Attachment_2_-_Specs.pdf
PDF 754 KB Posted
- Attached to
- BLM-CO Lands End Comm Tower Reinforcement Federal contract opportunity
- Solicitation number
- 140L1722R0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L1722R0005_Amd_0001.pdf | ||
| Sol_140L1722R0005.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_1_-_SOW.pdf | ||
| Attachment_3_-_Engineering_Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T1
STRUCTURAL MODIFICATION
T
IT
L E
S H
E E
T
SITE NAME
PROJECT SITE ADDRESS
MODIFICATION PROVISIONS
THE MODIFICATIONS DEPICTED ON THESE DRAWINGS ARE BASED ON THE RECOMMENDATIONS
OUTLINED IN THE STRUCTURAL MODIFICATIONS ANALYSIS REPORT COMPLETED BY ISE INC. JOB #17190 DATED: SEPTEMBER 28, 2021 (REV 0). THIS REPORT IS BASED ON THE SPECIFIC ANTENNA
LOADING AND COAX CONFIGURATION. SEE REPORT FOR THE ANTENNA AND COAX LOADING
INFORMATION. ANY OTHER ANTENNA OF COAX CONFIGURATION REQUIRES REVIEW BY ISE INC.
SATISFACTORY COMPLETION OF THE MODIFICATIONS INDICATED ON THESE DRAWINGS WILL
RESULT IN THE STRUCTURE MEETING THE REQUIREMENTS OF THE SPECIFICATIONS UNDER
WHICH THE STRUCTURAL WAS COMPLETED.
CONTRACTOR SHALL FIELD VERIFY ALL: DRAWINGS, QUANTITIES, PART NUMBERS AND COAX /
ANTENNA PLACEMENTS PRIOR TO: BIDDING, ORDERING MATERIALS, AND CONSTRUCTION.
REFERENCED DOCUMENTS
DOCUMENT REMARKS DATE
CENTERLINE SOLUTIONS
TOWER AND ANTENNA MAPPING REPORT,
#AAI-15-0001
12/28/2015
CENTERLINE SOLUTIONS STRUCTURAL ANALYSIS REPORT, #AA-15-0001 12/27/2015
PROTEX GEOTECHNICAL INVESTIGATION, #11886 8/11/2020
PROTEX TOWER FOUNDATION MAPPING REPORT, #11886 8/5/2021
INDEX OF SHEETS
NUMBER TITLE REV
T1 TITLE SHEET 0
N1 MODIFICATION INSPECTION CHECK LIST AND NOTES 0
N2 PROJECT NOTES 0
S1 FOUNDATION MODIFICATION DETAILS 0
PROJECT TEAM
PROJECT CONTACT:
NAME: ADW
ADDRESS: 14350 N. 87TH ST.
CITY, STATE, ZIP: SCOTTSDALE, AZ 85260
PHONE: (480)-291-6820
TOWER MANUFACTURER:
NAME: --
ADDRESS: --
CITY, STATE, ZIP: --
PHONE: --
ISE INCORPORATED
P.O. BOX 50039
PHOENIX, AZ 85076
602-403-8614
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CITY, STATE, ZIP:
PHONE:
GEOTECHNICAL ENGINEER:
NAME: PROTEX
ADDRESS: 1102 WEST SOUTHERN AVENUE, SUITE 4
CITY, STATE, ZIP: TEMPE, AZ 85282
PHONE: (602)-272-7892
PROGRESS LOG
SHEET NUMBER
DRAWING DATE
PROGRESS
ISE JOB #: 17190
P.O. Box 50039 Phoenix, AZ 85076
PHONE: 602-403-8614
www.ise-inc.biz
ISE Incorporated Structural Engineers
KYISSUED TO CLIENT09/28/210
L A
N D
S E
N D
T O
W E
R S
IT
E
G R
A N
D J
U N
C T
IO
N C
O M
E S
A C
O U
N T Y
L A
T
' 2
.5
L O
N G
-1
' 2
.0
January 25, 2022
MGNote Update01/25/221
LANDSEND TOWER SITE
GRAND JUNCTION, CO (MESA COUNTY)
LAT: 39° 05' 26.5" LONG: -108° 13' 26.0"
Jan 25, 2022
THE MODIFICATION INSPECTIONS (MI) IS A VISUAL INSPECTION OF TOWER MODIFICATIONS AND REVIEW OF CONSTRUCTION INSPECTIONS AND OTHER REPORTS TO ENSURE THE INSTALLATION WAS CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NAMELY
THE MODIFICATION DRAWINGS, AS DESIGNED BY THE ENGINEER OF RECORD (EOR).
