This document is a Quality Assurance Surveillance Plan (QASP) for the solicitation to provide equine boarding services on the Grand Mesa, Uncompahgre, and Gunnison National Forests from November 1, 2023 through May 31, 2024. The QASP sets forth procedures for the USDA Forest Service to ensure the contractor meets required performance standards, including daily care and feeding to maintain a Henneke body condition score of 4-6 for each animal and keep animals free from injury beyond minor issues. Performance will be monitored through monthly inspections by the 10th day of each month to check facilities are maintained to control animals and maintain equine health, and that Forest Service staff have access. Non-performance may result in withholding a portion of the monthly payment until standards are met. The solicitation number is 1240LQ23Q0103 and was issued by the USDA Forest Service for equine boarding services on the Grand Mesa, Uncompahgre, and Gunnison National Forests.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Quality Assurance Surveillance Plan

Contents Project Name Solicitation / Contract Number Section 1: Introduction

1.1 Purpose

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

1.2.2 Surveillance of Performance Progression

1.3 QASP Relation to the Quality Control Plan (QCP)

Section 2: Performance Description

2.1 Performance Standards and Acceptable Quality Levels (AQLs)

2.1.1 Allowable Deviation

2.1.2 Substantially Complete

2.2 Non-Performance

2.2.1 Documentation

2.2.2 Remedial Actions

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

3.2.2 Contracting Officer Representative (COR)

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

4.1.1 Method of Surveillance (Inspection)

4.1.2 Performance Standards and AQLs

4.1.3 Evaluation Procedures

4.2 Analysis and Results

4.2.1 Satisfactory Performance

4.2.2 Unsatisfactory Performance

Appendix A. Performance Requirement Summaries Appendix B. Discrepancy Report Appendix C. Inspection List

Project Name Quality Assurance Plan 2023‐2024 GMUG Winter‐Spring Equine Boarding

Solicitation / Contract Number

1240LQ23Q0103

Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled 2023‐2024 GMUG Equine Boarding for equine boarding services for the Grand Mesa, Uncompahgre, and Gunnison (GMUG) National Forests, including daily care and forage, for up to 20 horses for 7 months (213 days) from November 1, 2023, through May 31, 2024. This plan sets forth the procedures and guidelines that the USDA, Forest Service (FS) will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) (Appendix A. Performance Requirement SummariesAppendix A) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).

1.2.2 Surveillance of Performance Progression

As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.

1.3 QASP Relation to the Quality Control Plan (QCP)

The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.

Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.

2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL (Appendix A. Performance Requirement Summaries). A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.

The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.

2.1.1 Allowable Deviation

The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).

2.1.2 Substantially Complete

In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.

2.2 Non‐Performance

Non‐performance occurs when the contractor’s performance does not meet the AQL for a given requirement.

Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.

When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.

2.2.1 Documentation

Documentation of work non‐performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix B. Discrepancy Report. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.

2.2.2 Remedial Actions

The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point‐of‐contact to act as a central recipient of communication from the COR or CO.

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day‐to‐day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.

3.2.2 Contracting Officer Representative (COR)

The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non‐performed work, and revisions or changes to the QASP;

and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.

The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the

CO.

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist, and improvements are necessary.

The PRS Method of Surveillance will be comprised of an FS staff monthly inspection by the 10th day of each month.

Additionally, if FS staff are present at the Contractor’s facility and find potential issues at any time these will be reported and followed up on.

4.1.1 Method of Surveillance (Inspection)

Methods of surveillance require complete inspections each month and will be used for critical contract requirements.

Critical contract requirements in the PWS and listed in Appendix A. Performance Requirement Summaries will be inspected. An inspection list form will be utilized to determine if performance is Satisfactory (S), Unsatisfactory (U), or Not Applicable (NA) (Appendix C. Inspection List).

4.1.2 Performance Standards and AQLs

The AQLs for performance standards (deliverables) are 100% and shown in Appendix A. Performance Requirement Summaries. AQLs monitoring

4.1.3 Evaluation Procedures

Any observed defects for a service monitored by 100 percent inspection will be compared to the performance standard and AQL.

