Attachment 2 - Statement of Work-70Z03824QJ0000357.pdf

PDF 335 KB Posted

Attached to
REPAIR RADAR RADOME
Solicitation number
70Z03824QJ0000357
Issued by

About this file

This document is a Statement of Work (SOW) for the repair of Radar Radomes used on the USCG's MH-60T aircraft. The USCG will provide 4 radomes initially, with an option for up to 12 additional radomes, for a total of 16 units. The contractor shall perform testing, evaluation, and repair of the radomes to return them to serviceable condition per OEM specifications and industry standards. Repair services must be completed within 90 days of receipt, with testing and evaluation due within 15 days. The contractor must maintain OEM certifications and provide required documentation, including airworthiness certification, for each repaired unit. The government will provide certain technical data, property, and stickers. Repaired radomes shall be considered Ready for Issue upon acceptance by the USCG. The contract will be firm-fixed price, with the government reserving the right to determine if a component is beyond economical repair.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

STATEMENT OF WORK (SOW)

RADAR RADOME REPAIR

70Z03824QJ0000357

1.0 Contractor Requirements

1.1 The United States Coast Guard (USCG) will furnish the component(s) and quantities specified in the following table for repair:

Description Quantity Option Qty

National Stock Number

(NSN)

Part Number (P/N)

Radar Radome 4 12 1560-01-HR2-2167 70600-81853-101

1.2 The part(s) are utilized on the MH-60T aircraft. The Radar Radomes are located on the nose of the MH-60T aircraft. The intended use is to monitor weather on the MH-60T aircraft that safeguard against the rescue concerns such as wind, snow, ice, or rain. Upon receipt of the component(s), the Contractor shall perform a test and evaluation to determine the condition of the component. Any component where no faults are found or the component is determined to be Beyond Economical Repair (BER), the Contractor will be allowed one of the following firm-fixed prices only:

Service Total BER/Scrap Fee TBD at time of award Test and Eval/No Fault Found (NFF) Fee TBD at time of award

1.2.1 When a component is found to be BER, the Contractor shall prepare a failure data report in accordance with (IAW) Section 2.10. This report shall be included with the returned component. Parts that are found to be no fault found shall be marked Ready For Issue (RFI) and returned to the Aviation Logistics Center (ALC) as is. The Contracting Officer will provide disposition instructions IAW Section

2.8 via a modification for all parts found to be BER.

2.0 Repair

2.1 Non-RFI components shall be repaired and returned to RFI condition IAW the Original Equipment Manufacturer (OEM) functional performance specifications. Components shall be repaired for the specific fault noted on the DD Form 1577-2, Unserviceable (Repairable) Tag-Material, or CG- 1577-A (11-90), Unsatisfactory Report Tag, which will be attached to each non-RFI component. The Contractor shall perform an inspection and correct all deficiencies found. This shall include, but is not limited to, replacement of missing or broken parts and the removal of any foreign matter or corrosion.

2.2 During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part. Corrosion removal and treatment of affected areas will be accomplished IAW OEM specifications and Federal Aviation Administration (FAA) Advisory Circular AC 43-4A, dated 07/24/1991, Corrosion Control for Aircraft.

2.3 Work under this purchase order shall be performed at the Contractor’s facility or USCG approved facility. The Contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and repair the components listed in this purchase order at the firm-fixed prices listed in the schedule (or modification).

STATEMENT OF WORK (SOW)

RADAR RADOME REPAIR

70Z03824QJ0000357

2.4 Repair services must be performed IAW the procedures established in this SOW. The documents are listed in order of precedence. Latest revisions of any instruction or manual shall apply. The information contained within is not intended to be all inclusive nor to detract from or modify procedures outlined in the manuals. If the applicable technical manual does not cover a procedure, the Contractor shall utilize the OEM repair manual. If the OEM manual does not cover a procedure, the Contractor shall utilize the best commercial business practice. Where an application of “best commercial practice” is in conflict with these manuals, the Contracting Officer may approve deviation from requirements. When applicable, each manual will specify if the Export Control Act applies. The following document(s) are required to complete the services required by this acquisition. The USCG does not own nor can it provide the technical documents specified herein.

• All OEM shop, inspection, overhaul, repair, or other OEM Component Maintenance Manuals

(CMM)

• All OEM service bulletins, amendments, modifications, and specifications as applicable

• Repair shall be accomplished in accordance with NAVAIR 01-1A-22 and Air Force

T.O. 1-1-24 to ensure full compliance with performance standards. For the repair to the radar window area of the Radomes assembly; the repair Radomes shall be tested and certified to a Class B rating for transmission efficiency as outlined in the Radio Technical Commission for Aeronautics (RTCA).

