This document is a Statement of Work (SOW) for repairing and overhauling flotation systems and cylinders for the United States Coast Guard's (USCG) fleet of MH-65 helicopters. The USCG intends to award an Indefinite Delivery Requirements contract to Safran Aerosystems Services Americas, LLC, the Original Equipment Manufacturer (OEM) and only authorized Maintenance, Repair, and Overhaul (MRO) provider for these components. The contract consists of a one-year base period and four one-year option periods. The SOW details the contractor requirements, repair and overhaul procedures, documentation requirements, quality assurance provisions, and other administrative terms. The contractor must be an FAA-approved repair facility and OEM-authorized for the specified components. The contract has a 60-calendar day turnaround time after receipt of the components, with provisions for accelerated delivery in urgent situations. The contractor will be compensated using firm-fixed prices, with separately priced replacement parts as needed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
70Z03824QB0000083
1.0 BACKGROUND
The United States Coast Guard (USCG) currently operates a large fleet of 97 MH-65 helicopters. The MH-65 helicopter is primarily a Short-Range Recovery (SRR) aircraft used by the USCG to perform search and rescue, law enforcement and homeland security missions. The USCG missions require frequent operation at lower altitudes and in salt-laden environments. These environments accelerate corrosion on airframe structures, engines, and components of the aircraft.
2.0 SCOPE
This requirement is for the test, evaluation, and repair/overhaul of Float Assemblies, Float Containers, Float Bags, and Cylinders. Work shall be performed using the Original Equipment Manufacturer (OEM) Component Maintenance Manuals (CMM). The OEM is Safran Aerosystems (Cage Code F6101). Upon receipt of the components, the Contractor shall perform a test and evaluation to determine the condition of the items. Any items found as No Fault Found (NFF), Beyond Economical Repair (BER) or Scrap must be return to the USCG In Accordance With (IAW) section 7.4. All other items repaired/overhauled shall be IAW this Statement of Work (SOW), and OEM CMM. All components are Flight Critical Aircraft Parts (FCAP) and Serial Number (S/N) tracked.
Work shall be performed at the Contractor’s facility. The Contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to test, repair/overhaul the components listed in this contract.
3.0 APPLICABLE DOCUMENTS
3.1 Technical Specifications
OEM CMMs and other applicable technical specifications applicable to the repair/overhaul of the components set forth in the Schedule.
3.2 OEM Documents
Industry documents are not available from the USCG and must be obtained from the OEM.
3.3 Order of Precedence
In the event of conflicts between OEM specifications and procedures and USCG specifications and procedures, the order of precedence is as follows:
3.3.1 USCG Specifications
USCG specifications and procedures to include USCG approved design changes or engineering changes. The USCG, if applicable will provide these.
3.3.2 OEM Specifications
OEM specifications and procedures.
4.0 CONTRACTOR REQUIREMENTS
4.1 FAA Approved Repair/Overhaul Facility and OEM Approved
Contractor shall be either a (1) FAA Approved Repair Facility or (2) equivalent European Aviation Safety Agency (EASA) in addition to being (3) an OEM authorized Repair/Overhaul facility for the components listed in the Schedule of Supplies/Services. Components repaired/overhauled and delivered to the Government shall be certified airworthy and ready for installation on a USCG aircraft. Contractor must provide proof of an established supply chain with the OEM for those parts required to be purchased through the OEM AND proof of enrollment in OEM technical publication subscription and compliance with tech publication audit requirements, if any, as set forth by the OEM with their proposal.
4.1.1 Certifications
The Contractor shall maintain all certifications throughout the duration of the contract. The Contractor shall notify the Contracting Officer in writing, no later than ten (10) calendar days, when the Contractor has a change in their certification status and shall disclose all facts relevant to the change.
4.2 Subcontractor Qualifications
Subcontracting shall be limited to Contractors certified by the FAA or EASA equivalent and OEM.
Documentation shall be provided to the Government upon request to support the subcontractor’s qualifications and there can be no change in sub-contractors without the Contracting Officer’s written approval. Contractors and sub-contractors shall have access to OEM authorized replacement parts. If subcontractors are used, the Contractor must be able to provide current proof of compliance with OEM CMM specifications for the work being accomplished by the subcontractor.
4.3. Labor Rate
The labor rate provided in the Schedule of Supplies/Services, for the base period and each option period, shall be the rate used to incorporate unusual damage, technical support, service bulletins, and/or an engineering change. It shall be fully burdened with all overhead, general and administrative (G&A) expenses, and profit.
