Attachment 2 Schedule of Items.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Hydraulic Cylinder Bench Nut Buster – Anaconda Job Corps Center
Solicitation number
1282A725Q0025
Issued by

View the file

Other files

File Type Posted
Sol_1282A725Q0025_Amd_0001.pdf PDF
1282A725Q0025 Questions and Answers.pdf PDF
SAM_Sol_1282A725Q0025.pdf PDF
Attachment 1 Specifications.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Services
Labor CategoriesEnter ALL proposed labor categories
Labor RatesUse loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
TravelUse an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Cumulative TotalDelete total from any/all unused option periods after completing chart
Period Of PerformanceIf your period of performance for the Base and/or Option Period(s) is less than 12 Months - reflect actual month total in column header
Instructions for Supplies
ColumnsComplete all columns. If there is no serial/product number enter "N/A"
Item(s)Add/delete rows as applicable (ensure item subtotal includes amounts from added rows). Identify and group items by Brand
OptionsComplete as applicable. If the option 3 and 4 page does not apply to your requirement, do not submit with your final IGCE.
Other Direct Costs (ODCs)Itemize all applicable ODCs (such as installation or special equipment) Not all requirements will have ODCs.
TravelUse an overall estimated cost for travel. Combine elements as air fare, per diem, and local travel multiplied by the # of trips.

Services

Independent Government Cost Estimate for Services
Estimator Name:Project Title:
Date:Project Manger:
Base Period: 12 MonthsOption 1: 12 MonthsOption 2: 12 MonthsOption 3: 12 MonthsOption 4: 12 Months
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Labor Total0$0.000$0.000$0.000$0.000$0.00
Other Direct Costs$0.00$0.00$0.00$0.00$0.00
(ODCs)

Travel $0.00 $0.00 $0.00 $0.00 $0.00

ODC/Travel Subtotal$0.00$0.00$0.00$0.00$0.00
Period Total$0.00$0.00$0.00$0.00$0.00
Cumulative TOTAL$0.00$0.00$0.00$0.00$0.00

Supplies Schedule of Items

Base
Item(s)Serial/Product No.QuantityUnit CostAmount
Torque Head10.00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Item Subtotal$0.00
ODCs$0.00
Travel$0.00
ODC/Travel Subtotal$0.00
Period Total$0.00
Cumulative TOTAL$0.00

File details come from the government source that posted it. Updated .