THE MI IS TO CONFIRM INSTALLATION CONFIGURATION AND WORKMANSHIP ONLY AND IS NOT A REVIEW OF THE MODIFICATION DESIGN ITSELF, NOR DOES THE MI INSPECTOR TAKE OWNERSHIP OF THE MODIFICATION DESIGN. OWNERSHIP OF THE STRUCTURAL MODIFICATION
DESIGN EFFECTIVENESS AND INTEGRITY RESIDES WITH THE EOR AT ALL TIMES.
ALL MI'S SHALL BE CONDUCTED BY AN OWNER APPROVED ENGINEERING VENDOR THAT IS APPROVED TO PERFORM ELEVATED WORK FOR
THE OWNER.
TO ENSURE THAT THE REQUIREMENTS OF THE MI ARE MET, IT IS VITAL THAT THE GENERAL CONTRACTOR (GC) AND THE MI INSPECTOR BEGIN COMMUNICATING AND COORDINATING AS SOON AS A PO IS RECEIVED. IT IS EXPECTED THAT EACH PARTY WILL BE PROACTIVE IN
REACHING OUT TO THE PROJECT CONTACT LISTED ON SHEET T1.
MODIFICATION CHECKLIST
CONSTRUCTION/INSTALLATION INSPECTIONS AND
TESTING REQUIRED (COMPLETED BY EOR) REPORT ITEM
PRE-CONSTRUCTION
X MODIFICATION INSPECTION CHECKLIST DRAWING
ENGINEER OF RECORD APPROVED SHOP DRAWINGS
FABRICATION INSPECTION
FABRICATOR CERTIFIED WELD INSPECTION
MATERIAL REPORT
FABRICATOR NDE INSPECTION
NDE REPORT OF MONOPOLE PLATE (AS REQUIRED)
N/A PACKING SLIPS
CONSTRUCTION
X CONSTRUCTION INSPECTIONS
X
FOUNDATION INSPECTIONS
X
CONCRETE COMP. STRENGTH AND SLUMP TESTS
X
POST INSTALLED ANCHOR ROD VERIFICATION
EPOXY OR GROUT
BASE PLATE GROUT VERIFICATION
CONTRACTOR'S CERTIFIED WELD INSPECTION
EARTH WORK: LIFT AND DENSITY
X (IF RQD) ONSITE COLD GALVANIZING VERIFICATION
GUY TENSION REPORT
G.C. AS-BUILT DOCUMENTS
POST-CONSTRUCTION
X AS-BUILT RECORD DOCUMENTS (STAMPED)
POST INSTALLED ANCHOR ROD / BOLT
PULL-OUT TESTING
X
PHOTOGRAPHS: COMPLETED PROJECT
X
POST-MODIFICATION REPORT
N1
GENERAL
NOTE: ( X ) DENOTES A DOCUMENT NEEDED
(N/A) DENOTES A DOCUMENT THAT IS NOT NEEDED
MODIFICATION INSPECTION NOTES:
THE MI INSPECTOR IS REQUIRED TO CONTACT THE GC AS SOON AS RECEIVING A PO FOR MI TO, AT A MINIMUM:
· REVIEW THE REQUIREMENTS OF THE MI CHECKLIST
· WORK WITH GC TO DEVELOP A SCHEDULE TO CONDUCT ON-SITE INSPECTIONS, INCLUDING FOUNDATION INSPECTIONS.
THE MI INSPECTOR IS RESPONSIBLE FOR COLLECTING ALL GENERAL CONTRACTOR (GC) INSPECTION AND TEST REPORTS, REVIEWING THE DOCUMENTS FOR ADHERENCE TO THE CONTRACT DOCUMENTS, CONDUCTING THE IN-FIELD INSPECTIONS, AND SUBMITTING THE MI
REPORT TO THE OWNER.
MI INSPECTOR
THE GC IS REQUIRED TO CONTACT THE MI INSPECTOR AS SOON AS RECEIVING A PO FOR THE MODIFICATION INSTALLATION OR TURNKEY
PROJECT TO, AT A MINIMUM:
· REVIEW THE REQUIREMENTS OF THE MI CHECKLIST.