5.0 REPAIR
5.1 Repair Procedures
5.1.1 Repair
Non-RFI components shall be repaired and returned to RFI condition IAW the OEM minimum functional performance specifications. Components shall be repaired for the specific fault for which they were returned.
A DD Form 1577-2, Unserviceable (Repairable) Tag-material, or USCG, CF-1577-A (11-90), Unsatisfactory Report Tag will be attached to each non-Ready for Issue (RFI) item describing faults. The Contractor shall perform an inspection and correct deficiencies found. However, if no tag is present specifying why an item is send for repairs, the Contractor shall follow approved CMM or current USCG approved repair and procedures.
This shall include, but is not limited to, replacement of broken or missing parts and the removal of any foreign matter or corrosion.
The Repair Firm Fixed Price shall include replacement of all systematically changed parts as required in accordance with the CMM. In addition, to the following piece parts/part numbers:
For Cylinder, P/N 204623-2 Cable, P/N 205096-0, 1ea.
Lead Seals, P/N 154090, 5ea.
Adhesive Label, P/N 213936-0, 1ea.
Label, P/N 218379-0, 1ea.
Safety Streamer, P/N 201245-0, 1ea.
Safety Pin, P/N 201159-0, 1ea.
Protective Sleeve, P/N 78383, 1ea.
Retaining Ring, P/N 01103, (or) NFL23203AM0190T, 1ea.
Ring, P/N 961076-0, 1ea.
Split Ring, P/N 50920, 1ea.
Bille, D3 MI-G40, 3ea Warranty Seal, P/N 979017, 8ea.
For Cylinder, P/N 158991-3 Safety Streamer, P/N 212775-1, 1ea Adhesive Label, P/N 213935-0, 1ea.
Label, P/N 218436-0, 2ea.
Label ID, P/N 218437-0 1ea.
Burst Safety Disc, P/N 962009, 1ea.
Sticker, P/N 216296-0, 1ea.
Protective Sleeve, P/N 78383, 1ea.
Retaining Ring, P/N 01103, (or) NFL23203AM0190T, 1ea.
Warranty Seal, P/N 979017, 8ea.
For Floatation Assy, F/LH/RH, P/N 223044-0 or -1 and/or 223045-0 or -1 O ’Ring, P/N 01040, 2ea.
Hollow Rivets, P/N 956071, 22ea.
Pressures, D4 5F, P/N 973005, 2ea.
Pressures, D4, 5M, P/N 973006, 2ea.
Spring Straps, P/N 200048-0, 2ea Rivets, P/N 956064, 4ea.
Plastic Rivets, P/N 1002919, 14ea.
5.1.2 The Contractor shall ensure that all repair Float Bags shall have at least two (2) year of shelf-life limit remaining from the Date of Manufacture (DOM) upon return to RFI condition and/or upon installation to the floatation assembly.
5.1.3 New Float Bags shall have at least seven (7) years of shelf-life limit remaining from the Date of Manufacture (DOM) upon installation to the flotation assembly.
5.1.4 Float Bags requiring repair shall be repaired and returned IAW the CMM (25-69-42) and SOW.
5.1.5 Containers shall be repair, and tested according to USCG and Safran Services Americas, LLC approved repair procedures in accordance with (IAW) Safran (aka Zodiac) Form 134 PS-28 Composite Repair, dated 9/14/12 and Form 134 PS-29 Fiberglass Repair, dated 10/10/12 or any other USCG and/or OEM approved repair procedures.
5.1.6 All repaired Flotation Assembly units must be returned with orange covers. Any repaired items returned without orange covers will not be accepted by ALC receiving and sent back for the correct orange covers. Note:
The patching of the orange cover is not authorized for repair along the outer edges of the cover.
5.1.7 A “Leak Test” will be performed IAW the appropriate CMM for all Cylinders listed in the Supplies/Services Schedule. The Contractor shall write the date the leak test started and the date the leak test was finished for each item on its applicable Components Repair Report (CRR). If the charge on a Cylinder that has been returned back to ALC as an RFI unit is found to be below the acceptable limits (Per CMM) prior to reaching six (6) months while on the shelf/stock, the Cylinder will be returned to the Contractor on a Product Quality Deficiencies Report (PQDR) task order for repair at no cost to USCG.
