ATTACHMENT 2 - Statement of Work_26 July 2024.pdf
PDF 1 MB Posted
- Attached to
- Building 32 Baffles
- Solicitation number
- FA860124Q0147
About this file
This document is a Statement of Work (SOW) for an Acoustic Ceiling and Wall Baffle Package at Wright Patterson Air Force Base, Ohio. The project involves providing and installing acoustical ceiling baffles, clouds, and wall tiles to meet specific requirements for minimum NRC ratings, materials, and design specifications. The SOW covers design services, product delivery, installation, and inspection/acceptance procedures.
The related federal contract opportunity is a solicitation (FA8601-24-Q-0147) to award a firm-fixed-price contract for the required acoustical products and services. The solicitation is a commercial acquisition using simplified procedures, with award to the lowest priced, technically acceptable offer that is fair and reasonable. A mandatory site visit is scheduled for August 12, 2024, and quotes are due by August 23, 2024. The period of performance is up to 10 weeks from contract award for installation. Offerors must provide detailed descriptions, drawings, and pricing for the specified acoustical items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01-SOW Statement of Work -Acoustic Ceiling and Wall Baffle Package Wright Patterson AFB, OH
DAF version 06 MAY 2024
Acoustic Ceiling and Wall
Baffle Package
SOW
26 July 2024
Facility 20032, 1st Floor
Area B
2300 D Street
Wright-Patterson Air Force Base, OH 45433
Stephanie Nishanov Interior Design Specialist
Wright Patterson AFB CEG‐Interior Design Specialist 5151 Wright Ave, Building 11
WPAFB, OH 45433‐5339
937‐207‐2098
DAF version 06 MAY 2024
Revision History
Author Name Date Reason For Changes Version
DAF version 06 MAY 2024
1.0 Scope
This project will be proposed using product lines with Open Market/GSA. This project will be awarded on a competitive basis using total project cost.
• Itemized quote that includes labor to receive, inspect, deliver to project job site and install product per approved final design layout.
• Refer to section 4.0 for site conditions.
• AutoCAD/Revit or equivalent design hours for all phases of design (initial, revisions and final).
• Design hours for meetings to review all phases of design (initial, revisions and final), finish selections, site visits (field measurement), and any other means and methods for the contractor to execute the project.
Reference 2.2.20 for additional information regarding redesigns.
• HVAC, Fire suppression, and alarm systems will not be altered.
Baffles to be installed per code and manufacturer guidelines around existing site. Reference 2.4.6 (but not limited to)
• Average Horizontal Illumination for open office: 30 footcandle (FC) at 2’-6” AFF.
Horizontal Illuminance Uniformity: 2:1 average to minimum (note – some calculations use maximum to average, others maximum to minimum, we need average to min). Contractor to ensure we maintain this proper rating when baffles are installed.
• Open bays to meet RT60. Contractor to provide overall acoustical results to proposed design and results once installation has been completed
• Acoustical testing has been completed by Ketchum/ Walton CO for the existing space. Carnegie/Kirei has created a preliminary design and study for the baffle project. (OPP 448536)
• Products to be installed per the manufacturer’s guidelines.
• For this project repair/replace acoustical items, furniture, flooring and ceiling, if damaged during installation of project.
• Provide overall 2D and detailed 3D floor plan (include site in rendering) and 3D renderings of each typical
• The basis of design is not restricted to the stated manufacturers.
For this project we require the following product types: Baffles, Clouds and Acoustical Tiles
Basis of design: equivalent or better
Ceiling Baffles- Rectangular
Typical B.1
Tag Item Description Finishes
QTY: 530+/‐
Based on meeting RT60 requirement
• To come from the same manufacturer as B1.A, B.2 and B.2A
• Rectangular baffle
• Minimum NRC rating of .9
• Minimum of 12 mm HPD
• Minimum: 94”L x 11”H
• Maximum: 97”L x 12”H
• ASTM E84 Class A
• PET
• Minimum 60% pre consumer recycled content
• Intermix minimum of 2 colors
• Installation:
• Refer to I‐1
• To be hung level and parallel in‐between existing suspended lighting
• Ceiling height: Dropped ceiling with 24”x24” tiles
• Approximately 13’‐9”H
• Installation height: minimum of 24” below sprinkler deflector
• Distance between baffles: approximately 24”.