· WORK WITH THE MI INSPECTOR TO DEVELOP A SCHEDULE TO CONDUCT ON-STE MI INSPECTIONS, INCLUDING FOUNDATION
INSPECTIONS.
· BETTER UNDERSTAND ALL INSPECTIONS AND TESTING REQUIREMENTS.
THE GC SHALL PERFORM AND RECORD THE TEST AND INSPECTION RESULTS IN ACCORDANCE WITH THE REQUIREMENTS OF THE MI
CHECKLIST.
GENERAL CONTRACTOR
THE FOLLOWING RECOMMENDATIONS AND SUGGESTIONS ARE OFFERED TO ENHANCE THE EFFICIENCY OF DELIVERING A MI REPORT.
· IT IS SUGGESTED THAT THE GC PROVIDE A MINIMUM OF 5 BUSINESS DAYS NOTICE, PREFERABLY 10, TO THE EMI INSPECTOR AS TO
WHEN THE SITE WILL BE READY FOR THE MI TO BE CONDUCTED.
· THE GC AND MI INSPECTOR COORDINATE CLOSELY THROUGHOUT THE ENTIRE PROJECT.
· WHEN POSSIBLE, IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE SIMULTANEOUSLY FOR AN GUY WIRE TENSIONING
OR RE-TENSIONING OPERATIONS.
· IT MAY BE BENEFICIAL TO INSTALL ALL TOWER MODIFICATIONS PRIOR TO CONDUCTING THE FOUNDATION INSPECTIONS TO ALLOW
FOUNDATION AND MI INSPECTION(S) TO COMMENCE WITH ONE SITE VISIT
· WHEN POSSIBLE, IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE DURING THE MI TO HAVE ANY DEFICIENCIES CORRECTED DURING THE INITIAL MI. THEREFORE THE GC MAY CHOOSE TO COORDINATE THE MI CAREFULLY TO ENSURE ALL
CONSTRUCTION FACILITIES ARE AT THEIR DISPOSAL WHEN THE MI INSPECTOR IS ON SITE.
RECOMMENDATIONS
IF THE GC AND MI INSPECTOR AGREE TO A DATE ON WHICH THE MI WILL BE CONDUCTED, AND EITHER PARTY CANCELS OR DELAYS, THE OWNER SHALL NOT BE RESPONSIBLE FOR ANY COSTS, FEES, LOST OF DEPOSITS AND/OR OTHER PENALTIES RELATED TO THE CANCELLATION OR DELAY INCURRED BY EITHER PAY FOR ANY TIME (E.G. TRAVEL AND LODGING, COSTS OF KEEPING EQUIPMENT ON-SITE, ETC.) IF THE OWNER CONTACTS DIRECTLY FROM A THIRD PARTY MI, EXCEPTIONS MAY BE MADE IN THE EVENT THAT THE DELAY/CANCELLATION IS CAUSED BY WEATHER OR OTHER CONDITIONS THAT MAY COMPROMISE THE SAFETY OF THE PARTIES INVOLVED.
CANCELLATION OR DELAYS IN SCHEDULED MI
IF THE MODIFICATION INSTALLATION WOULD FAIL THE MI ("FAILED MI"), THE GC SHALL WORK WITH THE OWNER TO COORDINATE A
REMEDIATION PLAN IN ONE OF TWO WAYS
· CORRECT FAILING ISSUES TO COMPLY WITH THE SPECIFICATIONS CONTAINED IN THE ORIGINAL CONTRACT DOCUMENTS AND
COORDINATE A SUPPLEMENT MI.
· OR, WITH THE OWNER'S APPROVAL, THE GC MAY WORK WITH THE EOR TO RE-ANALYIZE THE MODIFICATION / REINFORCEMENT
USING THE AS-BUILT CONDITION.
CORRECTION OF FAILING MI'S
THE OWNER RESERVES THE RIGHT TO CONDUCT A MI VERIFICATION INSPECTION TO VERIFY THE ACCURACY AND COMPLETENESS OF
PREVIOUSLY COMPLETED MI INSPECTION(S).
ALL VERIFICATION INSPECTIONS SHALL BE HELD TO THE SAME SPECIFICATIONS AND REQUIREMENTS IN THE CONTRACT DOCUMENTS.