5.1.8 The operational life limit on the Float Bottle Cylinder (P/N 158991-3) is fifteen (15) years. When Float Cylinders are received at the Contractor facility with eighteen (18) months, or less, on its shelf lifetime limit, the Cylinder shall be replaced.
6.0 Overhaul
6.1 Overhaul Procedures
6.1.1 Overhaul
Non-RFI cylinders shall be overhauled, (Which includes complete disassembly, refurbishment, recharging, reassembly, and hydrostatic testing (HST)) and returned to RFI condition. Overhauls shall also include all necessary repairs to return the cylinders to a RFI condition. The Cylinders, P/N 158991-3 shall be overhauled once the component has reach 100% of its time between overhaul (TBO). At time of overhaul, the serviceability clock of the component is set to zero. Cylinder, P/N 204623-2, shall receive HST every five (5) years.
Components at less than 60% shall be repair unless otherwise authorized in writing by the USCG.
The Overhaul Firm Fixed Price shall include replacement of all systematically changed parts as required in accordance with the CMM. In addition, to the following piece parts/part numbers:
For Cylinder, P/N 204623-2 Cable, P/N 205096-0, 1ea.
Lead Seals, P/N 154090, 5ea.
Adhesive Label, P/N 213936-0, 1ea.
Label, P/N 218379-0, 1ea.
Safety Streamer, P/N 201245-0, 1ea.
Safety Pin, P/N 201159-0, 1ea.
Protective Sleeve, P/N 78383, 1ea.
Retaining Ring, P/N 01103, 1ea.
Ring, P/N 961076-0, 1ea.
Split Ring, P/N 50920, 1ea.
Bille, D3 MI-G40, 1ea
For Cylinder, P/N 158991-3 Safety Streamer, P/N 212775-1, 1ea Adhesive Label, P/N 213935-0, 1ea.
Label ID, P/N 218437-0, 1ea.
Burst Safety Disc, P/N 962009, 1ea.
Sticker, P/N 216296-0, 1ea.
7.0 Additional Contractor Requirements
7.1 Failure Data Report
The Contractor shall submit a failure data report for each repaired/overhauled component. This report shall include National Stock Number (NSN), Part Number (P/N), Serial Number (S/N), nomenclature, date of repair/overhaul, contract number, task order number, line-item number, description of the repair failure, the USCG’s reported failure, a listing of parts repaired, and a listing of parts replaced. The Contractor’s in-house work order may be use to satisfy this requirement if it includes the information requested above. This report shall be attached to the packing slip and shipped with the repaired component.
7.2 Corrosion
USCG aircraft operate primarily around salt water, at low altitude, and are subject to corrosion. During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. If corrosion is discovered, disassembly shall be performed to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part.
Corrosion removal and treatment of affected areas shall be accomplished IAW the CMM.
In the case where specifications do not exist or are not clear, the Contractor shall provide written notification to the Contracting Officer. Disposition instructions via a modification to the Task Order will be completed and provided by the issuing office.
7.3 Environmental
All parts must be thoroughly cleaned IAW applicable CMMs and OEM specifications to ensure they are as free as practicable of all hazardous dust to include hexavalent chromium, cadmium, lead, etc., prior to being returned to ALC. ALC may take random samples of parts to ensure they are free as practicable of all hazards.
Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025 (lead),
1910.1026 (Hexavalent Chromium) and 1910.1027 (Cadmium).
7.4 Test and Evaluation/No Fault Found/Beyond Economical Repair (BER)
7.4.1 Test and Evaluation/No Fault Found
If, after visual and functional inspections, an item is discovered to meet manufacturer’s minimum performance specifications as designated by the CMM and requires no parts or labor, the Contractor shall be allowed the firm-fixed price for Test and Evaluation/No Fault Found Fee in the Schedule.
The Contractor shall notify the Contracting Officer in writing of the applicable material condition and identify the task order and line-item number(s). The task order and applicable line-item number(s) will be reduced from the firm fixed price to the Test and Evaluation Inspection Fee by issuance of a modification to the task order.
The Contractor shall prepare and include a Failure Data Report as described in paragraph 7.1, with all returned components, including the USCG’s reported failure and the fact that no fault was discover.
7.4.2 Beyond Economical Repair (BER) Items
When an item is determined to be BER, the Contractor shall provide written notification to the Contracting Officer. The notification shall list the Task Order Number, Line Item, NSN, PN and S/N with a brief description supporting the determination. The Contracting Officer will provide disposition instructions via a Task Order Modification. If the part is, deemed BER, the Contractor shall be allowed the firm-fixed price for Test and Evaluation Inspection Fee.
