Attachment 2 - Statement of Work.pdf
PDF 679 KB Posted
- Attached to
- Electrical Upgrade – Innovation Lab Federal contract opportunity
- Solicitation number
- FA485524Q0015
About this file
This document is a Statement of Work (SOW) for an electrical upgrade to the Innovation Lab in Building 22, Room 5 at Cannon AFB. The SOW requires the installation of power capability to supply the equipment located in Room 5, including two Stratasys 900 Series printers, two Stratasys 450mc printers, one Despatch canister drying oven, one Oryx support cleaning apparatus, and at least 8 grounded (GFCI) duplex outlets. The power will be run from the GE 480V power panel in Room 33 through the walls to Room 5, where a transformer, 200A 120/208V 3-phase panel, and associated disconnects, fuses, and other equipment will be installed to provide the necessary power. The related federal contract opportunity is solicitation FA485524Q0015 for the "Electrical Upgrade – Innovation Lab" issued by the Department of the Air Force Special Operations Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Provisions and Clauses.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Combo - Power Upgrade.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Install power capability in Bldg 22 Room 5 to supply Innova�on Lab and all associated equipment.
Run power from GE 480v GE Spectra Series 480V Power Panel Board (Room 33), ~15’ up wall, through 9” cinder block wall, across 47’ bay (Room 36), through 2nd 9” cinder block wall, across 60’ bay (Room 2), through 3rd 9” cinder block wall to desired loca�on (Room 5).
Inside Room 5 install POWERSMITH ULTRA EFFICIENT TRANSFORMER 480V TO 120/208 on Transfer Rack ~10’-12’ above the floor and 200 AMP 120/208 3 PH PANEL WITH MAIN BREAKERS and all associated disconnects, fuses, breakers, switch boxes, outlets, drops, etc. to supply the following equipment located throughout Room 5 (1318 sq �) :
2 ea Stratasys 900 Series Printers: 230 VAC (+/-5%)/3Ph/34 amp 50/60 HZ (fused 40 amps) 2 ea Stratasys 450mc Printers : 208 VAC (+/-10%)/3Ph/18 amp 50/60 HZ (fused 25 amps) Despatch Canister Drying Oven: 208-240 VAC/1Ph/21 amp 50/60 HZ (fused 25 amps) Oryx Support Cleaning Apparatus:208 VAC/1Ph/20 amp 60 HZ with NEMA L6-20P (GFCI) connec�on Other Electric: 120V at least 8 grounded (GFCI) duplex outlets in work space