2.5 The Contractor shall have access to required repair specifications and test/acceptance criteria and data to ensure all components are tested and repaired IAW the current specifications and procedures. The USCG may review repair manuals and performance/test/ acceptance criteria as required. The Contractor is solely responsible for obtaining all specifications required for this effort. Original design or functional capabilities of the end component and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.

2.6 Parts of a component found to be in a serviceable condition as a result of functional testing shall be reused. Missing parts and parts found to be defective or that require replacement by manufacturer’s instructions shall be replaced with parts meeting the manufacturer’s specifications and drawings or as otherwise authorized in writing by the Contracting Officer. Replacement parts shall be new and accompanied with OEM traceability. The cost for parts that are replaced systematically during repair shall be included in the price listed in the schedule for these operations.

2.7 Prices do not include components that have been cannibalized or severely damaged due to mishandling. Additionally, USCG aircraft is used primarily around salt water at low altitude for search and rescue missions. Therefore, corrosion is to be anticipated and is considered "normal" for the aircraft.

Corrosion does not constitute unusual damage.

2.7.1 Components received which indicate obvious misuse, cannibalization, or severe damage due to mishandling or crash damage may dictate an exclusion from the prices specified in the contract schedule.

Such components shall be inspected, repair costs determined, and authorization to proceed obtained from the Contracting Officer prior to commencement of work. Once notified of a possible exclusion, The Contracting Officer will make a written determination within thirty (30) days as to exclusion validity.

STATEMENT OF WORK (SOW)

RADAR RADOME REPAIR

70Z03824QJ0000357

The Contracting Office may approve the quote, decline the quote and have the component returned as-is, or consider the component BER.

2.8 The USCG typically considers a component BER when the cost to repair exceeds sixty-five (65) percent of the price of a new unit; however, the USCG is not bound by that number and will make all final BER determinations. The USCG will provide disposition instructions (either to scrap the component at the Contractor’s facility or to return the component to ALC) for all components that are considered BER. The Contractor shall not dispose of a component until they have been notified by a written modification to the order. When returning the component to ALC, the components shall be clearly marked as “BER” with the supporting evidence.

2.9 The Government shall not be liable for any amount expended by the Contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the Contracting Officer.

2.10 The Contractor shall submit a failure data report for each repaired component. This report shall include NSN, P/N, Serial Number (S/N), nomenclature, date of repair, contract delivery order number, line-item number, description of repaired failure, the USCG’s reported failure, a listing of parts repaired, and a listing of parts replaced. The Contractor’s in-house work order may be used to satisfy this requirement if it includes the information requested above. This report shall be attached to the packing slip and shipped with the repaired component.

2.11 The Contractor may be required to be certified and maintain a quality system that complies with the requirements of ISO 9001-2000 Quality Management Systems – Requirements or equivalent. The Contractor is responsible for performing or assuring all inspections and tests necessary to substantiate that the goods or services furnished conform to Government’s requirements. The Contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements. Records of conformance shall be maintained on file at the Contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at Contractor’s facility to verify the existence, adequacy, and effectiveness of the quality system.

2.12 ALC considers components RFI upon acceptance. Components determined to be non-RFI upon installation may be returned to the Contractor with deficiencies described in a Product Quality Deficiency Report.

2.13 All parts must be thoroughly cleaned IAW applicable CMMs or FAA Advisory Circular 43-205, Guidance for Selecting Chemical Agents and Processes for Depainting and General Cleaning of Aircraft and Aviation Products, to ensure they are as free as practicable of all hazardous dust to include hexavalent chromium, cadmium, lead, etc., prior to being returned to ALC. ALC may take random samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025 (lead), 1910.1026 (Hexavalent Chromium) and 1910.1027 (Cadmium).

2.14 Quarterly audits are conducted by ALC on Government Furnished Property at commercial Contractor facilities. The Contractor shall follow the instructions provided each quarter by ALC and comply with its instructions. The Contractor’s role shall be to validate each component identified by S/N by ALC. Validation shall take place on the same date as the audit.

STATEMENT OF WORK (SOW)

RADAR RADOME REPAIR

70Z03824QJ0000357

2.15 The Government will provide the following property to the Contractor for work required under this contract:

The Government will provide the following stickers to apply to the Radar Radomes when repair is completed. Stickers should be applied as shown in the photos included as Attachment 7.

