Attachment_2_PWS_1.pdf
PDF 330 KB Posted
- Solicitation number
- 140L4325Q0001
About this file
This document is a Performance Work Statement (PWS) and a related Sources Sought notice for a federal contract opportunity.
The PWS outlines the requirements for a road maintenance services contract for the Bureau of Land Management's (BLM) Northwest Oregon District. The contract will include a variety of routine maintenance services such as road grading, snow plowing, pavement sweeping, culvert cleaning, hazard removal, and roadside brushing. The contractor will be responsible for providing all necessary equipment, operators, and materials to perform the work.
The related Sources Sought notice indicates the BLM is seeking information from small businesses interested in providing these road maintenance services under a 5-year Indefinite Delivery Indefinite Quantity (IDIQ) contract. Respondents are asked to provide details on their capabilities, equipment, and geographic areas they can service. The government will use this information to determine the appropriate small business set-aside, if any, and the number of IDIQ contracts required. Responses are due by October 25, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_Specifications_1.pdf | ||
| A06_DistrictOverview_Color_20241008_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2: Performance Work Statement
Example Schedule of Items
Item no. Item Description Unit of Measure 01001 Routine Road Grading LNMI 01002 Compaction LNMI 01003 Snow Plowing LNMI 01004 Pavement Sweeping LNMI 01005 Shoulder Maintenance MI 01006 Bridge Maintenance EA 01007 Slide Removal
01007A Slide Removal ≤ 200 CY CY 01007B Slide Removal > 200 CY CY
01008 Maintain/Restore Ditch Lines, Culvert Catch Basins, and Outlet Channels
CY
01009 Clean Culverts EA 01010 Hazard Removal From/Along Roadway
01010A Boulder, Stump, etc. ≤ 5 CY EA 01010B Boulder, Stump, etc. > 5 CY EA 01010C Blowdown ≤ 24” Diameter EA 01010D Blowdown > 24” Diameter EA 01010E Standing Hazard Tree ≤ 36” DBH EA 01010F Standing Hazard Tree > 36” DBH EA
01011 Roadside Brushing 01011A Mowing MI 01011B Light MI 01011C Medium MI 01011D Heavy MI
01012 Subgrade Sampling 01012A Subgrade Sampling ≤ 10’ FT 01012B Subgrade Sampling > 10’ FT
UNIT OF MEASURE
MI=Mile (to the nearest 10th) LNMI=Lane Mile (to the nearest 10th) LF=Linear Feet EA=Each CY=Cubic yard DBH=Diameter Breast Height FT=Feet
Performance Work Statement, continued next page.
SECTION C – PERFORMANCE WORK STATEMENT (PWS)
Part 1
General Information
1.0 General: This is a non-personnel services contract to provide road maintenance services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform road maintenance as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: The Government requires maintenance services of forest roads in multiple locations within the area of responsibility of the Northwest Oregon District, of the Bureau of Land Management.
1.3 Scope: The purpose of this contract is to provide for road maintenance of forest roads in the Northwest Oregon
District, of the Bureau of Land Management. This work includes furnishing labor, equipment, supervision, transportation, operating supplies, and all incidentals necessary to provide maintenance in accordance with the drawings and specifications of the contract. The Contractor may be required to perform work items simultaneously at more than one location at a time. Routine maintenance generally consists of services that renovate a roadway to the road’s original design standard which would bring it back to the original template shape with a smooth-running surface that is free of debris and hazards and a drainage system that is free of debris and blockages.
1.3.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The quality control plan is due with contract proposal. After acceptance of the quality control plan the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.
1.3.2 Quality Assurance: (Quality Assurance shall be provided by the contractor in the task order level).
1.3.3 Recognized Holidays:
New Year's Day (January 1).
Birthday of Martin Luther King, Jr. (Third Monday in January).
Washington's Birthday (Third Monday in February).
Memorial Day (Last Monday in May).
Juneteenth National Independence Day (June 19).
Independence Day (July 4).
Labor Day (First Monday in September).
Columbus Day (Second Monday in October).
Veterans Day (November 11).
Thanksgiving Day (Fourth Thursday in November).
Christmas Day (December 25).
