Attachment 2-RMF Assessment Timeframes.pdf
PDF 351 KB Posted
- Attached to
- Histology
- Solicitation number
- W81K0026QA005
- Issued by
-
Department of the Army Medical Command
About this file
Exhibit 1 is a detailed RMF (Risk Management Framework) Assessment Timeframes document outlining specific timeframes for vendor and government actions following a contract award. The document is divided into two sections: Vendor Requirements and Government Requirements, each specifying initial draft and final due dates for various technical and administrative deliverables.
Vendor Requirements include tasks such as contacting the Government Point of Contact, producing Hardware/Software/Architecture Documents, RMF Documentation, Technical Nessus Scans, Technical STIG Checklists, and Technical SCAP. Government Requirements involve a kickoff meeting, Security Assessment Plan Generation, RMF Template distribution, providing copies of applicable STIGs, and Authorization to Operate (ATO-C) recommendation. The timeframes range from 5 business days to 6 months post-award, with most deliverables expected within 30 days. The document emphasizes that if the vendor completes all required actions in a timely manner, additional time will be granted for government-caused delays.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .