| File | Type | Posted |
|---|---|---|
| ATTACHMENT 1 - Terms and Conditions.pdf | ||
| ATTACHMENT 3 - SOW FSR.pdf | ||
| ATTACHMENT 5 - Redacted JA.pdf | ||
| ATTACHMENT 4 - SOW Sustainment Engineering Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
| SCHEDULE OF SERVICES | |
| BASE YEAR | |
| Date of Award - One Calendar Year | |
| CLIN | DESCRIPTION |
| 0001 | Provide sustaining engineering services for the base year and all option years in accordance with the Statement of Work on an as required basis utilizing the fixed price hourly rates specified below. Individual fixed-price task orders will be issued against this contract based on negotiated and agreed work statement using the labor rates identified below for contractor peronnel effort. The estimated hours includes services at both Airbus Defense and Space, Inc (US) and Spain locations. |
| Airbus (US) Manhour Rate | Airbus (Spain) Manhour Rate | |||
| Labor Category | Hours | Rate | Hours | Rate |
| Program Manager (ADSI) | 30 | $ - 0 | 10 | $ - 0 |
| Technical Manager | 20 | $ - 0 | 0 | $ - 0 |
| Technical Representative | 24 | $ - 0 | 24 | $ - 0 |
| Field Representative | 16 | $ - 0 | 0 | $ - 0 |
| Spares Coordinator | 16 | $ - 0 | 0 | $ - 0 |
| Structural Engineer | 50 | $ - 0 | 200 | $ - 0 |
| Engineer | 25 | $ - 0 | 175 | $ - 0 |
| Engineer Specialist | 25 | $ - 0 | 75 | $ - 0 |
| Technical Information Manager | 0 | $ - 0 | 16 | $ - 0 |
| Technical Writer | 0 | $ - 0 | 24 | $ - 0 |
| Technical Illustrator | 0 | $ - 0 | 20 | $ - 0 |
| Airframe Structural Mechanic | 80 | $ - 0 | 0 | $ - 0 |
| Avionics Specialist | 80 | $ - 0 | 0 | $ - 0 |
| Nondestructive Inspection Technician | 40 | $ - 0 | 0 | $ - 0 |
| 0002 | Field Service Representative (FSR) | 234 | $ - 0 |
| Monthly Activity Report and Certificate of Service | (MAN DAYS) |
0003 Estimated Travel To Be Determined
0004 Engineer Drawings & Associated Lists Not Separately Priced
0005 Material including but not limited to parts, tool and tool rental, fuel, metallugical and photo lab materials associated with CLINs 0001 and 0003 (travel) shall not exceed $TBD and will be applied toward the established ceiling amount.
0006 Additional Labor Classifications and hourly rates required for any specific task order shall be proposed in accordance with Section 8.9 of the Sustainment Engineering Statement of Work and added to the contract as CLIN 0004.
0007 Progress Reports (As required on individual orders) Not Separately Priced
&"Times New Roman,Bold"&12ATTACHMENT 2
&"Times New Roman,Regular"&12&P
OPT1
| SCHEDULE OF SERVICES | |
| OPTION YEAR 1 | |
| End of Base Year - One Calendar Year | |
| CLIN | DESCRIPTION |
| 1001 | Provide sustaining engineering services for the base year and all option years in accordance with the Statement of Work on an as required basis utilizing the fixed price hourly rates specified below. Individual fixed-price task orders will be issued against this contract based on negotiated and agreed work statement using the labor rates identified below for contractor peronnel effort. The estimated hours includes services at both Airbus Defense and Space, Inc (US) and Spain locations. |
| Airbus (US) Manhour Rate | Airbus (Spain) Manhour Rate | |||
| Labor Category | Hours | Rate | Hours | Rate |
| Program Manager (ADSI) | 30 | $ - 0 | 10 | $ - 0 |
| Technical Manager | 20 | $ - 0 | 0 | $ - 0 |
| Technical Representative | 24 | $ - 0 | 24 | $ - 0 |
| Field Representative | 16 | $ - 0 | 0 | $ - 0 |
| Spares Coordinator | 16 | $ - 0 | 0 | $ - 0 |
| Structural Engineer | 50 | $ - 0 | 200 | $ - 0 |
| Engineer | 25 | $ - 0 | 175 | $ - 0 |
| Engineer Specialist | 25 | $ - 0 | 75 | $ - 0 |
| Technical Information Manager | 0 | $ - 0 | 16 | $ - 0 |
| Technical Writer | 0 | $ - 0 | 24 | $ - 0 |
| Technical Illustrator | 0 | $ - 0 | 20 | $ - 0 |
| Airframe Structural Mechanic | 80 | $ - 0 | 0 | $ - 0 |
| Avionics Specialist | 80 | $ - 0 | 0 | $ - 0 |
| Nondestructive Inspection Technician | 40 | $ - 0 | 0 | $ - 0 |
| 1002 | Field Service Representative (FSR) | 234 | $ - 0 |
| Monthly Activity Report and Certificate of Service | (MAN DAYS) |
1003 Estimated Travel To Be Determined
1004 Engineer Drawings & Associated Lists Not Separately Priced
1005 Material including but not limited to parts, tool and tool rental, fuel, metallugical and photo lab materials associated with CLINs 1001 and 1003 (travel) shall not exceed $TBD and will be applied toward the established ceiling amount.