Not to fall below 24”
• Airplane cabling or commercial heavy‐duty cabling per manufacturer’s guidelines
• Baffles not to sway
For Government Use OnlyMeets Does Not Meet
Reason(s) does not meet:
Kirei, Simple Baffle is depicted
• PET:
• Minimum of 18 color options
Typical B.1A
Tag Item Description Finishes
QTY: 270 +/‐
Based on meeting RT60 requirement
• To come from the same manufacturer as B1, B.2 and B.2A
• Rectangular baffle
• Minimum NRC rating of .9
• Minimum of 12 mm HPD
• Minimum: 47”L x 11”H
• Maximum: 50”L x 12”H
• ASTM E84 Class A
• PET
• Minimum 60% pre consumer recycled content
• Intermix minimum of 2 colors
• Installation:
• Refer to I‐1
• To be hung level and perpendicular in‐between existing suspended lighting
• Ceiling height: Dropped ceiling with 24”x 24” tiles
• Approximately 13’‐9”H
• Installation height: minimum of 24” below sprinkler deflector
• Distance between baffles: approximately 24”.
Not to fall below 24”
• Airplane cabling or commercial heavy‐duty cabling per manufacturer’s guidelines
• Baffles not to sway
For Government Use OnlyMeets Does Not Meet
Reason(s) does not meet:
Kirei, Simple Baffle is depicted
• PET:
• Minimum of 18
Ceiling Baffles- Rectangular
Typical B.2
Tag Item Description Finishes
QTY: 167 +/‐
Based on meeting RT60 requirement
For Government Use OnlyMeets Does Not Meet
Reason(s) does not meet:
Kirei, Echostar + and Turf, Fractal are depicted
• To come from the same manufacturer as B.1, B1.A and B.2A
• 3d geometric ceiling cloud
• Minimum NRC rating of .9
• Minimum of 12 mm HPD
• Minimum: 35”L x 31”H (for hex) x 5”D
• Maximum: 36”L x 32”H (for hex) x 7.5”D
• ASTM E84 Class A
• PET
• Minimum 60% pre consumer recycled content
• Intermix minimum of 2 colors
• Installation:
• Refer to I‐1
• Ceiling height: Open ceiling with pitch
• Highest point approximately 25’‐10”
• Lowest point approximately 14’‐0”
• Contractor to provide structural beams/support to suspend baffles from. Refer to images for site conditions
• To be installed at approximately 147”H
• Tile groupings cannot exceed 48” width
• Airplane cabling or commercial heavy‐duty cabling per manufacturer’s guidelines
• Baffles not to sway
• PET:
• Minimum of 18
Ceiling- Acoustical Hexagon/ Geometric Shape
Typical B.2A
Tag Item Description Finishes
QTY: 46+/‐
Based on meeting RT60 requirement
For Government Use OnlyMeets Does Not Meet
Reason(s) does not meet:
Kirei, Echostar + and Turf, Fractal are depicted
• To come from the same manufacturer as B.1, B1.A, and B.2
• 3d geometric ceiling cloud
• Minimum NRC rating of .9
• Minimum of 12 mm HPD
• Minimum: 35”L x 31”H (for hex) x 5”D
• Maximum: 36”L x 32”H (for hex) x 7.5”D
• ASTM E84 Class A
• PET
• Minimum 60% pre consumer recycled content
• Intermix minimum of 2 colors
• Installation:
• Refer to I‐1
• Ceiling height: Dropped ceiling with 24”x24” tiles
• Approximately 13’‐9”
• Installation height: minimum of 24” below sprinkler deflector
• Tile groupings cannot exceed 48” width
• Airplane cabling or commercial heavy‐duty cabling per manufacturer’s guidelines
• Baffles not to sway
• PET:
• Minimum of 18
Ceiling- Acoustical Hexagon/ Geometric Shape
Wall Acoustic Tile
Typical B.3
Tag Item Description Finishes
QTY: 16
openings
• 3d hexagon wall acoustical tile
• Minimum NRC rating of .9
• Minimum of 12 mm HPD
• Minimum: 11”L x 11”H x 2”D
• Maximum: 14”L x 15”H x 7”D
• ASTM E84 Class A
• PET
• Minimum 60% pre consumer recycled content
• Intermix minimum of 4 colors
• Installation:
• Refer to images
• Approximately 36”H‐ 42”H
• Total of (16) 6’ wide corridor openings. Tiles to cover minimum of 75% (but not completely covered) above opening and part of ceiling. Transition outwards, approximately 8’ on both sides, to approximately 5%.