VERIFICATION INSPECTION MAY BE CONDUCTED BY AN INDEPENDENT INSPECTION FIRM AFTER A MODIFICATION PROJECT IS COMPLETED, AS MARKED BY THE DATE OF AN ACCEPTED "PASSING MI" OR "PASS AS NOTED MI" REPORT FOR THE ORIGINAL PROJECT.
MI VERIFICATION INSPECTIONS
BETWEEN THE GC AND THE MI INSPECTOR THE FOLLOWING PHOTOGRAPHS, AT A MINIMUM, ARE TO BE TAKEN AND INCLUDED IN THE MI
REPORT:
· PRE-CONSTRUCTION GENERAL SITE CONDITION.
· PHOTOGRAPHS DURING THE REINFORCEMENT MODIFICATION CONSTRUCTION / ERECTION AND INSPECTION:
· RAW MATERIALS
· PHOTOS OF ALL CRITICAL DETAILS
· FOUNDATION MODIFICATIONS
· WELD PREPARATION
· BOLT INSTALLATION AND TORQUE
· FINAL INSTALLED CONDITION
· SURFACE COATING REPAIR
· POST CONSTRUCTION PHOTOGRAPHS
· FINAL IN FIELD CONDITION
PHOTO OF ELEVATED MODIFICATIONS TAKEN FROM THE GROUND SHALL BE CONSIDERED INADEQUATE
REQUIRED PHOTOS
PROGRESS LOG
SHEET NUMBER
DRAWING DATE
PROGRESS
ISE JOB #: 17190
P.O. Box 50039 Phoenix, AZ 85076
PHONE: 602-403-8614
www.ise-inc.biz
ISE Incorporated Structural Engineers
KYISSUED TO CLIENT09/28/210
L A
N D
S E
N D
T O
W E
R S
IT
E
G R
A N
D J
U N
C T
IO
N C
O M
E S
A C
O U
N T Y
L A
T
' 2
.5
L O
N G
-1
' 2
.0
January 25, 2022
MGNote Update01/25/221
M O
D
IF
IC
A
T
IO
N
N
O T E
S
N2 0
1. THE FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE AISC SPECIFICATION FOR MANUAL OF STEEL CONTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN, 13th EDITION.
2. UNLESS OTHERWISE NOTED, ALL STRUCTURAL ELEMENTS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:
STRUCTURAL STEEL:
- ANGLE: ASTM A572-50
- PIPE/TUBE: ASTM A53-B-35
- PLATE: ASTM A36 (SELF SUPPORTING AND GUYED TOWERS)
- PLATE: ASTM A572-65 (MONOPOLE)
A. ALL BOLTS, ASTM A325 TYPE I GALVANIZED HIGH STRENGTH BOLTS.
B. ALL U-BOLTS, ASTM A193 GRADE B7
C. ALL NUTS, ASTM A563 CARBON AND ALLOY STEEL NUTS.
D. ALL WASHERS, ASTM F436 HARDENED STEEL WASHERS.
3. ALL CONNECTIONS NOT FULLY DETAILED ON THESE PLANS SHALL BE DETAILED BY THE FABRICATOR IN ACCORDANCE WITH AISC SPECIFICATION FOR MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN, 13th EDITION.
4. HOLES SHALL NOT BE FLAME CUT THRU STEEL UNLESS APPROVED BY THE ENGINEER.
5. HOT-DIP GALVANIZE ALL ITEMS UNLESS OTHERWISE NOTED, AFTER FABRICATION WHERE PRACTIABLE. GALVANIZING: ASTM A123, ASTM, A153/A153M OR ASTM A653, G90, AS APPLICABLE.
6. REPAIR DAMAGED SURFACES WITH GALVANIZING METHOD AND PAINT CONFORMING TO ASTM A780 OR BY APPLICATION OF STICK OR THICK PASTED MATERIAL SPECIFICALLY DESIGNED FOR REPAIR OF GALVANIZING. CLEAN AREAS TO BE REPAIRED AND REMOVE SLAG FROM WELDS. HEAT SURFACES TO WHICH STICK OR PASTE MATERIAL IS APPLIED, WITH A TORCH TO A TEMPERATURE SUFFICIENT TO MELT THE METALLICS IN STICK OR PASTED; SPREAD MOLTEN MATERIAL UNIFORMLY OVER SURFACES TO BE
COATED AND WIPE OFF EXCESS MATERIAL.