The Contractor shall notify the Contracting Officer in writing of the applicable material condition and identify the applicable task order and line-item number(s). The task order and applicable line-item number(s) will be reduced from the firm fixed price to the Test and Evaluation Inspection Fee by issuance of a modification to the task order.
The Contractor shall prepare and include a Failure Data Report as described in paragraph 7.1. When the determination that the assembly shall be BER, the part and the accompanying paperwork must be clearly marked BER and returned to the USCG ALC for proper disposition.
Note: The USCG typically considers an item BER when the cost to repair exceeds 65 percent of the price of a new unit; however, the USCG is not bound with this percentage and will make all final BER determination.
7.4.3 Scrap Items
When an item is determined to be scrap, the Contractor shall provide written notification to the Contracting Officer. The notification shall list the Task Order Number, CLIN, NSN, PN and S/N with a brief description supporting the determination. The Contracting Officer will provide disposition instructions via a Task Order Modification. If the part is, deemed scrap, the Contractor shall be allowed the firm-fixed for Test and Evaluation Inspection Fee.
The Contractor shall notify the Contracting Officer in writing of the applicable material condition and identify the applicable task order and line-item number(s). The task order and applicable line-item number(s) will be reduced from the firm fixed price to the Test and Evaluation Inspection Fee by issuance of a task order modification.
The Contractor shall prepare and include a Failure Data Report as described in paragraph 7.1. When the determination that the assembly shall be scrap, the part and the accompanying paperwork must be clearly marked scrap and returned to the USCG ALC for proper disposal.
Note: Cylinder bottles and Float Bags that has reached their service life limit can be scrapped at the contractor’s facility and the contractor shall provide a scrapped certificate.
7.5 Separately Priced Replacement Parts (SPRP)
The repair and overhaul prices specified in the Schedule of Supplies/Services include the replacement of systematic parts as well as those piece parts/part numbers listed in Sections 5.1.1 & 6.1.1 except for the separately priced replacement parts listed in the Schedule of Supplies/Services under CLIN 0012 (and subsequent option periods CLINs). If any of the piece parts listed under CLIN 0012 (and subsequent option periods CLINs) require replacement, contractor shall contact the Contracting Officer before proceeding with the repair/overhaul process.
The Contractor shall provide written notification to the Contracting Officer within thirty-(30) calendar days after receipt of the component when any of the separately priced replacement parts specified in the solicitation schedule are required. All replacement parts shall be new. This notification shall include a list by part number, nomenclature and quantity of all the separately priced replacement parts required. The Contracting Officer will either provide a modification to the task order authorizing use of the separately priced replacement parts or provide disposition instructions.
The Government reserves the right to provide separately priced replacement parts as Government Furnished Material (GFM) on an as-needed basis as determined by the Contracting Officer.
7.5.1 Parts Manufacturer Approval (PMA)
PMA parts are not acceptable for this requirement.
7.6 Pricing Exclusions – Unusual Damage
7.6.1 General
The USCG intends that all components specified in the schedule of supplies/services will be shipped for the repair/overhaul within the firm-fixed prices established in the Schedule of Supplies/Services. Those components may be determined unusually damaged. To be determined unusually damaged, a component must be received for routine repair and upon evaluation any one of the following conditions are discover:
Obvious misuse Crash damage Acts of God
Only components meeting one or more of the above criteria may be consider as Unusually Damaged. Missing piece parts does not include the parts that are to be systematically change out per the CMM; the USCG shall not be charged for these parts. All other components shall be repaired/overhauled IAW the firm fixed repair/overhauled prices established in the Schedule of Supplies/Services.
7.6.2 Unusual Damage Evaluation
When a component is process for Unusual Damage Evaluation, the Contractor shall immediately notify the Contracting Officer in writing. The Government may request the Contractor to submit an inspection condition report, pictures of the damage, and a repair quote listing all parts and labor cost needed to return the component to satisfactory condition that meets OEM CMM specifications. The quote shall include the Task Order Number, Line Item, NSN, P/N, and S/N of the component. The Contractor’s delivery obligation shall stop from the date of notification that an item has been determined to be a candidate for “Unusual Damage Evaluation.” The delivery obligation will be specified in the Task Order modification and will apply only to those items specifically addressed by the modification. The Contractor is obligated to deliver all other components not individually addressed by the modification under the original delivery date specified on the Task Order. The quote shall not include the work involved in the teardown and inspection, which will have already occurred, as this is cover by the firm-fixed price. The Contracting Officer will either initiate negotiations for a firm-fixed price with the Contractor or deny authorization for the repair based on the information in the report and any other information, which may be available. Upon mutual agreement as to price and delivery a Task Order modification will be issued authorizing the repair or overhaul at the agreed upon terms. If repair/overhaul is not desired, the Contracting Officer will provide the Contractor with disposition instructions for the Non-RFI item.
