Attachment 2-Statement of Work.pdf

PDF 240 KB Posted

Attached to
Fire Rings and Table Bases Federal contract opportunity
Solicitation number
1284LM26Q0002
Issued by
Department of Agriculture Forest Service

About this file

This Statement of Work (SOW) from the US Department of Agriculture (USDA) details a project for the Bitterroot National Forest involving the procurement and delivery of fire rings and picnic table bases. The project requires the contractor to acquire and deliver 19 fire rings and 25 picnic table bases to Stevensville, MT; 25 picnic table bases to Darby, MT; and 33 fire rings to another location in Darby, MT. Delivery must be completed before May 1, 2026, with specific unloading requirements at each location, including advance notification and the use of available forklifts. The contractor is responsible for constructing the fire rings and table base frame kits according to provided specifications, with no government-furnished transportation, equipment, or materials.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Delivery location

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Period of performance

Project GAOA MT Bitterroot: Developed Rec Site Def Mtce & Accessibility Improvements Fire rings and table Bases

General Information

1.0 Scope of Work

This project consists of obtaining fire rings and picnic table bases that will replace infrastructure at various recreation sites across the Bitterroot National Forest. Work will include but is not limited to the acquisition of prefabricated fire rings, prefabricated picnic table base frame kits, transportation of fire rings and table bases to locations identified, and unloading of materials from transportation vehicle.

2.0 Delivery location

There will be three different delivery locations:

19 fire rings and 25 picnic table bases shall be delivered to:

88 Main St Stevensville, MT 59870

Tractor with forks available and FS staff will be responsible for the unloading of table bases if they are palatized and accessible from three sides or able to be moved by delivery driver to rear of the truck if contained. Delivery notification will be required days in advance to have someone available to operate the forklift.

25 picnic table bases shall be delivered to:

712 N Main Darby, MT 59829

Forklift is available and FS staff will be responsible for the unloading of table bases if they are palatized and accessible from three sides or able to be moved by delivery driver to rear of the truck if contained. Delivery notification will be required days in advance to have someone available to operate the forklift.

33 fire rings shall be delivered to 6735 West Fork Road Darby, MT 59829

Forklift is available and FS staff will be responsible for the unloading of table bases if they are palatized and accessible from three sides or able to be moved by delivery driver to rear of the truck if contained. Delivery notification will be required days in advance to have someone available to operate the forklift.

Contractor Requirements

3.0 Technical Requirements / Tasks

Fire rings and picnic table base frame kits shall be constructed based on specifications detailed in specification document. Fire rings and table bases shall be delivered to locations identified within specified time frame of contract.

Unloading of materials shall be preformed be delivery driver to locations identified by COR upon delivery. No equipment, nor loading dock is available for delivery.

4.0 Government Furnished

The Government shall Furnish no transportation, equipment, nor materials for this project.

5.0 Deliverables / Schedule

Timely submission of materials is essential to successfully completing this requirement. Schedules for deliverables are specified below. All deliverables shall be prepared and submitted according to format, content, and schedule described in the SOW.

Example 1

Key Deliverables Item No. Deliverable Objective Due 1 Materials and supplies in requisition Deliver ordered supplies to specified locations by date specified

No later than contract period performance date.

6.0 Period of performance

Delivery before 1 May 2026.

Project
General Information
1.0 Scope of Work
2.0 Delivery location
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Period of performance

File details come from the government source that posted it. Updated .