7. A NUT LOCKING DEVICE SHALL BE INSTALLED ON ALL PROPOSED AND / OR REPLACED BOLTS.
8. ALL PROPOPSED AND / OR REPLACED BOLTS SHALL BE OF SUFFICIENT LENGTH TO EXCLUDE THE THREADS FORM THE SHEAR
PLANE.
9. ALL PROPOSED AND / OR RELACED BOLTS SHALL BE OF SUFFICIENT LENGTH SUCH THAT TEH END OF THE BOLT BE AT LEAST FLUSH WITH TEH FACE OF THE NUT. IT IS NOT PERMITTED FOR THE BOLT END TO BE BELOW THE FACE OF THE NUT AFTER TIGHTENING IS
COMPLETED.
10. GALVANIZED ASTM A325 BOLTS SHALL NOT BE REUSED.
STRUCTURAL STEEL NOTES
1. TIGHTEN CONNECTION BOLTS BY AISC - "TURN OF THE NUT" METHOD, USING THE CHART BELOW.
BOLT LENGTH UP TO AND INCLUDING FOUR DIA.
2" BOLTS UP TO AND INCLUDING 2.0 INCH LENGTH +1/3 TURN BEYOND SNUG TIGHT
8" BOLTS UP TO AND INCLUDING 2.5 INCH LENGTH +1/3 TURN BEYOND SNUG TIGHT
4" BOLTS UP TO AND INCLUDING 3.0 INCH LENGTH +1/3 TURN BEYOND SNUG TIGHT
8" BOLTS UP TO AND INCLUDING 3.5 INCH LENGTH +1/3 TURN BEYOND SNUG TIGHT
1" BOLTS UP TO AND INCLUDING 4.0 INCH LENGTH +1/3 TURN BEYOND SNUG TIGHT
BOLT LENGTH OVER FOUR DIA. BUT NOT EXCEEDING EIGHT DIA.
2" BOLTS 2.25 TO 4.0 INCH LENGTH +1/2 TURN BEYOND SNUG TIGHT
8" BOLTS 2.75 TO 5.0 INCH LENGTH +1/2 TURN BEYOND SNUG TIGHT
4" BOLTS 3.25 TO 6.0 INCH LENGTH +1/2 TURN BEYOND SNUG TIGHT
8" BOLTS 3.75 TO 7.0 INCH LENGTH +1/2 TURN BEYOND SNUG TIGHT
1" BOLTS 4.25 TO 8.0 INCH LENGTH +1/2 TURN BEYOND SNUG TIGHT
2. CONNECTION BOLTS SUBJECT TO DIRECT TENSION SHALL BE INSTALLED AND TIGHTENED AS PER SECTION 8.2.1 OF THE AISC SPECIFICATION FOR STRUCTURAL JOINTS USING A325 OR A490 BOLTS, LOCATED IN THE AISC MANUAL OF STEEL CONSTRUCTION.
THE INSTALLATION PROCEDURE IS PARAPHRASED AS FOLLOWS:
3. FASTENERS SHALL BE INSTALLED IN PROPERLY ALIGNED HOLES AND TIGHTENED BY ON OF THE METHODS DESCRIBED IN
SUBSECTION 8.2.1 THROUGH 8.2.4
8.2.1 TURN-OF-THE-NUT TIGHTENING
BOLTS SHALL BE INSTALLED IN ALL HOLES OF THE CONNECTION AND BROUGHT TO A SNUG TIGHT CONDITION AS DEFINED IN SECTION 8.1, UNTIL ALL THE BOLTS ARE SIMULTANEOUSLY SNUG TIGHT AND THE CONNECTION IS FULLY COMPACTED.
FOLLOWING THIS INITIAL OPERATION ALL BOLTS IN THE CONNECTION SHALL TIGHTENED FURTHER BY THE APPLICABLE AMOUNT OF ROTATION SPECIFIED ABOVE. DURING THE TIGHTENING OPERATION THERE SHALL BE NO ROTATION OF THE PART NOT TURNED BY THE WRENCH. TIGHTENING SHALL PROGRESS SYSTEMATICALLY FROM THE MOST RIGID PART OF THE JOINT IN A MANNER
THAT WILL MINIMIZE RELAXATION OF PREVIOUSLY PRETENSIONED BOLTS.