1.3.4 Hours of Operation: The contractor is responsible for conducting business, as provided in Section H.1.0 Work Hours, Monday thru Friday, except Federal holidays as provided in Section C.1.3.3 Recognized Holidays, or is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.3.5 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer (CO), Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.3.6 Contract Manager: The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
(End of Part 1)
PART 2
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (CO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the Contracting
Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.5 Lane Mile (LNMI): A single lane mile is one mile of road, measured along the centerline, with a roadbed width of fifteen feet (15’) or less. Roadbeds that are sixteen feet (16’) in width or greater will be counted as 2 LNMI for one mile of road, as measured along the centerline.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.10 Work Day: The number of hours per day the Contractor provides services in accordance with the contract.
2.1.11 Work Week: Monday through Friday, unless specified otherwise.
2.2 Acronyms:
BLM Bureau of Land Management COR Contracting Officer Representative COTS Commercial-Off-the-Shelf FAR Federal Acquisition Regulation CO Contracting Officer POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SOW Statement of Work TE Technical Exhibit TO Task Order
(End of Part 2)
PART 3
Government Furnished Property, Equipment, and Services
3.0 Government Furnished Property: The Government will furnish to the Contractor the following materials, supplies, property or services at the pre-work conference for each task order, as applicable:
A. Location and project maps, as well as any typical drawings that may be specific to a certain task.
B. BLM gate keys.
C. Identify approved water sources when required by task.
D. Approved disposal locations.
(End of Part 3)
PART 4
Contractor Furnished Items, Equipment, and Services
4.0 Contractor Furnished Items:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS. The Contractor shall provide the necessary equipment with qualified operator(s) for each assigned task. The Contractor shall provide all operating supplies such as fuel, oil, and grease and shall agree to make this equipment available for work within the period stated and at the locations specified in each task order, or as needs arise.
4.2. Materials:
4.2.1 Erosion Control Materials: The Contractor shall furnish erosion control materials acquired from commercial sources.
4.2.2 Traffic Control Devices: Traffic control devices shall be required to control traffic flow where project operations may be a safety concern to the workers and/or public. Traffic control devices shall meet the requirements of the Manual on Uniform Traffic Control Devices.
4.3 Equipment:
4.3.1 Equipment: Contractor shall provide all equipment necessary to perform the services listed in Section B of this contract. Equipment shall be available for inspection by the Government prior to use. Inspections will ensure equipment arrives on site clean and weed free. Equipment shall be in safe operating condition for the operator in the seat and workers or Government Officials on site to be around. Equipment shall be in good operating condition, free of leaks.
4.3.2 Maintenance: All equipment maintenance, repair, and refueling to be done on-site shall be performed a minimum
100-feet from any water source, including stream channels, flowing ditches, or standing water, or at a location designated by the Contracting Officer. The Contractor shall furnish all materials and equipment necessary to assure that the equipment servicing will be clean, without uncontrolled leakage or spilling.
4.3.3 Equipment Cleaning: Prior to transporting equipment across BLM administered lands or roads, or beginning operations on required work, all equipment shall be thoroughly cleaned and free of dirt, grime, muck, seed, and petroleum products, and shall be inspected and approved by the Contracting Officer Representative, unless otherwise agreed upon. Once the equipment begins operations on BLM, general cleaning won't again be required so long as it remains reasonably clean, or the continuous time that the equipment is located on BLM is not broken.
4.3.4 Equipment Breakdown: In the event of equipment breakdown in connection with work being performed under this contract, the Contractor agrees that any repairs shall be accomplished within 48 hours (or 24 hours when working on emergency repairs) from the date of such breakdown. If such repairs cannot be completed within the allotted time, the failing equipment will be replaced with other suitable machinery and operations resumed at no additional cost to the Government.
4.4 Operators:
4.4.1 Equipment Operator: Experienced operators in the use and maintenance of all Contractor-furnished equipment is considered essential. The government reserves the right to require the Contractor, in writing, to remove from the project any operator who, in the opinion of the Contracting Officer, is found to be inexperienced, inefficient, has poor work habits, does poor quality work, or operates the equipment in an unsafe manner. The Contractor shall provide a replacement operator within 24 hours.
4.4.2 General Laborer/Sawyer: Experienced personnel to accomplish cutting, bucking, limbing of windfall, and standing hazard trees, setting chokers, shoveling debris from culvert inlets, and performing other tasks associated with maintenance operations.
4.4.3 Certified Flaggers: Flaggers shall be required to control traffic flow where project operations may be a safety concern to the workers and/or public. Flaggers shall be certified within the State of Oregon.