In the event an item is returned to the USCG in a Non-RFI condition, the Contractor shall be entitled only to appropriate compensation at the Test and Evaluation Fee specified in the Schedule of Services.
7.7 Technical Support Services
7.7.1 The Contractor shall maintain a permanent presence in the United States, staffed with qualified, English speaking technical support personnel. The Contractor shall provide answers to basic questions from Government engineers at no additional cost to the Government. Upon receipt of a request for a quote for a specific task, the Contractor shall prepare and submit a quote to the Contracting Officer. This quote shall include a breakdown of hours, materials and other costs associated with performance of the task. Specific deliverables will be identified on individual task orders.
7.8 Service Bulletins
The Contractor shall notify the Contracting Officer in writing when incorporation of a service bulletin is required no later than thirty (30) calendar days following receipt of the service bulletin notification. The quote shall contain a list of materials with associated prices, the number of labor hours required, turn-around time needed to effect the Service Bulletin, and any impact on the contract delivery schedule. The incremental charge agreed to for incorporation of a service bulletin shall apply only to those components into which the Contractor incorporates a required service bulletin, not those into which the service bulletin has been previously incorporated. Upon agreement of the price for incorporation of the change, authority and price changes shall be incorporated into the contract via a contract modification. The Contractor shall not incorporate a service bulletin prior to receipt of written authorization from the Contracting Officer.
7.9 Product Improvements/Engineering Changes
The Contractor may develop designs and/or processes that shall improve the reliability, maintainability, or operational performance of the components being repaired and/or overhauled. These shall be provided to the USCG Contracting Officer for consideration and approval via the Engineering Change Proposal Form (DD
Form 1692). A proposal shall also be provided that reflects an incremental charge to be assessed each time the Product Improvement Package (PIP)/Engineering Change Proposal (ECP) is incorporated into the component.
The proposal shall include a breakdown of labor hours, material, and other costs. Upon agreement of the price for incorporation of the change, authority and price changes shall be incorporated into the contract via a contract modification or task order modification. The Contractor shall not incorporate proposed product improvements or engineering changes prior to receipt of written authorization from the Contracting Officer. contract period of performance.
7.10 Serviceable Parts
Parts of a component found to be in a serviceable condition because of functional testing shall be reused.
Missing parts or parts found to be defective shall be replaced with new parts that meet or exceed CMM specifications and drawings, except as noted in the SOW. Replacement parts shall be new. The cost for parts that are replaced systematically during the repair/overhaul shall be included in the fixed repair/overhaul price listed in the schedule as contract line-item numbers CLINs 0001-0011 (and subsequent option period CLINs).
8.0 QUALITY ASSURANCE PROVISIONS
8.1 Responsibility for Inspections and Tests
The Contractor shall operate with an established inspection system IAW FAA procedures for all components.
Records of conformance shall be available or provided for review by the Government upon request. The Government reserves the right to conduct site visits at the Contractor’s facility to verify the existence, adequacy and effectiveness of the quality system. Upon request of the Government, the Contractor(s) shall forward a copy of their current certification and Quality Assurance Manual for review.
8.2 Traceability of Parts
The items are flight critical; therefore, replacement parts used during repair/overhaul shall be in new condition.
All replacement part(s) used in the repair/overhaul shall be: (1) approved by the OEM, or (2) approved by a FAA certified source of supply for the specific part. Only parts that have traceability to the manufacturer of those specific parts(s) shall be use. Installation of new surplus, including military new surplus replacement parts is not permitted. Parts replaced during repair/overhaul shall be disposed of as scrap, which means to render those items unusable for their intended purpose.