4. ALL OTHER BOLTED CONNECTIONS SHALL BE BROUGHT TO A SNUG TIGHT CONDITION AS DEFINED IN SECTION 8.1 OF THE
SPECIFICATION.
BOLT TIGHTENING PROCEDURE
NOMINAL HOLE DIMENSIONS
BOLT DIA. STANDARD HOLE SHORT SLOT
16 X 11
16 X 78
16 X 1
16 X 11
1 11 16 11
16 X 15
DIMENSIONS GIVEN IN INCHES
BOLT EDGE AND SPACING
BOLT DIA. MIN. EDGE SPACING
8 11
8 11
8 17
4 11
4 21
8 11
2 25
1 13 4 3
DIMENSIONS GIVEN IN INCHES
MIN.
EDGE DIMENSIONS IN INCHES
SPACING
ALLOWABLE ANGLE COPE
1.5 X L
MAX.
COPED PORTION OF ANGLE
DO NOT COPE BEYOND THIS LINE, TYP.
COPED PORTION OF ANGLE
WORKABLE GAGES
LEG 4" 31
2" 3" 21
2" 2" 13 4"
G 21 2" 2" 13
4" 13 8" 11
8" 1
G
- WORKABLE GAGES GIVEN IN INCHES
- MATCH EXISTING WHEN APPLICABLE
1. ALL REFERENCE TO THE OWNER IN THESE DOCUMENTS SHALL BE CONSIDERED NTUA OR ITS DESIGNATED REPRESENTATIVE.
2. ALL WORK PRESENTED ON THESE DRAWINGS MUST BE COMPLETED BY THE CONTRACTOR UNLESS NOTED OTHERWISE. THE CONTRACTOR MUST HAVE CONSIDERABLE EXPERIENCE IN PERFORMANCE OF WORK SIMILAR TO THAT DESCRIBED HEREIN. BY ACCEPTANCE OF THIS ASSIGNMENT, THE CONTRACTOR IS ATTESTING THAT HE DOES HAVE SUFFICIENT EXPERIENCE AND ABILITY, THAT HE IS KNOWLEDGEABLE OF THE WORK TO BE PERFORMED AND THAT HE IS PROPERLY LICENSED AND REGISTERED TO DO THIS
WORK IN THE APPLICABLE JURISDICTION.
3. WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE, 2012 EDITION.
4. UNLESS SHOWN OR NOTED OTHERWISE ON THE CONTRACT DRAWINGS, OR IN THE SPECIFICATIONS, THE FOLLOWING NOTES SHALL APPLY TO THE MATERIALS LISTED HEREIN, AND TO THE PROCEDURES TO BE USED ON THIS PROJECT.
5. ALL HARDWARE ASSEMBLY MANUFACTURE'S INSTRUCTIONS SHALL BE FOLLOWED EXACTLY AND SHALL SUPERSEDE ANY
CONFLICTING NOTES ENCLOSED HEREIN.
6. IT IS THE CONTRACTOR'S RESPONSIBLY TO DETERMINE ERECTION PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE STRUCTURE AND IT'S COMPONENT PARTS DURING ERECTION AND / OR FIELD MODIFICATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE ADDITION OF TEMPORARY BRACING, GUYS OR TIE DOWNS THAT MAY BE NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR AFTER THE COMPLETION OF THE PROJECT.
7. ALL DIMENSIONS, ELEVATIONS, AND EXISTING CONDITIONS SHOWN ON THE DRAWINGS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO BEGINNING ANY MATERIALS ORDERING, FABRICATION OR CONSTRUCTION WORK ON THIS PROJECT.
CONTRACTOR SHALL NOT SCALE CONTRACT DRAWINGS IN LIEU OF FIELD VERIFICATIONS. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND THE OWNER'S ENGINEER. THE DISCREPANCIES MUST BE RESOLVED BEFORE THE CONTRACTOR IS TO PROCEED WITH THE WORK. THE CONTRACTOR DOCUMENTS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES. OBSERVATION VISITS TO THE SITE BY THE OWNER AND / OR ENGINEER SHALL NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR PROCEDURES.
8. ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW AND OF GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY AND ALL SUBSTITUTIONS MUST BE PROPERLY APPROVED AND AUTHORIZED IN WRITING BY THE OWNER AND ENGINEER PRIOR TO INSTALLATION. THE CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF THE MATERIALS AND EQUIPMENT BEING SUBSTITUTED.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THIS PROJECT AND RELATED WORK COMPLIES WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL SAFETY CODES AND REGULATIONS GOVERNING THIS
WORK.
10. ACCESS TO THE PROPOSED WORK SITE MAY BE RESTRICTED. THE CONTRACTOR SHALL COORDINATE INTEND CONSTRUCTION ACTIVITY, INCLUDING WORK SCHEDULE AND MATERIAL ACCESS, WITH THE RESIDENT LEASING AGENT FOR APPROVAL.
11. ALL PERMITS THAT MUST BE OBTAINED ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR WILL BE RESPONSIBLE
FOR ABIDING BY ALL CONDITIONS AND REQUIREMENTS OF THE PERMITS.
12. IF APPLICABLE, ALL CONCRETE WORK SHALL COMPLY TO LOCAL CODES AND THE ACI 318-05, " BUILDING REQUIREMENTS FOR
STRUCTURAL CONCRETE".
13. 24 HOURS PRIOR TO THE BEGINNING OF ANY CONSTRUCTION, THE CONTRACTOR MUST NOTIFY THE APPLICABLE JURISDICTIONAL
(STATE, COUNTY OR CITY) ENGINEER.
14. ALL TOWER DIMENSIONS SHALL BE VERIFIED WITH THE PLANS (LATEST REVISION) PRIOR TO COMMENCING CONSTRUCTION. NOTIFY THE ENGINEER IMMEDIATELY IF ANY DISCREPANCIES ARE DISCOVERED. THE OWNER SHALL HAVE A SET OF APPROVED PLANS AVAILABLE AT THE SITE AT ALL TIMES WHILE WORK IS BEING PERFORMED. A DESIGNATED RESPONSIBLE EMPLOYEE SHALL BE
AVAILABLE FOR CONTACT BY GOVERNING AGENCY INSPECTORS.
GENERAL NOTES
PROGRESS LOG
SHEET NUMBER
DRAWING DATE
PROGRESS
ISE JOB #: 17190
P.O. Box 50039 Phoenix, AZ 85076
PHONE: 602-403-8614
www.ise-inc.biz
ISE Incorporated Structural Engineers
KYISSUED TO CLIENT09/28/210
L A
N D
S E
N D
T O
W E
R S
IT
E
G R
A N
D J
U N
C T
IO
N C
O M
E S
A C
O U
N T Y
L A
T
' 2
.5
L O
N G
-1
' 2
.0
January 25, 2022
MGNote Update01/25/221
S T R
U C
T U
R A
L N
O T E
S
S1 0
PROGRESS LOG
SHEET NUMBER
DRAWING DATE
PROGRESS
ISE JOB #: 17190
P.O. Box 50039 Phoenix, AZ 85076
PHONE: 602-403-8614
www.ise-inc.biz
ISE Incorporated Structural Engineers
KYISSUED TO CLIENT09/28/210
L A
N D
S E
N D
T O
W E
R S
IT
E
G R
A N
D J
U N
C T
IO
N C
O M
E S
A C
O U
N T Y
L A
T
' 2
.5
L O
N G
-1
' 2
.0
January 25, 2022
MGNote Update01/25/221
F O
U N
D A
T
IO
N M
O D
IF
IC
A T
IO
N D
E T A
IL
S
21'-6"
'-0
#8 REBAR, 22" LONG, (3) ROWS
EMBED 6" INTO (E) FOUNDATION
SET W/ HILTI HIT-RE500V3
1'- 6"
1'- 6"
(N) CONCRETE MAT
13'-0"
TOWER CENTER
(E) 5'-0" SQUARE
CONCRETE PIER FOUNDATION
(TYP OF 3)
(22) #8 REBAR
EQUALLY SPACED EACH WAY
TOP & BOTTOM
21'-6"
5'-0"
3" CLR
8"
8"
3'- 0"
FINISH GRADE
13'-0"
6" 1'-4"
6"
1'-
2"
(22) #8 REBAR
EQUALLY SPACED EACH WAY
TOP & BOTTOM
(N) CONCRETE MAT
#5 STIRRUPS AT 16" O.C
AROUND PERIMETER
(EX) FOUNDATION
#8 REBAR, 22" LONG, (3) ROWS
EMBED 6" INTO (EX) FOUNDATION
AT TOP, MIDDLE & BOTTOM OF MAT
(DO NOT DRILL THROUGH REBAR)
EPOXY SET W/ HILTI HIT-RE500V3
3" C
LR
1. FOUNDATION NOTES:
2. THE GEOTECHNICAL ENGINEER (OR THE APPROPRIATE INSPECTOR) SHALL
INSPECT THE EXCAVATION PRIOR TO PLACING REINFORCING STEEL OR
FORMS. THE GEOTECHNICAL ENGINEER (OR INSPECTOR) SHALL PROVIDE A
NOTICE OF INSPECTION FOR THE BUILDING INSPECTOR FOR REVIEW AND
RECORDS PURPOSE.
