Attachment 2 - Site 1 and 2 Robert Frost Project Maps.pdf
PDF 103 KB Posted
- Solicitation number
- 12444325Q0033
About this file
This document is a site map for the Robert Frost Interpretive Trail, detailing specific mowing and maintenance requirements for the recreation area. The map illustrates the layout of the trail system, including a parking lot, boardwalk, bridges, and trail sections (Wayside Connector Trail, Robert Frost Upland Trail), located near Vermont State Route 125 between Middlebury and Hancock.
The mowing specifications outline precise areas for maintenance, including: the parking lot island, areas around the parking lot and toilet, around signs, a 2-foot wide swath along trail edges, and the southeast section of the boardwalk leading to a river bridge. The map is part of a federal contract opportunity (Solicitation Number: 12444325Q0033) for the Green Mountain National Forest, specifically for Rochester and Middlebury District recreation site mowing, under the Department of Agriculture Forest Service Eastern Region.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site: Robert Frost Interpretive Trail
Mow/weed whip dotted area:
• Parking lot island
• Around parking lot
• Around toilet and signs
• 2’ wide swath along edge of highlighted sections of trail
• Around southeast section of boardwalk that leads to bridge over river
Toilet
Boardwalk
Parking Lot Island
To Hancock VT State Route 125 To Middlebury
Parking Lot
Robert Frost Wayside
Bridge
Bridge
South Branch Middlebury River
Robert Frost Upland Trail
Wayside Connector Trail
File details come from the government source that posted it. Updated .