8.3 Product Quality Deficiencies Report (PQDR)
Repaired/Overhauled components found to have deficiencies (within the standard industry warranty period; one
(1) year from the received date) shall be returned to the Contractor for investigation under a no-cost Warranty Repair/Overhaul Task Order and will include a Product Quality Deficiencies Report (PQDR). The Contractor shall report findings of the investigation within fifteen (15) calendar days after receipt after receipt of the component. If agreed upon between parties that the component’s deficiencies are not related to previous repairs completed by the Contractor, the Contractor’s report of findings shall include a detailed quote that includes a complete breakdown of parts and labor necessary to return the component to serviceable condition. The Contracting Officer will either initiate negotiations for the work or accept the Contractor’s quote and issue a modification to the task order authorizing and incorporating pricing for the repair work.
8.4 Requirements for Supplier Changes
The Contractor shall, immediately upon discovery, notify and disclose conditions to the Contracting Officer of any event, supply change, material change, supply malfunction, counterfeit/suspect parts or materiel, defect or non-airworthy condition of any product or component listed on the schedule found to have potential cause with a non-conformity to the original specifications of this contract. The Government reserves the right to inspect any non-conforming product or component. Therefore, the Contractor shall obtain approval from the Contracting Officer prior to the disposition of any non-conforming product or component.
The Contractor’s quality control manual shall address in detail the Contractor’s risk management, test, inspection, non-conforming product, and counterfeit/suspect parts processes.
The Contractor shall immediately notify the Contracting Officer of any changes that potentially have an impact on the product. Changes may include but are not limited to products, processes, material, supplier sources, manufacturing facility location and personnel qualifications.
Upon notification of the change, the USCG will approve or deny the change. Facility location changes may require the Government to perform a facility inspection. The Contractor shall allow the Government access to all applicable areas of the Contractor’s facilities to ensure compliance with contractual requirements. In the event that the USCG does not approve the change, the contract or task order may be cancelled or terminated in accordance with the Federal Acquisition Regulation (FAR) 52.212-4.
Unless otherwise specified, the Contractor shall flow down all requirements in this contract to their supply chain, to include all suppliers and subcontractors, if any.
9.0 USCG ASSET COMPUTERIZED MAINTENANCE SYSTEM (ACMS) REQUIREMENTS
9.1. ACMS Documentation
The ACMS used by the USCG is design to capture, store, and report asset maintenance information. The Contractor shall comply with all USCG ACMS documentation requirements.
9.2 Component Repair Record
Components to be repaired under this contract are serial number tracked under USCG ACMS. This tracking provides historical records of repairs/major repairs flight times, cycles, item location, status, and an effective method of configuration control. Components that are serial number tracked under USCG ACMS should have a blank CRR, and a current Significant Component History Report (SCHR) attached to the component at the time of receipt.
9.3 SCHR Records
The SCHR records the maintenance history of the serial number tracked components. It remains with its corresponding part until reinstalled on an aircraft or is annotated “BER” and scrapped. (NOTE: written approval from the Contracting Officer is required prior to scrapping a serial number tracked component). The SCHR for scrapped components shall be return with the component.
9.4 Reporting Discrepancies
The Contractor shall verify the data included in the SCHR and CRR attached to the component corresponding with the NSN, P/N, and S/N of the component received. The Contractor shall promptly report discrepancies to the USCG Contracting Officer prior to performing any work.
9.5 Component SCHRs
The original CRR, which includes pre-printed identification for each part, shall be accompanied and returned with the part. The following areas of the CRR shall be correctly documented: Narrative summary of work performed (cannot include references to an offsite database), facility performing work, facility work order number, or date work performed. Mark “appropriate maintenance procedures” completed during repair and authorizing signature. If unsure, about which “appropriate maintenance procedures” were completed contact your government representative for clarification. The government shall not accept any original CRR returned not properly completed until a properly completed CRR is received. The Contractor shall retain a copy of the CRR for ninety-(90) calendar days. The information provided in the CRR shall be used by the USCG to update the component SCHRs.
The Contractor shall provide a copy returned with the component upon completion of the repair/overhaul.
10.0 DOCUMENTATION REQUIREMENTS
10.1 Contractor Verification of Receipt of Components
All S/N tracked items under this contract shall be inspected and accepted by the Contractor. Within five (5) working days following the receipt of component(s), the Contractor shall provide emailed notification of the following to the Administrative Contract Specialist (designated at time of contract award):
• Date of receipt of component(s);
• Confirmation of S/N(s)/PN(s);
• Applicable Task Order and line item number
Notification via email is required.
