Attachment 2 - Statement of Work Awnings B344.pdf

PDF 117 KB Posted

Attached to
Building 344 Blazing Beans Awnings
Solicitation number
FA664825Q0022
Issued by

About this file

This Statement of Work (SOW) details the repair and replacement of awnings for Building 344 at Homestead Air Reserve Base (ARB) in Florida. The project requires fabricating and installing new awnings with dimensions of 60' x 21' for the rear, two 21' x 9' walkway awnings, and a 21' x 6' middle walkway awning. The contractor must prep existing structures, paint and galvanize them, perform minor hardware repairs, and ensure all work meets applicable codes and specifications.

Key project parameters include a start date of ASAP with a completion timeline of 60-90 days, work to be performed Monday-Friday between 0800-1600 hours. The contractor is responsible for providing labor, equipment, materials, obtaining permits, and ensuring quality workmanship. All personnel must pass a background check for base access. Payment terms specify 100% compensation upon project completion, with the contractor required to submit electronic fund transfer documentation to the NAF Contracting Officer. Homestead ARB will coordinate base access and ensure safe working conditions.

View the file

Other files

File Type Posted
ADDITIONAL PHOTOS.pdf PDF
ADDITIONAL PHOTOS.docx DOCX document
Attachment 3 - Blazing Beans Awning Frame Photos.pdf PDF
Attachment 1 - Solicitation - FA664825Q0022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Repair and Replacement of Awnings

29601 Elmendorf St. B344 Homestead ARB, FL 33039

24 June 2025

General:

The awnings on the front and rear of Building 344 (Blazin Beans Coffee Shop and Barber Shop) need replaced due to damage from a storm. The existing structures are still in place and the torn awnings have been removed. The existing structures will need to be painted and galvanized, along with minor hardware repairs due to rust. This SOW outlines the scope of work, deliverables, timeline, and responsibilities for the replacement of the awnings.

General Requirements:

1.1 The contractor shall provide all personnel, supervision, equipment, tools, materials, and supplies necessary to complete the project.

1.2 Conduct all work in accordance with the specifications, all applicable codes, and any construction drawings and details.

1.3 Dispose of all waste generated by this project according to all applicable regulations.

1.4 The Contractor is responsible to verify site conditions, measurements, paint colors, quantities, and materials needed to complete this project prior to submitting a proposal or starting any work.

1.5 The work area shall be kept clean, safe, and free of clutter. Provide continuous cleanup of affected areas. Provide protection for all adjacent real property assets throughout construction. The area must be left in a safe, organized, and clean state at the end of each workday if applicable.

1.6 All personnel will be required to pass a background check prior to gaining access to Homestead ARB.

Project Scope:

2.1 Fabricate awnings with industry standard grade material and color approved by the installation. Awning sizes are 60’ x 21’ rear, (2) 21’ x 9’ walkways, and 21’ x 6’ middle walkway.

2.2 Prep existing structures for painting. Assess any damaged areas and repair as needed.

2.3 Install new awnings according to specifications. Report any issues or delays to the POC.

2.4 Installation POC will do final inspection of work performed.

2.5 Clean-up work area and dispose of any left-over materials.

2.6 Provide any warranty information for the installation.

Timeline:

3.1 Project Start Date: ASAP

3.2 Project Completion Date: 60-90 DARO (Negotiable)

3.3 Work Schedule: Coordinate with POC during business hours Monday - Friday 0800 – 1600, excluding any holidays or any pre-determined closures.

Responsibilities:

4.1 Homestead ARB

- Coordinate with the contractor for base access.

- Ensure safe working conditions.

4.2 Contractor

- Provide all labor, equipment, materials, and supervision required to complete the work.

- Obtain any necessary permits.

- Responsible for any damage caused by the contractor’s workmanship or equipment.

- Ensure the work is performed to meet the standards of laws regulating construction.

Payment Terms:

5.1 100% paid in full at the completion of the project.

5.2 Contractor will need to provide the necessary paperwork for Electronic Transfer of Funds to the NAF Contracting Officer.