(End of Part 4)
PART 5 SPECIFIC
TASKS
5.0 Specific Tasks:
Sub-items will be detailed in each task order to perform a variety of road maintenance activities, including, but not limited to:
1. Routine Road Grading
2. Compaction
3. Snow Plowing
4. Pavement Sweeping
5. Shoulder Maintenance
6. Bridge Maintenance
7. Slide Removal
8. Maintain/Restore Ditch Lines, Catch Basins, and Outlet Channels
9. Clean Culverts
10. Hazard Removal from Roadway
11. Roadside Brushing
12. Subgrade Sampling
5.1 Routine Road Grading: Grading operations shall be conducted to accomplish the renovation of the roadbed, shoulders, and ditch-line to its original design template. Work may include blading off debris (limbs, leaves, bank ravel, etc.), ripping ruts and potholes to their full depths, and reshaping the original crown, in-slope, or out-slope templates over the full width of roadbed, turnouts, and shoulders to promote water runoff and decrease sediment delivery. Elevated shoulders which inhibit drainage shall be bladed down to the elevation of the adjacent roadbed and sloped to encourage surface drainage, with accumulated material side-cast except within 100 feet of culvert outlets and streams, or areas of instable side-slopes. Side-cast material shall not be accumulated, rather spread over a broad area to minimize impacts.
Minor maintenance, not to exceed a single pass, of ditch-lines shall be performed to remove limbs, ravel, and other minor obstructions, in order to contain and improve water flow. Larger accumulations that require more work shall be accomplished under Maintain/Restore Ditch Lines, Catch Basins, and Outlet Channels and charged per cubic yard.
Suitable aggregate material which had previously been displaced outside of the limits of the running surface, both by traffic and/or past maintenance activities, shall be reclaimed onto the traveled way, when possible, without contaminating the surface.
5.2 Compaction: Roadway shall be compacted to the full road surface width after grading operations when designated on the Task Order. Minimum compaction of roadway shall be one (1) hour of continuous rolling for each six (6) stations, or fraction thereof as measured along the centerline.
5.3 Snow Plowing: Contractor shall plow accumulated snow completely from paved surfaces to ensure painted traffic markings on the pavement are readily identifiable to vehicle operators. Contractor shall plow snow almost completely, leaving 2 to 4 inches of snow on the surface, when plowing aggregate surfaces to ensure that aggregate is not lost off the roadbed. All damage by the Contractor to Government property due to performance of snow and ice removal operations shall be repaired or replaced by the Contractor at no additional cost to the Government. The Contractor shall not blow or push snow into other roads or intersections. The Contractor shall start removal within 24-48 hours of notification from the COR.
5.4 Pavement Sweeping: Sweeping of dirt and debris shall be accomplished over the entire width of the paved road.
Sweeping shall expose any existing pavement striping of the center stripe or fog lines. Swept debris shall be deposited beyond the outer edges of the road shoulders, avoiding creation of windrows, blocking of ditch lines, and blocking of culverts or catch basins.
5.5 Shoulder Maintenance: The Contractor shall maintain unpaved shoulders adjacent to paved road traveled way.
Blade and shape existing shoulder material the entire width to drain away from the traveled way. Compact the shoulder adjacent to the paved surface edge providing a smooth transition between pavement and shoulder. Road grader wheels may be used for this compaction. Cleaning the paved surface during or after shoulder work is incidental to shoulder maintenance.
5.6 Bridge Maintenance: Bridge decks and curbs shall be cleared of dirt and debris in a manner that minimizes sediment from entering into the water channel being spanned. Accumulated material shall be swept from the deck and disposed of a minimum 100-feet from any stream channel. Drainage holes shall be fully opened. To minimize sediment entering the stream channel below, cleaning shall not be accomplished with water or compressed air. Clear vegetation from bridge rails and transition railing that is over 6 inches in height or hanging within 10 feet of the bridge rails and transition railings and the bridge. Cut vegetation and berry vines and remove trees and large vegetation that is within 5 ft of bridge. Maintain aggregate approaches a minimum of 40’ out from each abutment, removing potholes and shaping surfaces to provide a smooth transition onto the bridge and drainage away from abutment.
5.7 Slide Removal: Remove slide material to the slope angle to restore the original cut slope. At the same time, restore blocked ditches, catch basins, culvert inlets, running surface, shoulders, and turnouts. The waste material shall not be placed within 100 feet of any live stream, at cross-drain locations, on slopes exceeding 60%, or upon slopes exhibiting signs of instability, as determined by the COR. Side-cast material shall not be accumulated, rather spread over a broad area to minimize impacts. When excavation amounts warrant it, the excavated material shall be hauled to an approved waste site. Waste sites shall be shaped to drain and stabilized as directed by the COR.