1006 Additional Labor Classifications and hourly rates required for any specific task order shall be proposed in accordance with Section 8.9 of the Sustainment Engineering Statement of Work and added to the contract as CLIN 1004.
1007 Progress Reports (As required on individual orders) Not Separately Priced
&"Times New Roman,Bold"&12ATTACHMENT 2
&"Times New Roman,Regular"&12&P
OPT2
| SCHEDULE OF SERVICES | |
| OPTION YEAR 2 | |
| End of Year 1 - One Calendar Year | |
| CLIN | DESCRIPTION |
| 2001 | Provide sustaining engineering services for the base year and all option years in accordance with the Statement of Work on an as required basis utilizing the fixed price hourly rates specified below. Individual fixed-price task orders will be issued against this contract based on negotiated and agreed work statement using the labor rates identified below for contractor peronnel effort. The estimated hours includes services at both Airbus Defense and Space, Inc (US) and Spain locations. |
| Airbus (US) Manhour Rate | Airbus (Spain) Manhour Rate | |||
| Labor Category | Hours | Rate | Hours | Rate |
| Program Manager (ADSI) | 30 | $ - 0 | 10 | $ - 0 |
| Technical Manager | 20 | $ - 0 | 0 | $ - 0 |
| Technical Representative | 24 | $ - 0 | 24 | $ - 0 |
| Field Representative | 16 | $ - 0 | 0 | $ - 0 |
| Spares Coordinator | 16 | $ - 0 | 0 | $ - 0 |
| Structural Engineer | 50 | $ - 0 | 200 | $ - 0 |
| Engineer | 25 | $ - 0 | 175 | $ - 0 |
| Engineer Specialist | 25 | $ - 0 | 75 | $ - 0 |
| Technical Information Manager | 0 | $ - 0 | 16 | $ - 0 |
| Technical Writer | 0 | $ - 0 | 24 | $ - 0 |
| Technical Illustrator | 0 | $ - 0 | 20 | $ - 0 |
| Airframe Structural Mechanic | 80 | $ - 0 | 0 | $ - 0 |
| Avionics Specialist | 80 | $ - 0 | 0 | $ - 0 |
| Nondestructive Inspection Technician | 40 | $ - 0 | 0 | $ - 0 |
| 2002 | Field Service Representative (FSR) | 234 | $ - 0 |
| Monthly Activity Report and Certificate of Service | (MAN DAYS) |
2003 Estimated Travel To Be Determined
2004 Engineer Drawings & Associated Lists Not Separately Priced
2005 Material including but not limited to parts, tool and tool rental, fuel, metallugical and photo lab materials associated with CLINs 2001 and 2003 (travel) shall not exceed $TBD and will be applied toward the established ceiling amount.
2006 Additional Labor Classifications and hourly rates required for any specific task order shall be proposed in accordance with Section 8.9 of the Sustainment Engineering Statement of Work and added to the contract as CLIN 2004.