• ”Warning Radio-Frequency Radiation Hazard” (Danger within 25 feet of antenna when in Radiate condition) 1 each per Radar Radome

• “Drain Hole – Do not plug” 1 each per Radar Radome

• “Do not paint” 2 each per Radar Radome

3.0 Certifications

3.1 When checked the Contractor shall:

Maintain OEM certification for the repair of the components listed in this statement of work.

The Contractor shall provide immediate notification to the Contracting Officer upon loss of any required certifications. The Contractor shall also:

• Comply with the certification/documentation requirements specified herein.

• Attach certifications/documentation to the outside of the shipping container.

All parts repaired under the provisions of this contract must be airworthy and suitable for installation on USCG aircraft. Each returned component shall be tagged with a DD Form 1574 Serviceable Condition Code Tag or a FAA Form 8130-3, Airworthiness Approval Tag, completed in its entirety. The Contractor shall furnish a Certificate of Airworthiness in accordance with FAA procedures (or USCG approved alternate procedure) and a Certificate of Conformance (COC) IAW FAR 52.246-15 for each components. These forms shall be packaged with each component.

The COC shall be signed by an authorized official of the approved source and must specify the nomenclature and manufacturer's part number. For Production Approval Holder, a COC and a copy of the FAA Parts Manufacturer Approval (PMA) or other manufacturing authority shall be provided. Contractors shall also provide documentation reflecting the complete unbroken history of ownership of the parts from purchase from the approved manufacturing source until delivery to the USCG.

4.0 Tracked Components Items

4.1 Serial number tracking shall be used for validating the correct component(s) were received at the Contractor’s repair facility and returned to the USCG. Upon receipt of the component(s) from the USCG, the Contractor shall verify each component received to ensure that the S/Ns match the ones specified in the order. Should a discrepancy be identified, the Contractor shall notify the Contracting Officer in writing of the discrepancy.

4.2 When checked the Contractor shall comply with the following documentation requirements:

STATEMENT OF WORK (SOW)

RADAR RADOME REPAIR

70Z03824QJ0000357

The components to be repaired under this Purchase Order are tracked in the USCG’s Asset Computerized Maintenance System (ACMS). ACMS is the management information system used to schedule and record all USCG equipment maintenance actions and calibration intervals.

Tracked components will be shipped to the Contractor with a Significant Component History Record (SCHR). The SCHR records the maintenance history of the serial number tracked components. It remains with its corresponding part until reinstalled on an aircraft or is annotated “BER” and scrapped.

(NOTE: Written approval from the Contracting Officer is required prior to scrapping a serial number tracked component). The SCHR for scrapped components shall be returned with the component. The Contractor shall retain a copy of the SCHR for ninety (90) calendar days.

The Contractor shall provide a Component Repair Record (CRR) with the repaired component(s).

The CRR records the maintenance performed on a serial number tracked component and enrolls or disenrolls components from ACMS when those components are scrapped, added to, or removed from the USCG inventory. At a minimum, the CRR shall identify the equipment and contain a description of the maintenance action performed, parts replaced, service bulletins and modifications. The Contractor shall mail one (1) copy of the CRR to USCG ALC, ATTN: AVENG/ACMS, Elizabeth City, NC 27909-5001 no later than five (5) business days following completion of the rework effort. The original CRR shall be packed with the component. The Contractor shall retain a copy of each CRR for ninety (90) calendar days. The Contractor may request that their in-house work order be accepted to fulfill the CRR requirement. The Contracting Officer will provide a written determination in response to the request.

5.0 Delivery Requirements

5.1 The following table shows the requested delivery for each priced line item listed in the schedule.

Early deliveries, when appropriate, are desired and acceptable.

Item Description Due No Later Than:

Test and Evaluation Fifteen (15) calendar days after receipt of components.

Repair Ninety (90) days after receipt of components.

5.2 Inspection and acceptance shall be performed at destination by USCG personnel for count, condition, and proper completed documentation. Inspection and acceptance deficiencies may delay or cause rejection of invoice payments. Equipment found to have operational deficiencies may be reported on standard form "SF 368", Product Quality Deficiency Report, to the Contractor for investigation. The Contractor shall report findings of the investigation to the Contracting Officer, within thirty (30) calendar days after receipt of quality deficient exhibit.

5.2 Inspection and acceptance shall be performed at destination by USCG personnel for count, condition, and proper completed documentation. Inspection and acceptance deficiencies may delay or cause rejection of invoice payments. Equipment found to h...