Attachment 2 - Response Form.pdf

PDF 795 KB Posted

Attached to
Entry Control Point (ECP) Facility for the Integrated Command Center (ICC)
Solicitation number
FA461324Q1049
Issued by

About this file

This document is a Contractor Response Form for a Sources Sought/Request for Information (RFI) notice issued by the Department of the Air Force Global Strike Command for an Entry Control Point (ECP) Facility for the Integrated Command Center (ICC) at Francis E. Warren Air Force Base in Wyoming.

The RFI seeks information from potential contractors on their ability to provide a modular or prefabricated ECP facility, including site preparation, delivery, installation, and fit-out. Key details requested include the lead time required for a site visit, the duration of the site visit, the timeline to begin work after award, the period of performance, the volatility of labor and material pricing, and feedback on the draft Performance Work Statement. The NAICS code is 332311 - Prefabricated Metal Building and Component Manufacturing, with a small business size standard of 750 employees. Responses are due by July 19, 2024 and will be used to determine the appropriate acquisition strategy, which may involve a small business set-aside. No award will be made from this RFI.

View the file

Other files

File Type Posted
Attachment 1a - ECP Trailer Layout Concept Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Response Form

Sources Sought / Request for Information Notice Number: FA461324Q1049

Description: Entry Control Point (ECP) Facility for the Integrated Command Center (ICC)

Company Information

Company Name (as registered in SAM.gov):

Company Doing Business As (if applicable):

Cage Number: Unique Entity ID

Socioeconomic Status (SB, SDB, WOSB, EDWOSB, VOSB, SDVOSB, 8(a), 8(a) JV, HUBZone):

Point of Contact:

Email: Phone number:

GSA Contract (this only should be completed if the service offered is on your GSA contract/schedule and you must provide evidence by including a copy the contract/schedule)

Contract Number:

Questions

1. How long is needed in calendar days between a future solicitation notice and a site visit to participate?

2. How long would a site visit in hours (round up to nearest hour) take to complete?

3. How long after award, in calendar days, would you be able to begin work?

Attachment 2 - Response Form

4. Period of performance in business days to complete work once contract is awarded?

5. How volatile is market pricing for the labor and materials applicable to this contract;

specifically, how long can fixed unit prices be used as fair and reasonable?

6. Any feedback on Attachment 1 – Draft Performance Work Statement:

Additional Comments

Attachment 2 - Response Form

File details come from the government source that posted it. Updated .