5.7A Slide Removal <200 CY: Removal of slides with an estimated quantity of less than 200 CY 5.7B Slide Removal >200 CY: Removal of slides with an estimated quantity of greater than 200 CY
5.8 Maintain/Restore Ditch Lines, Catch Basins, and Outlet Channels: Minor maintenance of ditches and free flow from the road surface to the ditch shall be established with grading operations. Larger accumulations of debris in the drainage structures including leaf litter, limbs, tree tops, boulders, small slides or slough, and other debris shall be removed to promote water flow to the appropriate drainage structure under this line item. Ditch depth shall be a minimum 1-foot deep upon completion. All accumulated debris at culvert inlet and outlet shall be removed. Culvert catch basins shall be restored to a depth matching the bottom of the associated culvert, and to a minimum width equaling the diameter of the culvert. Outlet channels shall be open to a minimum width equaling the diameter of the culvert and shall be sloped away from the outlet a minimum of 3% gradient. Debris removal shall be conducted in a manner that does not undercut existing cutbanks, as raveling or slides may unintentionally be induced. The waste material shall not be placed within 100 feet of culvert outlets and streams, or areas of instable side-slopes.
5.9 Clean Culverts: Cross-drains shall be cleared of debris when directed in the TO. Work shall be accomplished during the dry season, and sediment traps or other BMP’s shall be utilized to prevent erosion at the outlet. Stream crossing culverts shall be cleared as described and during the time directed in the TO.
5.10 Hazard Removal from Road: Hazards shall be removed, in their entirety, and scattered beyond the limits of the road prism unless otherwise stated in the TO or advised by the COR.
5.10A Boulder, Stump, Etc. ≤ 5CY: Stumps, root-wads, boulders and other obstacles which have fallen in the roadway, and too large to remove during grading operations but are less than or equal to 5CY, shall be cleared in their entirety and scattered beyond the limits of the road prism.
5.10B Boulder, Stump, Etc. > 5CY: Stumps, root-wads, boulders and other obstacles which have fallen in the roadway and larger than 5CY, shall be cleared in their entirety and scattered beyond the limits of the road prism.
5.10C Blowdown ≤ 24” Diameter: Fallen trees, treetops, and other woody debris which has fallen in the roadway and is too large to remove during grading operations and less than or equal to 24” diameter, shall be cleared in their entirety and scattered beyond the limits of the road prism, piled on site for woodcutters, or limbed and bucked to specified lengths and decked for future sale. Disposal sites shall be adjacent to the tree's original location if reasonable and safe.
5.10D Blowdown >”24 Diameter: Fallen trees, treetops, and other woody debris which has fallen in the roadway, and is greater than 24” diameter, shall be cleared in their entirety and scattered beyond the limits of the road prism, piled on site for woodcutters, or limbed and bucked to specified lengths and decked for future sale. Disposal sites shall be adjacent to the tree's original location if reasonable and safe.
5.10E Standing Hazard Tree ≤ 36” DBH: Leaning, root sprung, and other hazard trees less than or equal to 36” DBH shall be cut and cleared and disposed of. Disposal methods shall be specified and may include; scattering debris beyond the limits of the road prism, piled on site for woodcutters, or limbed and bucked to specified lengths and decked for future sale.
Disposal sites shall be adjacent to the tree's original location if reasonable and safe.
5.10F Standing Hazard Tree >36” DBH: Leaning, root sprung, and other hazard trees greater than 36” DBH shall be cut and cleared and disposed of. Disposal methods shall be specified and may include; scattering debris beyond the limits of the road prism, piled on site for woodcutters, or limbed and bucked to specified lengths and decked for future sale. Disposal sites shall be adjacent to the tree's original location if reasonable and safe.