2007 Progress Reports (As required on individual orders) Not Separately Priced
&"Times New Roman,Bold"&12ATTACHMENT 2
&"Times New Roman,Regular"&12&P
OPT3
| SCHEDULE OF SERVICES | |
| OPTION YEAR 3 | |
| End of Year 2 - One Calendar Year | |
| CLIN | DESCRIPTION |
| 3001 | Provide sustaining engineering services for the base year and all option years in accordance with the Statement of Work on an as required basis utilizing the fixed price hourly rates specified below. Individual fixed-price task orders will be issued against this contract based on negotiated and agreed work statement using the labor rates identified below for contractor peronnel effort. The estimated hours includes services at both Airbus Defense and Space, Inc (US) and Spain locations. |
| Airbus (US) Manhour Rate | Airbus (Spain) Manhour Rate | |||
| Labor Category | Hours | Rate | Hours | Rate |
| Program Manager (ADSI) | 30 | $ - 0 | 10 | $ - 0 |
| Technical Manager | 20 | $ - 0 | 0 | $ - 0 |
| Technical Representative | 24 | $ - 0 | 24 | $ - 0 |
| Field Representative | 16 | $ - 0 | 0 | $ - 0 |
| Spares Coordinator | 16 | $ - 0 | 0 | $ - 0 |
| Structural Engineer | 50 | $ - 0 | 200 | $ - 0 |
| Engineer | 25 | $ - 0 | 175 | $ - 0 |
| Engineer Specialist | 25 | $ - 0 | 75 | $ - 0 |
| Technical Information Manager | 0 | $ - 0 | 16 | $ - 0 |
| Technical Writer | 0 | $ - 0 | 24 | $ - 0 |
| Technical Illustrator | 0 | $ - 0 | 20 | $ - 0 |
| Airframe Structural Mechanic | 80 | $ - 0 | 0 | $ - 0 |
| Avionics Specialist | 80 | $ - 0 | 0 | $ - 0 |
| Nondestructive Inspection Technician | 40 | $ - 0 | 0 | $ - 0 |
| 3002 | Field Service Representative (FSR) | 234 | $ - 0 |
| Monthly Activity Report and Certificate of Service | (MAN DAYS) |
3003 Estimated Travel To Be Determined
3004 Engineer Drawings & Associated Lists Not Separately Priced
3005 Material including but not limited to parts, tool and tool rental, fuel, metallugical and photo lab materials associated with CLINs 3001 and 3003 (travel) shall not exceed $TBD and will be applied toward the established ceiling amount.
3006 Additional Labor Classifications and hourly rates required for any specific task order shall be proposed in accordance with Section 8.9 of the Sustainment Engineering Statement of Work and added to the contract as CLIN 3004.
3007 Progress Reports (As required on individual orders) Not Separately Priced
&"Times New Roman,Bold"&12ATTACHMENT 2
&"Times New Roman,Regular"&12&P
OPT4
| SCHEDULE OF SERVICES | |
| OPTION YEAR 4 | |
| End of Year 3 - One Calendar Year | |
| CLIN | DESCRIPTION |
| 4001 | Provide sustaining engineering services for the base year and all option years in accordance with the Statement of Work on an as required basis utilizing the fixed price hourly rates specified below. Individual fixed-price task orders will be issued against this contract based on negotiated and agreed work statement using the labor rates identified below for contractor peronnel effort. The estimated hours includes services at both Airbus Defense and Space, Inc (US) and Spain locations. |
| Airbus (US) Manhour Rate | Airbus (Spain) Manhour Rate | |||
| Labor Category | Hours | Rate | Hours | Rate |
| Program Manager (ADSI) | 30 | $ - 0 | 10 | $ - 0 |
| Technical Manager | 20 | $ - 0 | 0 | $ - 0 |
| Technical Representative | 24 | $ - 0 | 24 | $ - 0 |
| Field Representative | 16 | $ - 0 | 0 | $ - 0 |
| Spares Coordinator | 16 | $ - 0 | 0 | $ - 0 |
| Structural Engineer | 50 | $ - 0 | 200 | $ - 0 |
| Engineer | 25 | $ - 0 | 175 | $ - 0 |
| Engineer Specialist | 25 | $ - 0 | 75 | $ - 0 |
| Technical Information Manager | 0 | $ - 0 | 16 | $ - 0 |
| Technical Writer | 0 | $ - 0 | 24 | $ - 0 |
| Technical Illustrator | 0 | $ - 0 | 20 | $ - 0 |
| Airframe Structural Mechanic | 80 | $ - 0 | 0 | $ - 0 |
| Avionics Specialist | 80 | $ - 0 | 0 | $ - 0 |
| Nondestructive Inspection Technician | 40 | $ - 0 | 0 | $ - 0 |
| 4002 | Field Service Representative (FSR) | 234 | $ - 0 |
| Monthly Activity Report and Certificate of Service | (MAN DAYS) |
4003 Estimated Travel To Be Determined
4004 Engineer Drawings & Associated Lists Not Separately Priced
4005 Material including but not limited to parts, tool and tool rental, fuel, metallugical and photo lab materials associated with CLINs 4001 and 4003 (travel) shall not exceed $TBD and will be applied toward the established ceiling amount.
4006 Additional Labor Classifications and hourly rates required for any specific task order shall be proposed in accordance with Section 8.9 of the Sustaining Engineering Statement of Work and added to the contract as CLIN 4004.
4007 Progress Reports (As required on individual orders) Not Separately Priced