• Tiles to be randomly clustered in centralized areas to create organic design
• Minimum clearance around sprinkler head: 36”
• Adhesive or clips (no track)
CONTINUATION ON NEXT PAGE
For Government Use OnlyMeets Does Not Meet
Reason(s) does not meet:
Kirei Diamond and Turf Hex are depicted
• PET:
• Minimum of 18
CONTINUATION Wall Acoustic
Typical B.3
Tag Item Description Finishes
For Government Use OnlyMeets Does Not Meet
Reason(s) does not meet:
• PET:
• Minimum of 18 color options
• Randomly clustered near “pass through” and then taper off
Example of installation (NOT TO SCALE)
DAF version 06 MAY 2024
Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer. It is understood that the actual site parameters or certain customer requirements may deviate from the standard typical layouts; therefore, any deviation that causes an increase in the price submitted during the bid process must be documented in writing and submitted to the Contracting Officer for review, along with a floorplan reference to show just cause. A final acoustical product layout and Bill of Materials (BOM) will then be provided that meets the customer requirements and accommodates the physical environment. Design parameters and expectations are followed in Section 2.2
2.0 Description of Work
Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer. Contractor will also meet with Interior Designer (Stephanie Nishanov, Stephanie.Nishanov@us.af.mil) and end user to finalize finishes.
2.1 General Services
Coordination and management of all products, equipment and people required to create, deliver, and install acoustical items within an Air Force location. This includes ongoing servicing of any items defective due to manufacturing error as well as for replacement or repair of any damaged item after purchase.
2.1.1 The contractor shall perform tasks on Furniture Fixtures and Equipment (FF&E ) in accordance with the requirements stated in this section and Contract.
2.1.2 The contractor shall be responsible for all personnel, equipment, tools, materials, supervision, storage, assembly, transportation, incidentals and all other items and services necessary to provide and install acoustical items.
2.1.3 The contractor shall be knowledgeable of and shall comply with all applicable federal, state, and local laws, codes, permits, DoD, AF, and base requirements and instructions required for the performance of the duties in this Statement of Work (SOW).
2.1.4 The contractor shall ensure policies and procedures are established that protect the safety and welfare of customers, employees, and the community to minimize or eliminate safety or environmental risks. These policies shall be in compliance with Federal and Installation policies and procedures.
DAF version 06 MAY 2024
2.1.5 The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer (CO) within 10 days after contract award. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operations of this contract on the installation.
2.1.6 The contractor shall provide a Project Manager with a minimum of 3 years of experience installing your company's product, responsible for project site management, scheduling, coordination, and technical assistance to the Air Force representative as required throughout the project. Resumes and letters of intent shall be provided upon request.
2.1.7 Any electrician provided by the contractor shall be a licensed electrical contractor.
2.1.8 The contractor shall submit a complete list of personnel in accordance with installation policy, including deliverymen, who will be expected to work on the installation. This list will contain Privacy Act information as required as well as the expectation that each individual will be able to present a current and valid state/federal identification complying with the REAL ID Act, to meet local Air Force security requirements. (Please note that many installations require this information be coordinated days in advance).
2.1.9 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.
2.1.10 Reserved
2.1.11 The contractor shall manage ordering, shipment, delivery, and installation of all new acoustical items from manufacturer to final acceptance by the Government Project Manager (GPM).
2.1.12 The contractor shall provide customer service during normal duty hours, 0730-1630 hours, Monday through Friday; except for federal holidays.
2.1.13 Recognized US Federal Holidays are as follows: New Year’s Day, Birthday of Martin Luther King Jr., Washington’s Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday.
DAF version 06 MAY 2024
2.1.14 When the contractor desires to work other than standard times, a written request shall be submitted to the GPM for approval. Written approval from the CO must be received before proceeding with the work. The request shall be submitted at least five (5) workdays prior to the proposed performance of work, and it shall indicate the day/days, time/amount of work, and reason why performance is necessary during nonstandard hours.
2.1.15 The contractor shall provide alternate work locations for employees or allow employees to take vacation during designated Government non-workdays or other periods where government offices are closed.
