Attachment_2_-_SOW_-_YOSE_Transfer_Switches.pdf

PDF 209 KB Posted

Attached to
Transfer Switches - Yosemite NP Federal contract opportunity
Solicitation number
140P8523Q0002
Issued by
Department of the Interior National Park Service

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E X P E R I E N C E Y O U R A M E R I C A The National Park Service cares for special places saved by the American people so that all may experience our heritage.

Statement of Work

Objective

Yosemite National Park has a requirement for installing generator interlock kits and inlet receptacles on 15 required occupant housing units in the Mather and Wawona Districts of the park. This will allow the residents, who are required to reside in the park, the ability to have access to power for selected circuits in their homes in the event of a power outage.

Background

The required occupants in the Mather and the Wawona Districts of the park, must live and work in the park as a requirement of their employment. They do not have the ability to engage alternate housing outside of the park. Adding a generator interlock, 30-amp 2 pole breaker, and inlet receptacle would allow these residents to remain in their homes during power outages and continue to perform their duties, by utilizing a portable generator (5500 – 6500 watts) to safely bring power to selected circuits (lights outlets, refrigerator(s), and water heater) in their residences.

Scope

• The contractor shall be responsible to verify location information

• The contractor shall provide all labor, equipment, and materials to accomplish the work

• The contractor shall perform all work to meet the standards outlined within the NEC requirements and the Pacific, Gas, and Electric (PG&E) Greenbook for generators and standby equipment

• The contractor shall install all electrical wiring and equipment necessary to deliver power to the building during outages to each of the listed 15 housing units

• The contractor shall make any repairs to the interior or exterior surfaces affected during the installation, exterior surfaces will be weathertight and interior surfaces will be sealed from any infiltration of pests, etc.

• The inlet receptacles shall be installed on the exterior of the residences

• The contractor shall not disconnect power to the residence without 48 hours prior notice to the

NPS, who shall notify the occupant of the planned outage

• The contractor shall submit a project schedule at least five (5) business days prior to the on-site work. The schedule shall be in writing and clearly show the planned dates of any power outage, so that the NPS can provide 48 hours prior notification to the residents affected by the work

• The contractor shall coordinate any power outages with PG&E and the NPS

• The outage duration shall not be more than ten (10) hours

• The contractor shall remove associated debris and dispose of it in a responsible manner not within Yosemite National Park or its refuse containers

• The National Park Service will perform periodic inspections, provide a punch list as necessary, and perform a final acceptance inspection

Location Information

Building # Address System Requirement 6141 9002 Dogwood Drive - A Install a generator interlock kit for Cutler Hammer panel, 30-amp 2 pole breaker, and inlet receptacle.

6141 9002 Dogwood Drive - B Install a generator interlock kit for Cutler Hammer panel, 30-amp 2 pole breaker, and inlet receptacle.

6140 9001 Dogwood Drive - A Install a generator interlock kit for Cutler Hammer panel, Yosemite National Park

Carrie Toepper Facility Operations Specialist Buildings and Grounds Phone: 209-379-1089

National Park Service U.S. Department of the Interior

The National Park Service cares for special places saved by the American people so that all may experience our heritage.

30-amp 2 pole breaker, and inlet receptacle.

6140 9001 Dogwood Drive - B Install a generator interlock kit for Cutler Hammer panel, 30-amp 2 pole breaker, and inlet receptacle.

6114 9005 Meadowview Lane - A Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building.

6114 9005 Meadowview Lane - B Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building.

6114 9005 Meadowview Lane - C Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building.

6114 9005 Meadowview Lane - D Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building.

6115 9000 Meadowview Lane Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building.

6117 9004 Meadowview Lane Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building.

4162 8034 Larkspur Lane Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building. Verify proper grounding of electrical panel.

4185 2636 English Lane Replace Cutler Hammer panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building. Verify proper grounding of electrical panel.

4016 8054 Chilnualna Falls Road Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building. Verify proper grounding of electrical panel.

4152 7932 Chilnualna Falls Road - A Replace Zinsco panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building. Verify proper grounding of electrical panel.

4152 7932 Chilnualna Falls Road - B Replace GE panel with new 100-amp meter main and distribution with a generator interlock kit, 30-amp, 2 pole breaker, and inlet receptacle. Inlet receptacle must be installed on the exterior of the building. Verify proper grounding of electrical panel.

• Location maps attached

Period of Performance

The anticipated period of performance is February 6, 2023 through April 28, 2023.

Additional Information

The National Park Service cares for special places saved by the American people so that all may experience our heritage.

HAULING RESTRICTIONS: Vehicles over 45 feet are prohibited and 1-way controlled traffic for all other vehicles 20 miles East of Mariposa (Mariposa County) 24 hours per day, seven days per week due to rockslide repairs.

ON-SITE WORK HOURS: Work shall be performed during the normal business hours of 8:00am to 5:00pm, Monday through Friday, except when otherwise indicated. No work is to be performed on National Holidays.

BEAR/ANIMAL SAFETY: Bears and other animals are active in Yosemite and surrounding areas. It is necessary for all visitors, employees, and contractors to practice bear and animal safety. Food items are not to be left in work trucks or anywhere else. The NPS provides bear boxes in campgrounds for food storage. Bear incidents are a ticket able offense in Yosemite.