4.2 Analysis and Results

When the inspections have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high‐quality products and services from the Contractor.

The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:

4.2.1 Satisfactory Performance

Contractor meets all performance requirements of PWS, including Section 3.0 Technical Requirements.

4.2.2 Unsatisfactory Performance

Contractor does not meet all performance requirements of PWS, including Section 3.0 Technical Requirements.

Appendix A. Performance Requirement Summaries

Item No.

Required Services – Deliverable (PWS Task)

PWS

Reference/ Contract Reference

Performance Standard

Acceptable Quality Level

(AQL)

Method of Surveillance

Negative Incentive % for NOT meeting the Deliverable

1 Stock Boarding – Care and Feeding: Henneke body condition score 4‐6 on each animal and animals are free of injury beyond minor with all performance of work Section 3 technical components

Contractor Requirements

3.0 Technical

Requirements / Tasks

Daily during the performance period from November 1, 2023, through May 31, 2024

100% FS staff monthly inspection by the 10th day of each month; FS will determine cause of body condition or injuries not meeting deliverables

If deliverables do not meet performance standard due to contractor, FS will withhold the equivalent of the monthly price for each affected animal(s) until contractor remedies situation to deliverable standard

2 Stock Boarding – Facility Maintenance:

Facility is maintained to control animals and maintain equine health and body condition and safety with all performance of work Section 3 technical components

Contractor Requirements

3.0 Technical

Requirements / Tasks

Daily during the performance period from November 1, 2023, through May 31, 2024

100% FS staff monthly inspection by the 10th day of each month

If deliverables do not meet performance standard, FS will withhold 10% of total monthly price per incident until contractor remedies situation to deliverable standard

3 Stock Boarding – FS Staff Access: FS staff and equine services personnel (veterinary, farrier) have facility access, including vehicular, with all performance of work Section 3 technical components

Contractor Requirements

3.0 Technical

Requirements / Tasks

Daily during the performance period from November 1, 2023, through May 31, 2024

100% FS staff monthly inspection by the 10th day of each month

If deliverables do not meet performance standard, FS will withhold 10% of total monthly price per incident until contractor remedies situation to deliverable standard

Appendix B. Discrepancy Report

DISCREPANCY REPORT 1. DISCREPENCY REPORT NO.

2. TO: (Contractor / Project Manager Name) 3. FROM: (Name of COR)

CONTRACT NUMBER: DATE:

PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR ACTION COMPLETE

4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)

5. SIGNATURE OF COR

6. TO: (Name of COR) 7. FROM: (Contractor / Project Manager)

8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)

9. SIGNATURE OF CONTRACTOR REPRESENTIVE 10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)

12. GOVERNMENT ACTIONS (Cure notice, show cause, other)

CLOSE OUT

KTR NOTIFIED

NAME AND TITLE SIGNATURE DATE

COR

Appendix C. Inspection List

CONTRACT NUMBER: ___________________________________________________________________

CONTRACTOR NAME: ___________________________________________________________________

SERVICE FUNCTION:

PWS SECTION:

SURVEILLANCE METHOD (Check the applicable item):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

2 Performance Requirement: Performance is Satisfactory (S) when no defects are discovered per month. Performance is Unsatisfactory (U) when 1 or more defects are discovered per month.

3 Inspection Procedure:

All Section 3.0 technical components of the PWS are visually inspected.

Acceptable deliverables are those meeting all technical components of Section 3.0 of the PWS.

Unacceptable deliverables are those not meeting technical components of Section 3.0 of the PWS.

Performance: Satisfactory (S), Unsatisfactory

(U), Not Applicable (N/A)

PRS Requirements Timeliness Quality Notes

Overall Rating Of Inspection (S, U or N/A)

COR/Inspector Comments:

Contractor Signature: ___ Date: __

COR Signature: ____________________Date: _________________