2.1.16 All Air Force inquiries shall be responded to by a contractor representative within two business days.
2.1.17 Meetings may periodically be held between base personnel and contractor management to discuss contract status. The CO will notify the contractor in writing in advance of the place and time of required meetings.
2.1.18 Reserved
2.1.19 The contractor shall be responsible for coordination of an escort through any controlled areas through the local GPM.
2.1.20 Lost vehicle and entry passes shall be reported immediately to the Security Police as well as the GPM in accordance with the local security forces policy.
2.1.21 The contractor shall be responsible for any storage up to maximum of 30 days of all acoustical items, components, parts, and assemblies prior to and during installation in accordance with the agreed upon delivery schedule.
2.1.22 Reserved
2.1.23 The contractor shall maintain the capability to adjust workforce in the event of unforeseen circumstances such as extended duty hours, travel, classes and education, and mission related changes. These expenses are reimbursable with prior approval of the GPM and the CO.
2.1.24 The contractor shall maintain continuity between the support operations at FACILITY 20032, WPAFB, Ohio and all other assigned performance locations and the contractor’s corporate offices. The contractor shall provide the necessary resources to manage and administer the contract.
The contractor shall, as a minimum, maintain a single point of contact for this effort to be available in person to the 88ABW Civil Engineering Directorate, CENM, Stephanie Nishanov, Interior Design Specialist, 937-207-2098 or thru email at stephanie.nishanov@us.af.mil during the same business day.
DAF version 06 MAY 2024
2.1.25 The contractor shall provide for the management and support of personnel, to include: making necessary arrangements for employees required to travel; supporting personnel co-located at FACILITY 20032, WPAFB, Ohio and other locations specified with additional resources, expertise, advice; necessary infrastructure to support work to be accomplished off-base; conducting personnel meetings; providing administrative support for employees in a timely fashion; and providing facility and staff security requirements.
2.1.26 All personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
2.2 Design Service
2.2.1 Providing professionals versed in programming, space planning and product specification, able to communicate product capabilities to the customer, to ensure products purchased meets the requirements.
2.2.2 As a part of the request for proposal/quote process, the contractor will propose products and a design that takes into account site layout considerations, as well as other information gathered during initial customer review. The proposal shall show list price and discount and net price.
2.2.3 The contractor shall provide design services, including space planning, site verification, material selection and programming as necessary for the project.
2.2.4 The contractor shall define and furnish the necessary hardware, software, and all other equipment necessary to accomplish design tasks. Standard equipment in addition to the hardware and software shall include but not necessarily be limited to reproduction machines, plotters, paper, pencils, fax machines, and office furniture.
2.2.5 The contractor shall be responsible for collection of information relevant to the design/redesign of a space. Examples could include personnel interviews, questionnaires, and walk-through inspections of the facility, as well as the existing furniture database (if available).
2.2.6 Services shall include site evaluation to ensure proper fit of the acoustical items within the given space and that all structural and other anomalies are taken into account.
2.2.7 The contractor is responsible for notifying the GPM of all power requirements regarding location of communication, LAN, and power junction boxes, with the expectation that the government will be responsible for providing and locating those junction boxes within 4'-0" of the ceiling penetration of the power pole location provided by the contractor.
2.2.8 Design shall ensure that power poles do not protrude into main walkways.
DAF version 06 MAY 2024
2.2.9 Design shall ensure that all outlets included in the design are accessible to the user, free and clear of obstacles.
2.2.10 Design shall not allow more than four cubicles to be served by a single circuit. Per UFC 3-520-01 section 3-6.1.2 Limit loads to a maximum of four (4) workstations per 20A circuit.
2.2.11 Reserved
2.2.12 Reserved
2.2.13 Design shall ensure that no existing wall outlets or thermostats are covered or concealed by panels or other systems furniture components.
2.2.14 Design shall consider utilize wall mounted applications where possible.
2.2.15 The contractor shall utilize any existing government product to its maximum as applicable when project includes add on parts to existing systems furniture.
2.2.16 All designs of furniture layouts, including original designs and any subsequent redesigns, must be accomplished by qualified professional designers and should have three years’ experience using software similar to that proposed for this contract.
2.2.17 The contractor shall meet with the GPM to review the installation drawings prior to submission of any revised price quote.