10.2 Airworthiness Certification for Repaired/Overhauled Equipment
The components repaired/overhauled under this contract shall be airworthy and suitable for installation on USCG aircraft. The Contractor shall furnish a Certificate of Airworthiness for all components. The Certificate of Airworthiness shall be provided in the form of a FAA Form 8130-3, EASA Form 1, or DOD equivalent. This form shall be packaged with each component. Records of COA’s shall be made available or provide for review by the Government upon request. FAILURE TO SUBMIT THE APPROPRIATE CERTIFICATE WILL
RESULT IN NON-ACCEPTANCE OF THE DELIVERED ITEM.
11.0 SPECIAL INSTRUCTIONS
11.0 Government Property Furnished for Repair/Overhaul
As per FAR 16.503 (c), Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
11.1 Accelerated Turn-Around-Time and Delivery
Only the Contracting Officer may request and authorize an accelerated turn-around-time and delivery if needed by the Government for delivery to the USCG, ALC Receiving Department, Building 63, 1664 Weeksville Rd., Elizabeth City, NC 27909. In the event an accelerated turn-around-time and delivery is require, which the Contractor can meet, the Contractor shall be entitled to compensation for additional labor hours and expedited freight costs necessary to complete performance earlier than the turn-around-time and delivery schedule established in the task order. After receiving a written request from the Contracting Officer for an accelerated turn-around-time and delivery, the Contractor shall provide a written response within one (1) business day advising if an accelerated turn-around-time and delivery can be accomplished and include any additional costs necessary for the accelerated performance. Accelerated performance may be authorized in writing via a task order modification. If the Contractor accelerates turn-around-time and delivery on its own initiative in order to meet the delivery schedule established in the task order, the additional costs are not recoverable from the Government.
11.2 Aircraft on Ground (AOG) Situations
Upon notification from the USCG that an AOG situation exists, the Contractor shall expedite the repair/overhaul and initiate shipment within seven (7) calendar days or less. Material shall be ship by the fastest traceable means, e.g. Air Freight "next day delivery". The shipping container shall be marked on the outside in highly visible lettering "A.O.G."
In the event an AOG status occurs because of a lack of any of the components specified in the schedule, the Contractor may be notify by the Government in writing of the AOG situation and applicable USCG Air Station and be requested to provide a written response within twenty-four (24) hours with the following information: 1) status of the component(s) needed to satisfy the AOG condition that includes what USCG items in-house for repair/overhaul are closest to completion under normal working conditions and 2) an estimate of the labor hours needed to accelerate repair completion. The accelerated repair/major repair work shall be authorized via a Task Order Modification in conjunction with mutually agreed upon prices, overtime pay, delivery, and shipping cost reimbursement for next day delivery to the applicable USCG Air Station. Note: The last sentence only applies to units that are not past due the delivery date(s) on the Task Order.
In the event of an AOG situation, the Task Order and applicable Task Order Line-Item Number shall be modified to reflect the USCG Air Stations delivery address and the applicable USCG Requisition Number. The Contractor shall be required to ensure the Requisition Number is included on shipping documents/delivery tickets so that the applicable USCG Air Station receiving personnel can process the Material Receipt.
11.3 Aircraft Accidents and Incidents
Disposition of evidence, including Landing Gear components, involved in aircraft accidents or incidents shall be IAW current Government investigation procedures. These procedures are IAW and at the direction of the National Transportation Safety Board, whose rules and regulations delegate to the Government such authority as is appropriate. Contractor participation in these proceedings will be determine by the president of each accident or incident board and directed by the Contracting Officer. Investigations of Landing Gear failures undertaken outside of formal proceedings will be a cooperative effort between Contractor and the Government.
11.4 WARRANTY
The Contractor shall warrant that the repair/overhaul services performed pursuant to this contract will be free from defects in material and workmanship under normal use and service during a period of (1) six months or five hundred (500) flight hours from the date of installation on the aircraft or (2) twelve (12) months from the date of shipment of such unit to the Government, whichever comes first.
The Government’s sole remedy under this warranty is repair or replacement, at the Contractor’s sole discretion, of the defective unit.
12.0 CONTRACT ADMINISTRATION
12.1 Delivery Schedule/Turn-Around-Time
The requested delivery schedule for the Components is sixty (60) calendar days After Receipt of Material (ARM) and all required documentation at Contractor’s facility.
Early delivery is desired if there is no extra costs to the Government. Turn-around-time is defined as beginning at the time of receipt of components at the Contractor’s facility and ending at the time of delivery to USCG, ALC Elizabeth City, North Carolina.
