Attachment 2 Specifications Solicitation 1232SA26Q0722.pdf

PDF 181 KB Posted

Attached to
#2 or Better USDA Grade Yellow Feed Corn Federal contract opportunity
Solicitation number
1232SA26Q0722
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a product specifications document for a federal procurement of yellow feed corn by the USDA Agricultural Research Service, U.S. Sheep Experiment Station.

The procurement requires delivery of 240 tons total of #2 or better USDA Grade yellow corn in two separate shipments: 120 tons to the Headquarters facility near Dubois, Idaho and 120 tons to the Mud Lake Feedlot near Mud Lake, Idaho, with both deliveries required by August 14, 2026. The corn must not exceed 14% moisture and shall be free of contaminants including insects, insect damage, mold, grain rot, and rot residue, with minimal dust, cracked kernels, and foreign material per USDA Standards § 810.404. Rejected loads become the contractor's responsibility for removal. Unloading must utilize bottom dump agricultural hoppers with an estimated unloading time of 0.5 to 1 hour per truckload. Deliveries are restricted to Monday through Thursday between 7:00 am and 2:30 pm, with no Friday deliveries permitted. A minimum of 72 hours' notice is required prior to delivery. Each delivery must be accompanied by a weigh slip from a certified scale showing tare and gross weight. The contractor is responsible for ensuring quantity does not exceed the ordered amount, though a variance of up to 3% less is acceptable. The Mud Lake location requires prior notice to unlock entrance gates and arrange unloading assistance.

View the file

Other files for this federal contract opportunity

Other files attached to #2 or Better USDA Grade Yellow Feed Corn, newest first.
File Type Posted
Attachment 1 Terms and Conditions Solicitation 1232SA26Q0722.docx DOCX document
Attachment 3 Price Schedule of Line Items Solicitation 1232SA26Q0722.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026 YELLOW FEED CORN SPECIFICATIONS/USDA ARS US SHEEP STATION

The USDA, Agricultural Research Service, U.S. Sheep Experiment Station has a need to purchase a total of 120 tons of #2 or better yellow corn delivered to the Headquarters facility, Dubois, Idaho and 120 tons of #2 or better yellow corn delivered to the Mud Lake facility.

Below are specifications for Corn and delivery at both locations:

#2 or better USDA Grade yellow corn with the exception must not exceed 14% moisture:

Corn shall be free of contaminants such as insects, insect damage, mold/grain rot, and rot residue. Corn shall contain minimal dust, cracked kernels, and foreign material per USDA Standards § 810.404. Corn may be rejected on site if these criteria are not met. The contractor is responsible for removing rejected loads.

Unloading of corn shall be done by using bottom dump Ag hoppers (no lifting required, no commodity hoppers). Unloading time is estimated between 0.5 and 1 hour per truckload.

Delivery at Dubois will be one time:

120 tons to Dubois delivered no later than August 14, 2026

Delivery at the Mud Lake Feedlot will be one time:

130 tons to Mud Lake delivered no later than August 14, 2026

A minimum of 72 hours’ notice is necessary for delivery of corn.

Delivery Hours shall be: 7:00 am – 2:30 pm. No Deliveries after 2:30 PM. Monday – Thursday No Deliveries on Fridays

Delivery Location: 120 tons of corn delivered to the Headquarters facility, located 4 miles north of Dubois, ID on Interstate 15, take Exit 172, and turn east for 2 miles

Delivery Location: 120 tons of corn delivered to the Mud Lake Feedlot, located 2 miles west of Mud Lake, Idaho on Highway 33. The entrance gates are locked so prior notice is required to have someone unlock the gates and assist with unloading.

A weigh slip from a certified scale must accompany each delivery. Weigh slips must show tare and gross weight.

Quantity variance may be up to 3% less than the amount ordered. The contractor is responsible for removing any amounts that exceed the amount ordered.

File details come from the government source that posted it. Updated .