5.11 Roadside Brushing: This work consists of the cutting and removal of vegetation from the road prism, cut and fill slopes, overhanging limbs, and the inside of curves in accordance with these specifications. This work shall conform to the lines, grades and dimensions, and typical cross sections as shown on the Roadside Brushing Detail, at the designated locations shown on the plans. A minimum 14-foot clearing height, as measured from the roadbed, is required over the full width of the brushed area. Tree limbs shall be cut, not broken off, to within 2 inches of the trunk. The work shall be completed in a manner that avoids damaging the tree trunk. Vegetation cut less than 6 inches in diameter when measured 6 inches above the ground shall be cut to a maximum height of 4 inches above the ground surface or above obstructions such as rocks or stumps on cut and fill slopes. Slash shall be removed from the roadbed, shoulders, ditches, culvert inlets and outlets and their associated channels. Accumulations of slash shall be removed from cut-slopes and fill-slopes when the pieces aren’t laying flush against the ground. The generated slash shall be scattered on the downhill side of the road and outside of the clearing limits in a manner that avoids concentrations, will not result in damage to standing trees, and will not restrict water flow in ditches, at inlets and outlets of culverts, or within stream channels.
5.11A Mowing: Mechanical mowing includes cutting roadside vegetation consisting predominantly of grasses, ferns, and other small-stemmed plants. Short stretches (consisting of less than 10% of the total cut area) of small diameter brush may be included as mechanical mowing. Generally, vegetation can remain in place after cutting. Mowing operations will not require limbing of trees and will not require cutting of the clearing height above the roadbed.
5.11B Light: Light brush includes a mix of smaller, easily cut shrubs, grasses, forbs, and saplings which require little, if any, cleanup. Little limbing of roadside trees will be necessary. Limbs that do require removal will generally be small diameter.
5.11C Medium: Medium brush includes thicker and heavier vegetation, which is encroaching upon, and narrowing the traveled way. Cleanup is required to clear the running surface, ditches, and culvert ends. Light to medium amounts of tree limbing will be required.
5.11D Heavy: Heavy brush includes thick vegetation which has encroached upon the travelled way of the road. Young trees up to 6-inches in diameter may need to be removed from the shoulders, ditches, culvert inlets and outlets and cut/fill slopes. Significant amounts of tree limbing will be required. Cleanup of slash and cut trees will be required.
5.12 Subgrade Sampling: This work consists of drilling or coring to ascertain the subsurface soil conditions within the road prism. Under the supervision of the COR, drilling or coring equipment shall be used to penetrate the surface and resistance shall be gauged through monitoring hydraulic or pneumatic pressure of the drill. The COR will record the results and the contractor shall provide pressure readings at predetermined incremental depths. Samples will be collected by the COR in conjunction with the recording of the pressure readings. The contractors’ equipment shall be able to reach depths up to 50’ using a 2-1/2” to 6” in diameter bit. The contractor will be responsible for backfilling and compacting drill or core holes. If water table is reached, then bentonite clay is required for backfill. For this task, BLM is responsible for retrieving pertinent information concerning utility easements.
5.12A Subgrade Sampling ≤ 10’: This task includes drilling or coring of depths less than or equal to 10 feet.
Contractor shall have adequate supply of ¼ minus crushed aggregate plus two 80-pound bags of granular bentonite clay for backfill.
5.12B Subgrade Sampling > 10’: This task includes drilling or coring of depths greater than 10 feet. Contractor shall have adequate supply of ¼ minus crushed aggregate plus four 80-pound bags of granular bentonite clay for backfill.
Performance Requirement Summary
PWS Reference Performance Standards Required Services
Surveillance Method and Performance Threshold
Equipment Equipment shall be weed free.
Make equipment available for inspection and approval before use.
Equipment under this Section shall be provided with a fully qualified operator.
All equipment shall maintain a distance of 100 feet or greater from live water when refueling
As provided in Part 5
Visual Inspection. No variance allowed.
Road Blading Surface defects such as pothole and ruts are removed from road surface by blading to below bottom of defect. Roadway is free of all surface irregularities that interfere with drainage. Maintain uniform 3% (+-0.5%) crown or super elevation section with smooth transition between each where previously established. Work towards establishing crown and super elevation on other sections.
Blade and shape road surface and prism.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Road Blading Road blading does not segregate material on the surface. Road surface re-compacts without rutting, berming or displacement.
Suspend operations and notify COR when soil moisture conditions are not favorable for obtaining a satisfactory result.
COR may elect to accept work outside of optimum moisture conditions and in such instance will authorize Contractor to proceed in writing.
Moisture content is suitable for acceptable road blading.
Visual Inspection. Variances allowed only upon written authorization from COR
Road Blading Side roads open to traffic are bladed for a minimum of 100 feet from the intersection to ensure smooth transitions. Turnouts are bladed to smooth transition with road section and contoured to drain water to ditch or fill slope.