12.2 F.O.B. Point
Delivery terms shall be F.o.b. Destination from Contractor facility to USCG ALC, Elizabeth City, NC under routine conditions. “Aircraft on Ground (AOG)” urgent requirements may be F.o.b. Origin, if a modification is complete and Freight Prepaid where shipping costs are reimbursable. Shipping costs over $100 shall be accompany by a copy of the freight bill and annotated on the invoice shall be as a separate charge.
12.3 Period of Performance
The period of performance includes a one-year base period and four (4) one-year option periods, if exercised.
12.4 Shipping Instructions
Deliverable items shall be shipped to the following address:
USCG Aviation Logistics Center 1664 Weeksville Road Receiving Section, Bldg 63 Elizabeth City, NC 27909-5001
Mark for: Contract Number: (To be assigned at time of award) Task Order Number: (To be assigned at time of issuance)
Unless otherwise specified documents, reports, and correspondence shall be send to the following address:
USCG Aviation Logistics Center (ALC) SRR Contracting, Hangar 75 1664 Weeksville Road Elizabeth City, NC 27909-5001
Mark for: Contract Number: (To be assigned at time of award) Task Order Number: (To be assigned at time of issuance)
Electronic copies shall be sent to the Administrative Contract Specialist (designated at time of contract award).
12.5 Inspection and Acceptance
Final inspection and acceptance of material under this contract shall be perform at destination by local quality assurance (QA) personnel and shall consist of count, condition, and verification that all required documentation has been provided. ALC considers components RFI upon acceptance.
12.6 Packaging and Preservation
All components and parts covered under this contract shall be stored and shipped in Contractor-provided shipping containers. Any damage sustained during shipment/handling/storage of the components due to Contractor's improper maintenance/packaging and preservation of the container, shall be the responsibility of the Contractor. Any exposed components shall be additionally wrap for preservation.
12.6.1 Articles shall be packed and shipped per MIL-STD-2073-1 or American Society for Testing and Materials equivalent, in a manner that will accommodate shipping environments normally encountered within the commercial distribution system and ensure safe transportation at the lowest rate to the point of delivery.
Each line replaceable unit shall have its own shipping container. Packaging material shall not consist of popcorn, shredded paper, Styrofoam of any type, or peanut packaging.
12.7 Marking Instructions
All shipping containers/packages shall be marked for delivery IAW the task order. All components, which require special care during packing, handling, or shipping shall be identify and marked appropriately. The exterior of the package or shipping container shall be legibly marked with the following information in such a manner that the marking shall not be render illegible when opened.
• Nomenclature
• Serial Number
• National Stock Number
• Contract Number
• Task Order/Item Number
• Contractor’s Name and Address
12.7.2 All items returned as BER IAW section 7.4.2 shall also be clearly marked with the word “BER”.
12.8 Payment Instructions
All payments will be made electronically IAW FAR 52.232-33. The Contractor may submit invoice five (5) days after shipment of items. The invoice will not be approved until all items listed on the invoice have been receipted.
12.9 Invoice Instructions
Unless otherwise specified in the schedule or on Task Orders, the Contractor shall submit invoices IAW FAR 52.212-4 to the designated billing office for payment as noted below. The Contractor is HIGHLY encouraged to submit invoices electronically to ALC-Fiscal@uscg.mil.
Chief, Fiscal Branch USCG, ALC Fiscal Branch, Bldg. 63 1664 Weeksville Road Elizabeth City, NC 27909-5001 Contract Number: (To be assigned at time of award) Task Order Number: (To be assigned at time of issuance)
12.10 Administration Information. This contract will be administered by USCG, ALC, SRR Contracting Branch, Elizabeth City, NC.
12.11 Ordering Office. The following activity is the only unit authorized to place task orders under this contract:
Contracting Officer
USCG ALC, SRR
Elizabeth City, NC 27909-5001
12.12 Contract changes
All requests for contract changes must be submitted in writing to the Contracting Officer. Changes to the contract may be made only by written agreement of the parties via the form of a contract modification signed by the Contracting Officer.
12.13 CONTRACTOR’S ADDRESS OF CORRESPONDENCE
All correspondence, except as otherwise specified, for the Contractor shall be directed to the following address:
Safran Aerosystems Services Americas, LLC 4900 St. Joe Blvd, Bldg.#200 Atlanta, GA 30337-6314 mailto:ALC-Fiscal@uscg.mil