with Nomenclature, NSN, P/N, S/N, Quantity, Contract Number, task order number, and contract line item number on a permanent label.
c. The internal packaging material shall be sufficient to prevent damage during shipment, handling, and storage. Preservation and protection shall be provided to prevent corrosion, deterioration or decay during warehouse storage for a period of one year.
d. Packing List and Certification/Documentation shall be placed on the outside of individual containers.
e. Packaging material shall not consist of the following materials: popcorn, shredded paper, Styrofoam of any type, or peanut style packaging.
f. Each container shall be marked with a notice of warranty. The notice must include a brief statement that a warranty exists, the substance of the warranty, the duration of the warranty, and who to notify if the supplies are found to be defective.
g. Direct shipments of RFI condition assets to USCG Air Stations when an AOG situation arises may be necessary. An AOG condition occurs when there is no stock of a component on hand and the component is shipped directly from the Contractor to the air station.
h. When there is an AOG, the Contractor shall expedite the overhaul and return the required component(s) IAW the established AOG plan. The outside of the shipping container shall be marked “AOG” in highly visible lettering, at least 2” inches in height.
The Contracting Officer will notify the Contractor when noncompliance with any of the requirements set above is noted so that corrective action may be taken. The Contractor shall, within twenty-four (24) hours after such notification, give the Contracting Officer disposition instructions for such components. If the
Contractor elects for the USCG to correct the deficiency, the USCG may assess the actual costs for correcting the deficiency. The Contractor agrees that the total costs may be deducted from the invoiced amount prior to payment. An estimate of the actual cost for the USCG to correct noted deficiency(s) will be provided at the time the Contractor is notified of any noncompliance.
9.7.2 Packaging, Handling, and Preservation
ALC is a supply depot therefore material will be stored and transshipped to various users. The container shall be packed and labeled suitable for shipment via land, air or sea.
The Contractor shall ensure that all components, when packed in shipping containers or packaging, will be capable of being transported on standard transportation systems, commercial or military carriers. The
Contractor shall preserve, pack, and package in approved shipping containers to ensure complete delivery at destination without damage or deterioration of the supplies due to the hazards of shipping, handling, or storage. The Contractor agrees that any component damaged in shipment from the Contractor will be repaired inclusive of this order. The Contractor agrees to notify the Contracting Officer of the existence of any damaged and unusable shipping containers.
Packaging, handling, shipping, and transportation procedures shall be IAW ASTM D3951-10 (2010)
Standard Practice for Commercial Packaging; latest revision shall apply. If commercial practices cannot adequately protect and preserve the equipment, the Contractor shall package, handle, ship and transport components IAW MIL-STD-2073-1E Standard Practice for Military Packaging; latest revision shall apply.
9.8 Markings of Warranted Items
Pursuant to the requirements of FAR 46.706 (b) (5), the Contractor shall stamp or mark the supplies delivered, or otherwise furnish notice with the supplies, of the existence of the warranty. For commercial items, the Contractor’s trade practice in warranty marking is acceptable if sufficient information is presented for supply personnel and users to identify warranted supplies. Markings may be brief, but should include the information below:
A brief statement that a warranty exists
The substance of the warranty
The duration of the warranty
Who to notify if the supplies are found to be defective
9.9 Inspection and Acceptance
Final inspection and acceptance shall be performed at origin by the Defense Contract Management
Agency (DCMA). Full and clear traceability must be provided with delivery of each part. If full and clear traceability is not provided, ALC will not accept delivery of the part and invoicing may not be approved for payment. An OEM COC is required for all components delivered under this contract. The
OEM COC shall be signed by an authorized official of the approved source and shall specify the nomenclature, manufacturer’s part number, and date of manufacture. These forms shall be packaged with each component and copies shall be included with the invoice. If DCMA is not available, final inspection shall be performed at ALC by local USCG personnel. Inspection and acceptance shall be performed at destination by USCG quality assurance personnel for count, condition, and proper completed documentation. Inspection and acceptance deficiencies may delay or cause rejection of invoice payments.
The Government considers components RFI upon acceptance. Components determined to be NRFI upon installation may be returned to the Contractor with a Product Quality Deficiency Report for rework/evaluation/investigation as mutually agreed upon. The Contractor shall report all findings of the evaluation/investigation to the Contracting Officer within thirty (30) calendar days after receipt of the components identified as having a quality deficiency.
9.9.1 Contractors shall provide a Certificate of Conformance signed by the Contractor's authorized representative in accordance with FAR 52.246-15.
10.0 Invoicing
10.1 Invoicing Instructions
Unless otherwise specified in the schedule or on individual task orders issued under this contract, the
Contractor’s invoice shall be submitted IAW FAR 52.212-4 to the designated billing office for payment as noted below. A properly completed Commercial Shipping Document shall be attached to the original invoice. The Contractor is HIGHLY encouraged to submit invoices electronically to ALC-
Fiscal@uscg.mil.
Chief, Fiscal Branch
USCG ALC
Fiscal Branch, Bldg. 63
1664 Weeksville Road
Elizabeth City, NC 27909
Contract no. (To be assigned at time of issuance
Task Order no. (To be assigned at time of issuance)
10.2 Payment Information
All payments will be made electronically IAW FAR 52.232-33. The Contractor may submit invoice five
(5) days after shipment of items. The invoice will not be approved until all items have been receipted.
Contractor Proposed Cyber/IT-Related Solutions
The offeror or contractor shall identify all cyber/IT-related hardware, software and/or services that are included as part of its solution to the government’s requirement to store or process Coast
Guard data or connect to Coast Guard networks or other assets. The offeror or contractor shall provide this information in an electronic delimited file format (for example, csv file, docx table, xlsx table, rtf table or HTML file) as follows in its government response to the solicitation.
mailto:ALC-Fiscal@uscg.mil mailto:ALC-Fiscal@uscg.mil
Contractor Proposed Cyber/IT Related Solutions for CG-6 Review
Product
Name or
Service
Manufacturer or Company
Version
(if any) Release
(if any) Quantity
(if any) Brief
Description
Cost (If not FFP.
Contractor is responsible for also ensuring inclusion in the cost proposal)
Recurring or Non-
Recurring?
If recurring, state frequency
Remainder of page intentionally left blank