2.2.18 The contractor shall provide additional drawings of furniture layouts, if requested by base organizations via mutually agreed upon electronic media transfer in both .dwg and .pdf formats unless otherwise specified in the contract.
2.2.19 The hardware/software shall perform computerized inventory, computer aided design, automated take-off function, and report generation for all product purchased. The software for this contract shall be compatible software for AutoCAD and Revit. The software shall be fully compatible with Microsoft Windows, the most current version.
2.2.20 Design service shall include redesign with up to three additional revisions for each bay prior to final approval.
Need to ensure design is compliant with HVAC, Fire Suppression and Alarm system.
DAF version 06 MAY 2024
2.2.21 Designs of each location shall include a Basic component floor plan sheet in which all acoustical items are tagged: to include graphic symbols for all major hanging components (flipper cabinets, shelves, task lights, tack boards, work surfaces, drawers, etc.) as determined by the government.
This design sheet shall include station numbers and movable wall and associated product locations, in 1/4" = 1'-0" scale.
2.2.22 Designs of each location shall include a Panel and Hardware Layout sheet:
to include all finish colors and fabrics, panel widths (30", 36", 42", etc.), in 1/4" = 1'0" scale, in addition to display hardware, keys and locksets shall be included.
2.2.23 Reserved
2.2.24 Within ten (10) workdays after the final design has been accepted by the base requesting organization, a bill of materials detailing all inventory, and (electronic) copies of all plans including basic floor plan, movable wall, panel, and electrical layouts will be provided to the GPM for the project.
2.2.25 The contractor shall maintain an updated, automated master copy of all acoustical layouts, (designs/redesigns) accomplished under this contract for the duration of the warranty, after government acceptance of the project.
2.2.26 Drawing changes required to a layout due to contractor errors or omissions shall be the responsibility of the contractor and the corrected drawing and bill of materials shall be delivered to the government within three calendar days of the request.
2.2.27 Contractor shall provide the GPM a copy the installation drawings and bill of materials via mutually agreed upon electronic media.
2.2.28 Contractor shall make the government aware of any discrepancies to existing conditions not previously identified.
2.2.29 Design shall conform to the parameters established in the Architectural Barriers Act regarding accessibility of persons with disabilities.
2.3 Product Markings/Documentation/Tools
2.3.1 Items used after product acceptance used to identify or modify a particular product.
2.3.2 All documentation (Owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, etc.) shall be provided to and reviewed with the GPM upon completion of the installation.
DAF version 06 MAY 2024
2.3.3 Special assembly tools (security hardware wrench, spare parts provided with the furnishings, etc.) shall be provided to the GPM prior to final Government acceptance of products and services.
2.4 Delivery Services
2.4.1 Transportation of all products, loading, unloading, storage, and all necessary movement from factory to final onsite set up.
2.4.2 The contractor Project Manager shall be responsible for on-site coordination of all staging and deliveries, to include access to and operation of any equipment needed for unloading and movement of materials or product.
2.4.3 Contractor shall be responsible for determination of the appropriate delivery method and handling, based on site conditions to include the non-existence of loading docks and equipment at any given location. Special circumstances may be identified to and negotiated with the CO.
2.4.4 Delivery shall be in accordance with the terms of the contractor's agreement. If the ordering activity designates an accelerated delivery schedule it will be identified in the contract.
2.4.5 A maximum of 30 days offsite storage shall be included in the contractor's agreement.
2.4.6 Work shall comply with applicable building standards
and codes, specifically: National Electrical Code (National Fire Protection Association) NFPA 70, NFPA 101and NFPA 13.
2.4.7 The contractor shall be responsible for following all
safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.
2.4.8 The contractor shall maintain accountability and
control of any keys provided and shall return them to the GPM upon completion of work. Duplication of keys or other means of access is not authorized.
2.4.9 The contractor shall prevent its personnel from
entering any area other than the designated work area.
2.4.10 The contractor shall maintain a means of egress
within all designated work areas to comply with fire codes.
2.4.11 The contractor shall ensure its personnel eat, drink, or smoke only in designated areas.
DAF version 06 MAY 2024
2.5 Installation and Removal Services
2.5.1 Manufacturer certified professionals to install acoustical items per the approved design drawings.
2.5.2 Contractor shall provide or have capability of obtaining support services to include removal and warehousing of the proposed acoustical items.
