ATTACHMENT 2 - Schedule of Items.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 1282B125R0024
- Issued by
-
Department of Agriculture Forest Service
About this file
The document is an Attachment 2 Schedule of Items for the Hiner Spring Quarry Development project in Rio Blanco County, Colorado, issued by the U.S. Forest Service. The solicitation (Number 1282B125R0024) covers a quarry development with a base and optional work scope, including mobilization, soil erosion control, drainage excavation, and aggregate stockpiling. The project's estimated performance period is from June 16, 2025, to October 15, 2025, with a total estimated aggregate volume of 24,000 cubic yards across base and optional items.
Key pricing and contract details include a single award approach requiring pricing for all items, with the government reserving the right to exercise all, some, or no optional items. The project involves mineral construction materials (NAICS 212319) with a size standard of 550 employees. Specific line items cover mobilization, soil erosion control, drainage work, controlled blasting, and aggregate stockpiling, with detailed specifications for material handling, testing, and site preparation. Payment will be based on actual work performed, with bond premiums included in the mobilization cost.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section B - Schedule of Items |
| Hinery Spring Quarry Development |
| Blanco Ranger District |
| White River National Forest |
| Rio Blanco County, Colorado |
Vendor Name:
| B.1 Schedule of Items | Base 0001: Hiner Spring Quarry Development | ||||
| Pay Item | Description | Unit | Quantity | Unit Price | Amount |
| 15101 | Mobilization | Lump Sum | All | ||
| 15713 | Soil Erosion & Pollution | Lump Sum | All | ||
| 20425 | Drainage Excavation, Drain Dip with Leadout Ditch | Each | 2 | ||
| 31401 | Stockpiled Aggregate, Surface Course Gradation (FSSS 703-3) | CY* | 14000 | ||
| TOTAL | |||||
| Option Item 1001: Hiner Spring Quarry Development | |||||
| Pay Item | Description | Unit | Quantity | Unit Price | Amount |
| 31401 | Stockpiled Aggregate, Surface Course Gradation (FSSS 703-3) | CY* | 10000 | ||
| 20501 | Controlled Blasting | Lump Sum | All | ||
| TOTAL | |||||
| B.2 Schedule Notes | |||||
| a) Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract. | |||||
| b) The Government reserves the right to exercise all, one or none of the option items. | |||||
| c) All pricing for options should include but are not limited to all labor, materials, mobilization, and bonding etc.… | |||||
| d) One award will be made from this solicitation; contractors must submit pricing for all items. | |||||
| e) For bidding purposes, the estimated period of performance start date is June 16, 2025 with a delivery end date of no later than October 15, 2025. |
| B.3 Schedule Notes |
| 1. Partial quantities from the option item(s) may be ordered. |
| 2. Pay units marked * are contract quantities. Contract quantities are measured in accordance with FP-14 and FSSS 109.02. |
| 3. Road closures, and temporary traffic signing and control (FSSS 156) is indirectly included in item 15101 |
| 4. Pay Item 15713 includes: |
| a. Plan, soil erosion, pollution, dust control, and interim reclamation of the pit, this work shall be performed in accordance with FP-14 and FSSS section 157 and the plans. |
| 5. Pay item 20501 includes: |
| a. All required reports, plans, testing, and monitoring in accordance with FP-14 and FSSS section 205. |
| 6. Pay item 31401 includes: |
| a. Establish and prepare stockpile sites at locations approved by the CO and shown on the Plans. |
| b. Producing aggregate by screening or crushing methods. |
| c. Handle and stockpile according to section 314 and the Plans. |
| d. Material sampling, testing, and acceptance according to FSSS 703.05. |
| e. Grading designation - surface course gradation (FSSS 703-3) |
| f. Developing water supply and watering is indirectly included in item 31402. Water sources are to be designated and approved by the COR prior to use. |
| B.4 Schedule Notes |
| Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization. |
| Payment will be made on actual work performed as described in FP 14 109.02 unless otherwise noted. |
File details come from the government source that posted it. Updated .