3. THE CONTRACTOR SHALL DETERMINE THE MEANS AND METHODS TO
SUPPORT THE EXCAVATION DURING CONSTRUCTION. REFER TO THE
GEOTECHNICAL REPORT FOR RECOMMENDATIONS.
4. THE CONTRACTOR SHALL READ THE GEOTECHNICAL REPORT AND SHALL
CONSULT THE GEOTECHNICAL ENGINEER AS NECESSARY PRIOR TO
CONSTRUCTION.
5. FOUNDATION DESIGN PER GEOTECHNICAL REPORT:
PREPARED BY:
PROJECT NO.:
DATE:
6. ALL FOUNDATION CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE
STRENGTH F'c= 4000 PSI AT 28 DAYS. CONCRETE MIX SHALL BE DESIGNED
BY AN APPROVED LABORATORY. CONCRETE SHALL HAVE A MAXIMUM
WATER/CEMENT RATIO OF 0.45. ALL CONCRETE CONSTRUCTION SHALL BE
IN ACCORDANCE WITH ACI 318. “THE BUILDING CODE REQUIREMENTS FOR
REINFORCED CONCRETE”, LATEST EDITION. CEMENT SHALL BE TYPE I/II,
CONFORMING TO ASTM C-150. ALL AGGREGATE USED IN THE CONCRETE
SHALL CONFORM TO ASTM C-33. MAXIMUM AGGREGATE SIZE TO BE 1 1/2”.
SLUMP 4" - 6".
7. 4% to 6% AIR ENTRAINMENT.
8. ALL REINFORCING STEEL SHALL CONFORM TO ASTM A615. ALL
REINFORCING SHALL BE SHALL BE GRADE 60. THE PLACEMENT OF ALL
REINFORCEMENT SHALL CONFORM TO ACI 315, “MANUAL OF STANDARD
PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES”, LATEST
EDITION, UNLESS OTHERWISE DETAILED ON THIS SHEET.
9. ESTIMATED CONCRETE VOLUME =
PIER: EXISTING
MAT : 43.1 CY (NOT INCLUDING WASTE)
10. THE FOUNDATION HAS BEEN DESIGNED TO RESIST THE FOLLOWING
FACTORED LOADS PER LEG:
11. SPECIAL INSPECTION REQUIRED PER TABLE
“SUMMARY OF SPECIAL INSPECTION"
12. EPOXY SYSTEM: HILTI RE500V3. INSTALL DOWELS PER MFG
RECOMMENDATIONS.
MAX TENSION FORCE : 69 KIPS W/ MIN 25" EMBEDMENT
MAX SHEAR FORCE : 148.75 KIPS
PROTEX
11886
AUGUST 11, 2020
CONSTRUCTION NOTES:
1. CLEAN EXISTING EXPOSED CONCRETE SURFACE AND
APPLY SIKKA OR SIMILAR BONDING AGENT TO SURFACE
OF EXISTING PIER PRIOR TO CASTING NEW CONCRETE.
ROUGHEN SURFACE TO 14" AMPLITUDE.
2. DO NOT DRILL THROUGH EXISTING REBAR. STOP DRILLING
IMMEDIATELY IF DRILL BIT COMES IN CONTACT WITH
REBAR. SHIFT HOLE UP OR DOWN AS NECESSARY TO
INSTALL DOWEL.
(EX) FOUNDATION
COMPRESSION = 69 KIPS
UPLIFT = 59 KIPS
SHEAR = 9 KIPS
File details come from the government source that posted it. Updated .