2.5.3 The contractor shall appoint an authorized representative who will be the company's senior representation on site for all customer communication and enforce compliance of all requirements for the project. This representative shall have a physical presence during any delivery and throughout installation unless agreed to by the GPM.
2.5.4 The contractor representative shall meet with GPM to review the installation drawings prior to installation.
2.5.5 The contractor shall install acoustical items in accordance with each requirement statement and basic component floorplan, panel plan and electrical plan, designed and provided by the contractor with each purchase.
2.5.6 Contractor shall be liable for any damage to government property caused by the contractor or their representatives.
2.5.7 During installation the contractor shall protect all furniture and building materials, to include carpet, existing within the space with industry approved protective coverings inclusive of craft paper, moving blankets and such type of material. The contractor shall not use protective materials that will leave any type of residual print, outline or imaging on any furniture or building materials. Contractor shall not repair damage to finishes unless directed by CO but will be responsible to pay for damages.
The government will make repairs and back charge the installation contractor.
2.5.8 Services shall include product transportation of existing inventory as required.
2.5.9 The contractor shall uncrate/unpack all items and perform required assembly in accordance with the manufacturer instructions. Services shall include inspection of product for shipping damage. If damage is found it shall be the responsibility of the contractor to notify the GPM and make all arrangements for replacement or repair of the item(s) damaged.
Damaged items are not to be installed unless otherwise directed by the
GPM.
2.5.10 Services shall include assembly of product to conform to final Air Force approved design drawings.
2.5.11 Any furnishings attached to the building shall be attached securely.
DAF version 06 MAY 2024
2.5.12 Installation of acoustical items must be under the oversight of an onsite manufacturer certified installer.
2.5.13 Reserved
2.5.14 Services shall include removal of packing materials from the installation and cleaning of product including steam cleaning reused panels and thorough cleaning of all products.
2.5.15 Services shall include removal of all excess product and transport to the GPM approved warehouse or other location as specified.
2.5.16 Reserved
2.5.17 All trash removed from the worksite shall be disposed of in accordance with state laws, and packaging and other recyclable materials shall be recycled wherever possible.
2.5.18 The contractor shall maintain environmental controls when working in any government facility, to include but not limited to keeping doors shut and lights off when not in use and turning off vehicle engines when parked.
2.5.19 Light fixtures shall have appropriate lamps and be in working order.
2.5.20 Prior to acceptance, the contractor shall clean the site and all acoustical items with the manufacturer's recommended cleaning agents/products.
2.5.21 The contractor shall provide all components, completely assembled, installed, and operational.
2.5.22 Acoustical items, equipment, and accessories shall be level, square, and in proper alignment with adjoining space.
2.5.23 The contractor shall inspect to ensure the acoustical items are free of surface dirt and defects, the installation is complete, and the space is ready for use.
2.6 Inspection/Acceptance Checklist
2.6.1 Validation between the contractor and the GPM that all product has been installed according to manufacturer guidelines and customer specifications.
2.6.2 A post-installation walkthrough shall be coordinated with the contractor’s authorized representative and GPM.
DAF version 06 MAY 2024
2.6.3 All areas requiring correction shall be documented in a punch list by the contractor and provided to the GPM upon completion of a joint walk through by the contractor and the GPM. No payment will be authorized while punch list items remain open.
2.6.4 A final walk through will be performed with the contractor and the GPM and the CO to ensure all punch list items have been addressed to the satisfaction of the government.
3.0 Government Furnished Support
3.1.1 Base support includes Government-controlled working space and utilities.
4.0 Site Conditions
4.1.1 Existing furniture to remain included but not limited to modular furniture, modular walls, privacy pods and seating will remain in place. Provide lift and means of installing the baffles, clouds and tiles over/around existing furniture.
4.1.2 Standard site conditions shall be considered those that include:
4.1.3 Free and clear hard surface access to the receiving and installation location during regular working hours.
4.1.4 Parking and off-loading area suitable for access by a semi-trailer combination or truck within 100 feet of the building entrance closest to product installation area
4.1.5 Threat condition level of the base requires dealer personnel to get base access in order to complete the product installation.
4.1.6 A staging area adequate to sort, stage and uncrate products along with a waste receptacle suitable for disposal of materials.
