Attachment 2 - Statement of Work.pdf
PDF 221 KB Posted
- Solicitation number
- 1240LU26Q0069
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for a well drilling and hand pump installation project at Kading Campground in the Helena Ranger District of the Helena-Lewis and Clark National Forest in Powell County, Montana.
The contractor must drill a new water supply well and install a complete hand pump assembly, including new well casing, concrete pad, drain, and all necessary pump components to serve the campground's water supply. The specified hand pump is a Monitor Manufacturing 1DFHFS model with standpipe and foot valve. Well drilling specifications require a minimum depth of 50 feet and a maximum depth of 100 feet or until 5 gallons per minute flow is achieved, whichever comes first. The steel casing must be grouted to a minimum of 27 feet below ground level. The contractor is responsible for all labor, materials, tools, and off-site disposal of waste and excess materials in compliance with federal, state, and local laws. Boring spoils and water displacement must be distributed on-site to blend into the existing landscape. The well must be disinfected with a chlorine solution at 100 ppm concentration, with the solution remaining undisturbed for 12 to 24 hours. The contractor must submit a well log report to the Ground Water Information Center within 60 days of well development and provide a copy to the Contracting Officer's Representative. The contract period runs from June 22, 2026 to September 30, 2026, with all work to be completed by the end date. The estimated price range is between $25,000 and $100,000. No official site visit will be conducted, but contractors are encouraged to visit the site and familiarize themselves with local weather conditions that may affect road access.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Well Drilling and Hand Pump Installation
1240LU26Q0069
Kading Campground Helena Ranger District
Helena-Lewis and Clark National Forest
STATEMENT OF WORK
PROJECT SCOPE
SCOPE OF CONTRACT
A. Base Items:
a. This project is for the development of well and hand pump to serve the Kading
Campground in the Helena Ranger District of the Helena-Lewis and Clark National Forest.
b. Work includes drilling a well and installing a complete hand pump assembly on new well casing, concrete pad, drain, and all pump components necessary for a typical campground water supply.
c. Contractor is responsible for all labor, materials, tools, etc. necessary to complete the work. All waste and excess materials generated from construction shall be disposed of off Forest Service lands and in compliance with governing federal, state, and local laws.
1.1 PROJECT LOCATION
A. Helena Ranger District, Powell County, MT Kading Campground Approximate address:
Little Blackfoot River Road Elliston, MT 59728 Lat: 46.4281 Long: -112.4821 (See Attachment 3 - Kading Campground Well Drawings)
1.2 PERIOD OF PERFORMANCE:
A. June 22, 2026 - September 30, 2026.
B. All work shall be completed by September 30, 2026.
1.3 SITE VISIT:
A. No official Site Visit shall be performed. Per FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site.
Ensure you are familiar with inclement weather as this may hinder access to certain roads.
1.4 PRICE RANGE:
A. Between $25,000 and $100,000.
SPECIFICATIONS
2.1 SECTION 22 00 00 – KADING CAMPGROUND, NEW WELL
PART 1 – GENERAL
SUMMARY
A. Project Summary Description: The project includes but is not limited to the following major items of work as shown on the plans and specifications. The following descriptions are provided as an outline of major work items and shall not be construed as all-inclusive or a complete listing of all items of Work under this Contract.
a. Installation of a new water supply well, at the location as shown in the drawings, and as staked in the field by the Contracting Officer.
b. Installation of standard Forest Service hand pump.
PRODUCTS
A. HAND PUMP
a. Install the Forest Service standard Monitor Manufacturing 1DFHFS hand pump with standpipe and foot valve.
b. See drawings for details.
EXECUTION
A. BORING SPOILS AND WATER DISPLACEMENT
a. Boring spoils and water displacement to be distributed on site such that they blend into existing landscape.
DEPTH
a. Drill new well to a depth of up to 100 feet or 5 gallons per minute, whichever comes first.
i. Minimum depth of 50 feet.
b. Final well depth shall be approved by CO.
c. Grout Seal steel casing to a minimum of 27 feet below ground level.
3.1 DISINFECTING WELLS
A. After the well is cleaned it shall be disinfected with a chlorine solution of such volume and strength so that a concentration of at least 100 ppm of chlorine, after mixing with the water in the well, shall be circulated to all parts of the well. The water in the well must be agitated to mix the solution thoroughly. In addition, the surfaces of all components above the water level must be flushed or washed down with the sterilizing solution. The chlorine solution shall remain undisturbed in the well for a period of at least 12 hours, but not more than 24 hours.
3.2 WELL LOG REPORT
A. Contractor shall submit a well log report to the Ground Water Information Center (GWIC) within 60 days of well development. Provide copy of well log report to the
COR.
| STATEMENT OF WORK |
| 1.1 PROJECT LOCATION |
| 1.2 PERIOD OF PERFORMANCE: |
| 1.3 SITE VISIT: |
| 1.4 PRICE RANGE: |
| PRODUCTS |
| EXECUTION |
| DEPTH |
| 3.1 DISINFECTING WELLS |
| 3.2 WELL LOG REPORT |
File details come from the government source that posted it. Updated .