Attachment 2 - Recycling of Tritium Compasses Watches and Gun Sights PWS.docx

DOCX document 28 KB Posted

Attached to
Recycling of Tritium Compasses, Watches and Gun Sights
Solicitation number
FA860120R0032
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

RECOVERY/RECYCLING OF

TRITIUM COMPASSES, GUN SIGHTS andWRIST WATCHES
June 2020

I. DESCRIPTION OF SERVICES

1. Scope: Certain types of commodities are no longer used within the Department of Defense or have exceeded the useful shelf life. This Performance Work Statement includes compasses, gun sights and wrist watches containing tritium in a gaseous state contained in microspheres and were initially transferred as exempt devices or quantities, 10 CFR 30.15 and 10 CFR 30.19. This scope does not include tritium as a non-gaseous, solid oxide paint in commodities.

a. The contractor shall provide all labor, equipment, and materials necessary to Recover/Recycle tritium from compasses, gun sights and wrist watches commonly found within the Department of Defense (DOD). Any non-radioactive materials associated with these commodities, i.e. plastic or metal, deemed recyclable by the contractor can be recycled or disposed as the contractors deems appropriate without regard to government approval.

b. The contractor will provide cost for accepting for Recovery/Recycling compasses, gun sights and wrist watches for a base year plus four additional years. The pricing should be based on the description and quantity of the following:

Base Year: 31 July 2020 – 30 July 2021

· 5,700 each Compasses, approximately 45 millicuries each (decayed), 256.5 curies.

· 752 each Gun Sights, approximately 25 millicuries each (decayed), 18.8 curies.

· 0 each Wrist Watches 2nd Year: 31 July 2021 – 30 July 2022

· 5,700 each Compasses, approximately 45 millicuries each (decayed), 256.5 curies.

· 10 each Gun Sights, approximately 25 millicuries each (decayed), 18.8 curies.

· 50 Wrist Watches, approximately 7.5 millicuries each (decayed), 0.375 curies.

3rd Year: 31 July 2022 – 30 July 2023

· 5,700 each Compasses, approximately 45 millicuries each (decayed), 256.5 curies.

· 10 each Gun Sights, approximately 25 millicuries each (decayed), 18.8 curies.

· 50 Wrist Watches, approximately 7.5 millicuries each (decayed), 0.375 curies.

4th Year: 31 July 2023 – 30 July 2024

· 5,700 each Compasses, approximately 45 millicuries each (decayed), 256.5 curies.

· 10 each Gun Sights, approximately 25 millicuries each (decayed), 18.8 curies.

· 50 Wrist Watches, approximately 7.5 millicuries each (decayed), 0.375 curies.

5th Year: 31 July 2024 – 30 July 2025

· 5,700 each Compasses, approximately 45 millicuries each (decayed), 256.5 curies.

· 10 each Gun Sights, approximately 25 millicuries each (decayed), 18.8 curies.

· 50 Wrist Watches, approximately 7.5 millicuries each (decayed), 0.375 curies.

1.1 Program Management

a. Items for Disposition:

1. The USAF will provide the items listed in Section 1.b.

2. The USAF will provide an inventory that includes the manufacturer, model number, serial number, initial and decayed radioactivity and date of manufacturing of the commodities if available.

3. The USAF will provide for transportation to the designated contractor facility.

b. Contractor provided items

1. The contractor shall provide all labor, equipment, and materials necessary for the Recovery/Recycling of tritium from the compasses and gun sights.

2. The contractor, upon receipt of the shipment, will take possession of the items listed in Section 1.b. Upon receipt of the shipment the Air Force will be relieved of all future responsibility for the radioactive sources.

3. Contractor shall provide to the USAF, subsequent to receipt and inventory of the shipment contents, documentation verifying the quantity of the items listed in Section 1.b.

1.2 Regulatory

a. The compasses and gun sights initially distributed devices or quantities, 10 CFR 30.15 and 10 CFR 30.19, have subsequently been transferred to a specific licensee. Therefore, before award the contractor shall electronically submit a valid United States Nuclear Regulatory Commission (US NRC) or current Agreement State license and any renewal documentation, if expired, to the Air Force Radioactive Recycling and Disposal (AFFRAD) office, 88 CEG/CEIEC, Wright-Patterson AFB, OH in order to meet minimum Government requirements and be eligible for award.

b. In this Performance Work Statement (PWS) the term Recovery/Recycling applies to non-inherently governmental services. The contractor is responsible for compliance with all current environmental laws and regulations (local, state and federal). Regulations, licenses and permits issued by the Host State, US NRC, US EPA, Department of Transportation (US DOT) and the Department of Homeland Security must be used to comply with, if applicable.

1.3 Shipments

a. AFRRAD will coordinate with the contractor at least 15 days prior to shipment to obtain any necessary approvals from contractor prior to shipping.

b. AFRRAD will coordinate with Government agencies to obtain a carrier, at the Governments expense, for the transportation of the tritium compasses and gun sights listed in Section 1.b. to the contractor’s facility

c. AFRRAD will inform the contractor with an estimated shipment arrival date at the contractor’s facility.

1.4 Recordkeeping

a. All contractor provided services shall comply with mandatory US NRC recordkeeping.

b. The contractor will provide the Air Force with a receipt of the irradiator systems within 72 hours or their receipt at the contractor’s facility.

II. WORKLOAD PERFORMANCE PERIOD

The performance period for this contract is 5 years from NTP. The contractor shall submitted electronically invoice through Wide Area Workflow.

III. QUALITY ASSURACE AND GOVERNMENT ACCEPTOR INSTRUCTIONS

3.0 Normal Duty Hours: Normal duty hours are defined as 0730 to 1630, Monday through Friday, except Federal Holidays, for all customer service functions.

3.1 Environmental Laws and Regulations: The contractor shall be familiar with and have immediate access to sustain compliance with applicable environmental statutes and regulations of the US NRC, Agreement State and more specific state license documents. In the event that applicable regulatory rule changes are made during this contract, the contractor shall comply with the most current “new” rules.

3.2 The Wright-Patterson AFB, OH points of contact for the irradiator systems:

Chris AnthonyBrian Mitchell
88 CEG/CEIEC88 CEG/CEIEC
Air Force Radioactive Recycling and DisposalAir Force Radioactive Recycling and Disposal
1450 Littrell Road1450 Littrell Road
Wright-Patterson AFB, OH 45433Wright-Patterson AFB, OH 45433
(937) 255-1852(937) 255-1852

File details come from the government source that posted it. Updated .