4.1.7 Includes electric power, working lights, heating and air conditioning, and access to a working freight elevator if location is on a floor other than the first floor.
4.1.8 Current and correct CAD drawings of the building shell
4.1.9 A building ready for the installation of acoustical items (i.e. other tasks such as painting and flooring are complete so as not to cause any delays in performance)
4.1.10 Contractor shall notify the CO of any deviations from the above standards, as well as any requests for equitable adjustment to the contract price based on a condition not available at site visit.
5.0 Voluntary Protection Program (VPP)/Safety
DAF version 06 MAY 2024
5.1.1 Voluntary Protection Program: The Air Force is part of the AOSHA VPP.
All contractors are required to familiarize themselves with the requirements of the VPP. Information on VPP can be accessed at https://www.osha.gov/vpp
6.0 Base/Installation Specifics
6.1 All commercial trucks must enter through Gate 26A, WPAFB, Ohio, which is located off St. Rt. 235, WPAFB, Fairborn, Ohio, for inspection. In accordance with the Installation 88 ABW/SFS base entry procedures must adhere to delivery vehicle process requirements mandated by the WPAFB AFI 31-101. Once at Gate 16A the driver must have a current pass AF Form 75, Visitor Pass, requested by 88 ABW/PZ, Area A, Building 1, POC assigned from Interior Designer, and be able to show:
A current Vehicle Registration A current Proof of Insurance A valid and current Driver's License for the driver
6.2 Gate Procedures:
Once at Gate 26A be prepared to exit the vehicle and allow for vehicle inspection. At this time you may ask for directions to your final destination.
If the final destination requires the driver to leave Gate 26A and re-enter the base through an alternate gate, the pass received will be sufficient documentation for entry into both gates, within a pre-established time directed by the Security Forces representative.
Arrival at the appropriate gate after the designated allotted time will result in non-admittance to the installation.
This procedure will occur each time a commercial truck requests access to the base.
6.3 Current Bill of Lading (BOL) to get delivery driver and the vehicle on base. BOL must include the AF installation name, date of anticipated delivery, and specific destination (including building number, street address, and point of contact information).
6.4 Personnel should the following items when entering an installation:
Current Registration for all vehicles Current Proof of Insurance for all vehicles Valid driver’s license for each driver Valid driver’s license or other state identification for each passenger Depending on the current Force Protection Condition, a government representative may be required to sponsor those people in person at Pass & ID, Area A, Building 286.
The sponsor must state the guest's purpose and destination. It is the responsibility of the contractor to validate this need with their government POC prior to their arrival so as to coordinate the arrival time accordingly.
Sponsors may request that a pass be applicable for multiple days if needed.
6.5 To sponsor 10 or more people, a typed list of those people must be submitted by the COR in Word or Excel format, stating LAST NAME then FIRST NAME of each person. The sponsor must submit that list to Pass & ID Area A, Building 286, no fewer than three days prior to the anticipated arrival. Names listed must be
DAF version 06 MAY 2024 complete names, (no nicknames), and correspond to the names on the state ID for each person.
6.6 Mission Essential Services: Contractors are not considered mission essential.
6.7 Prohibitions: Firearms may not be brought on base under any circumstances.
Individuals with criminal records are not allowed on base. Contractor personnel are prohibited from sponsoring guests onto the installation.
7.0 Delivery
7.1 Installation Details:
7.1.1 First floor installation. Provide lift gate service. If providing lift to install baffles, must provide ramp or means into the space.
7.2 Removal of Existing Furniture: N/A
7.2.1 List of existing furniture/locations: N/
7.3 Period of Performance: Installation to begin no later than 12 weeks from contract award and to last up to 10 weeks. This is inclusive of post award site visit, material finish selection, acoustical item lead time and installation.
7.4 Reserved
7.5 All corridors and aisles to be kept clear during installation.
7.6 The government has full ownership of all formal deliverables and required supporting documentation with regard to use, distribution and reproduction.
8.0 Attachments
8.1 Drawings:
8.1.1 I-1 Baffle, Clouds and Tile Plan
8.1.2 Reflective Ceiling Plan (TIFF)
8.1.3 B32, Site Condition Photos
8.2 Provided CAD files are a preliminary drawing set. Once awarded and after completion of construction if applicable, contractor is responsible for field verifying space.
File details come from the government source that posted it. Updated .