Intersections and turnouts bladed.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 1% of road segment.
Road Blading Road segments being bladed are no longer than 2 miles in length.
Berms created during blading operations are removed from the roadway prior to the end of each day.
Working area lengths and overnight conditions.
Visual Inspection. No variance allowed.
Snow Plowing Side roads open to traffic are plowed a minimum of 100 feet from the intersection to ensure smooth transitions and maintain accessibility. Turnouts are plowed to maintain safe places to pull over or stop.
Intersections and turnouts.
Visual Inspection. No variance allowed.
Snow Plowing Snow is plowed to reveal fog lines or road edges.
Clearing width.
Visual Inspection. No variance allowed.
Pavement Sweeping
Debris is cleared to reveal fog lines or pavement edges.
Clearing width.
Visual Inspection. No variance allowed.
Pavement Sweeping
Where required by the Contracting Officer, flaggers shall be required to control traffic flow where project operations may be a safety concern to the workers and public. Flagging operations shall meet standards set by ODOT for all road ownerships.
Flaggers shall have radio communication between each other, and all other Contractor provided equipment that may affect public safety.
Traffic Control.
Visual Inspection. No variance allowed.
Cleaning Ditch Lines
Debris removal shall be conducted in a manner that does not undercut existing cutbanks.
Debris removal.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Cleaning Ditch Lines
Ditch depth shall be a minimum 1-foot deep.
Ditch depth. Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Cleaning Ditch Lines
All accumulated debris at culvert inlet and outlet shall be removed.
Culvert openings.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Cleaning Ditch Lines
Culvert catch basins shall be restored to a depth matching the bottom of the associated culvert, and to a minimum width equaling the diameter of the culvert.
Catch basins. Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Cleaning Ditch Lines
Free flow from the road surface to the ditch shall be established.
Road, shoulder, and ditch template.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Cleaning Ditch Lines
The waste material shall be placed 100 feet away from any live stream or culvert end, on slopes exceeding 60%, or upon slopes exhibiting signs of instability.
Waste sites. Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Slough and Slide Removal
Remove slough and slide material in the amounts, and to the slope angle to restore the original cut slope.
Debris removal.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 1% of road segment.
Slough and Slide Removal
Restore blocked ditches, catch basins, culvert inlets, running surface, and shoulders.
Debris removal.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 1% of road segment.
Cutting and Bucking of Fallen Trees
Fallen trees, tree tops, and other woody debris which has fallen on the road surface, ditch-line, or cut slopes shall be cleared and disposed.
Tree removal. Visual Inspection. No variance allowed.
Cutting and Bucking of Standing Hazard Trees
Leaning, root sprung, and other hazard trees shall be cut and disposed of.
Tree removal. Visual Inspection. No variance allowed.
Cleanup of Fallen and Standing Hazard Trees
Disposal methods shall be specified, and may include: scattering debris beyond the limits of the road prism, piled on site for woodcutters, or limbed and bucked to specified lengths and decked for future sale.
Debris removal.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 1% of road segment.
Waste Sites Clearing and earthwork activities shall be limited to areas marked in the field.
Waste site area.
Visual Inspection. No variance allowed.
Northwest Oregon Road Maintenance IDIQ, Salem, Oregon SOURCES SOUGHT NO. 140L4325Q0001 BLM Northwest Oregon District Page 12 of 2
Waste Sites During periods of use, waste sites shall be maintained to assure proper drainage and stability.
Waste site area.
Visual Inspection. No variance allowed.
Waste Sites While in use, material within the waste site shall be spread and compacted to retain maximum storage capacity.
Waste site area.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Waste Sites Prior to completing each entry, the waste site shall be sloped to drain, at a gentle enough gradient to discourage sloughing and scouring and may require seeding and mulching.
Waste site area.
Visual Inspection. Incidental variances allowed. Rework of segments required to remove all variances observed on greater than 5% of road segment.
Erosion Control Erosion controls such as jut netting, silt fences, straw and bark bags may be used individually or collectively to reduce surface erosion as directed by the Authorized Officer, or as stated on the SOW.
Erosion control devices.
Visual Inspection. No variance allowed.
| SECTION C – PERFORMANCE WORK STATEMENT (PWS) |
| PART 2 |
| PART 3 |
| PART 4 |
File details come from the government source that posted it. Updated .