This Performance Work Statement (PWS) details the restoration of two replica aircraft static displays for the 8th Air Force Headquarters at Barksdale Air Force Base. The project requires comprehensive repair, refurbishment, and repainting of a B-52H Stratofortress and B-1B Lancer model, addressing water intrusion, corrosion, and structural damage. Specific restoration requirements include surface preparation, high-pressure washing, paint removal, priming, painting with Valspar 999 Series paint, applying clear coat, and reapplying original insignia and markings using HVLP equipment.
The contract is set aside for small businesses with a $19.0M size standard, under NAICS code 238320. Work is to be performed between 0730-1500 hours Monday-Friday, with an estimated 14-21 day performance period starting 15-30 days after contract award. Contractors must meet military base access requirements, including background checks and insurance. The solicitation (FA460825QS047) requests quotes by 12:00 PM CST on 1 August 2025, with the government planning a best value determination based on an integrated assessment of submitted quotes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
28 July 2025
PERFORMACE WORK STATEMENT
FOR
HQ 8TH AF STATIC DISPLAY AIRCRAFT
STATIC DISPLAY RESTORATION
1.0 Background for Requirement
The 2 replica models (B-52H Stratofortress and B-1B Lancer) static display in the HQ 8th AF needs repair, refurbish, new paint, and decals to mitigate water intrusion and resultant corrosion. The B-1B needs both wings replaced plus both aircraft have several small cracks and propose a threat of long-term damage to both the visual element of the display, in addition to the possible threat of long term irreversible internal structural damage. The replica models also show signs of wear due to outdoor elements, water marks, damage from bird and insect life, sun exposure, and rusting from peeling and chipping paint.
2.0 Scope of Work
The contractor shall provide all management, tools, supplies, equipment, parts, and labor necessary to accomplish the painting and repair of the static display and stands.
The contractor will also be responsible for ensuring environmental regulation compliance. If required, the contractor will be responsible for de-installing from stand, transporting to/from restoration location, and reinstalling aircraft on stand at HQ 8th AF.
3.0 Service Task Summary
The objective of service is to properly prep, repair, sand, prime, paint, and apply clear coat to the HQ 8th AF static display aircraft (B-52H Stratofortress and B-1B Lancer). Surface contamination will be removed using environmentally approved high-pressure wash cleaner and thorough rinsing. After sufficient drying time, existing paint will be scraped and sanded to feather edge, peeled or otherwise defective paint and to properly scuff surface in preparation for paint application. Primer (LICP 200 Industrial primer, equal to or better) will be applied to ensure solid paint application. The color coats will be the same Valspar 999 Series or better. You must obtain a wet mil thickness of 4.0-4.5 mils. One coat applied in two medium wet passes may be adequate to accomplish the above specification. If not, a second coat will be applied. Then 2 or more coats of Valspar AC4400 Clear coat HS or better will be applied to give high gloss and long-lasting UV protection. The aircraft is to be painted in its current paint scheme with its all-current insignia and markings. Insignia and markings (i.e stars and bars, tail number) will be repainted in the same size, color, and
FA460825QS047
Attachment 2 - Statement of Work location as they are currently. Stenciling will be reapplied in the proper location and size and painted on. Vinyl stickers must have a UV coating for long term outdoor use.
Aircraft will be sprayed using HVLP equipment. Rolling, brushing or airless spraying will not be accepted. All stenciling will be reapplied using proper paint in the location and size as well.
4.0 Personnel Services Provided by HQ 8 AF Facility Manager
4.1. Local Representative/Point of Contact (POC). Contractor will work with HQ 8th AF Facility Manger to coordinate time on site.
4.2 Facility Information.
4.2.1 Location of de-installing and reinstalling of models, North of 8th AF Headquarters.
Diagram below.
FA460825QS047
FA460825QS047
4.2.2 Hours of Operations. Start date of contract 15-30 days once Contract has been awarded. Pending weather due to exterior work, the estimated period of performance is 14-21 days (estimated). Hours of operation 0730-1500 Monday – Friday.
FA460825QS047
Holidays are as follows:
New Year's Day – Wednesday 1 January 2025
Martin Luther King Day – Monday 20 January 2025
Washington's Birthday (President's Day) – Monday 20 February 2025
AFGSC Family Day – Friday 23 May 2025
Memorial Day – Monday 26 May 2025
American Independence Day – Friday 4 July 2025
AFGSC Family Day – Monday 7 July 2025
AFGSC Family Day – Friday 29 August 2025
Labor Day – Monday 1 September 2025
AFGSC Family Day – Friday 10 October 2025
Columbus Day – Monday 13 October 2025
AFGSC Family Day – Monday 10 November 2025
Veterans Day - Tuesday 11 November 2025
Thanksgiving Day – Thursday 27 November 2025
AFGSC Family Day – Friday 28 November 2025
Christmas Day – Thursday 25 December 2025
AFGSC Family Day – Friday 26 December 2025
New Years Day – Thursday 1 January 2026
AFGSC Family Day – Friday 2 January 2026
4.3 Administrative Requirements:
4.3.1 Contractors will need to be able to work on military base, meet all background and insurance needs to drive on and off the pass as needed during period of work.
This work is on the exterior grounds of a secure facility.
FA460825QS047
File details come from the government source that posted it. Updated .