ATTACHMENT 2 QUALITY ASSURANCE SURVEILLANCE PLAN.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C26024Q0808
About this file
This document is a Quality Assurance Surveillance Plan (QASP) that outlines the government's plan for monitoring contractor performance for a remote Level 1 sleep study scoring services contract. The QASP defines the performance standards, methods of surveillance, and government roles and responsibilities. The key details are:
The contractor will be evaluated on submitting sleep study results within 2 business days (90% target), providing reports in the proper format (98% target), and providing qualified sleep study technicians (100% target). The Contracting Officer's Representative (COR) and VA sleep study physicians will observe 98% of the sleep study reports for accuracy, quality, and timeliness. The COR will also verify the qualifications of the contractor's sleep study technicians and compliance with VA's mandatory training requirements. The Department of Veterans Affairs, Network Contracting Office 20, is the responsible government agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 3 KEY PERSONNEL LISTING.docx | DOCX document | |
| ATTACHMENT 4 PAST PERFORMANCE REFERENCES.docx | DOCX document | |
| 36C26024Q0808.docx | DOCX document | |
| ATTACHMENT 5 CONTRACTOR EMPLOYEE LEGAL STATUS.docx | DOCX document | |
| ATTACHMENT 1 PERFORMANCE WORK STATEMENT.docx | DOCX document | |
| ATTACHMENT 6 ORGANIZATIONAL CONFLICT OF INTEREST STATEMENT.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Level One Sleep Study Scoring Service The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO): The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: The CO for this contract will be listed on the COR Delegation Letter after contract award.
Organization or Agency: Department of Veterans Affairs Network Contracting Office 20 (NCO 20)
b. Contracting Officer’s Representative (COR) –The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: The COR will be designated on the COR Delegation Letter.
Organization or Agency: NCO 20
3. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
4. METHODS OF QA SURVEILLANCE
The COR and VA sleep study physicians will observe 98% of the sleep study reports for accuracy, quality and the timeless of the reports sent to VA. In addition, the COR will verify the qualifications of the Contractor’s Sleep Study Technicians. Mandatory VA training will also be verified by the COR.
5. QASP PERFORMANCE REPORT DATE: _________________
| Task |
| PWS |
Para.
| Standard |
| Acceptable Quality Level |
| Surveillance |
Method Met AQL/DID NOT MEET AQL- CPAR RATING/ADD COMMENTS
| Score and Return Sleep Study Reports to VA |
| 2.3 |
| Submit study results NLT two business days. |
| 90% |
| Observation |
| Reporting |
| 2.4 |
thru 2.4.8
| Reports in the proper format and headings. |
| 98% |
| Observation |
| Provide Qualified Sleep Study Technicians |
| 3.4 |
| Sleep study certified Technicians. |
| 100% |
| Verification |
| Mandatory Training |
| 3.7 |
| Complies with VA requirements for Mandatory Training. |
| 90% |
| Verification |
File details come from the government source that posted it. Updated .