This document provides preservation, packaging, packing, marking and shipping specifications for solicitation 70Z08024Q13001B00 issued by the Department of Homeland Security United States Coast Guard Surface Forces Logistics Center for the purchase of shaft seal systems and components parts. Items must be preserved for long-term storage up to two years according to MIL-STD-2073 and individually packaged and packed in wooden boxes or crates per MIL-STD-2073-1E Method 10 to prevent damage during shipping and handling. Markings and barcodes per MIL-STD-129R and MIL-STD-2073-1E are required on the outside of boxes. Shipments must be delivered to the USCG Surface Forces Logistics Center Receiving Room at the specified address in Baltimore, Maryland during normal business hours. Deviations from these preservation, packaging, packing, marking and shipping requirements require prior approval from the USCG Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA Shaft Seals and Components Redacted.pdf | ||
| ATTACHMENT 1 - SCHEDULE OF PRICES.xls | XLS spreadsheet | |
| S1.12a Combined Synopsis Sol 70Z08024Q13001B00 RFQ.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2 – SHIPPING AND PP&M SPECIFICATION
FOR SOLICITATION 70Z08024Q13001B00
Preservation, Packaging, Packing, Marking, Bar-coding and Shipping Specification
Items will not be immediately installed and shall be preserved as appropriate per MIL-STD-2073 for long term storage up to two years.
Each item shall be individually packaged and packed as appropriate in accordance with MIL-STD-2073-1E Method 10, cushioned or secured to prevent damage from movement or external impacts in an appropriately sized ASTM-D6251 Type III, Class 1 Wood-Cleated Panelboard Shipping Box or ASTM-D6880 Class 2 Heavy Duty screwed Wooden Box. Any box or crate exceeding 50 lbs. shall be skid mounted to allow for forklift use. Take into consideration during crate construction items will be stacked, mishandled and/or abused during shipping and handling in order to prevent packaging and packing failure.
Marking shall be IAW MIL-STD-129R. All markings shall be on the side of the wooden crate or box facing the forklift operator stenciled in black block lettering on a painted white background. Example as follows:
| NSN | 5330-01-381-3026 | ||||
| ITEM NAME | Part Kit, Seal | ||||
| PART NUMBER | 662531 | ||||
| DELIVERY ORDER NUMBER | TBD | ||||
| CONTRACT NUMBER | TBD | ||||
| QTY / U/I | 1 KIT | ||||
| CONDITION | A |
DATE OF MANUFACTURE
U.S. COAST GUARD SFLC MATERIAL
U.S. Coast Guard (USCG) requires bar coding of the NSN, IAW MIL-STD-129R, see paragraph 5.4.1.2.1, page 51 of MIL-STD-129R for identification linear (Code 39) and 2D (PDF417) bar code markings and locations. The Bar Code Label can be applied separately or as part of the marking.
Unless otherwise directed, the Contractor shall ship and deliver the parts and components to the government address specified below. Provide timely shipping information to the Contracting Officer including the name of the shipping company, date of shipment leaving Contractor’s facility, expected arrival date and time at the government facility and shipment tracking number. No shipment shall arrive outside of government normal business hours as determined by the Contracting Officer.
USCG Surface Forces Logistics Center
| Receiving Room - Bldg. 88 |
| 2401 Hawkins Point RD |
| Baltimore, MD 21226 |
Deviations from the above requirements shall be approved by the USCG Contracting Officer prior to shipping.
All items are inspected when delivered to the USCG Warehouse. Failure to meet the requirements for preservation, packaging, packing, marking and bar-coding (PP&M) will result in the item(s) being rejected and possibly returned to the vendor. This will delay payment. Any questions concerning the PP&M requirements shall be addressed with the Contracting Officer prior to contract award.