Attachment 2 - Project locations and map.docx
DOCX document 122 KB Posted
- Attached to
- WELD COUNTY CHIPSEAL OIL SUPPLY
- Solicitation number
- B2500018
- Issued by
- Weld County, Colorado
About this file
Attachment 2 is a project locations document for Weld County, Colorado, specifically related to a road maintenance and chipseal oil supply project. The document details multiple road segments across various locations in Weld County, including specific road sections on highways 7, 17, 21, 33, 39, 70, and 87, with road lengths ranging from 5 to 26.5 miles. The project locations span areas near Johnstown, Greeley, Milliken, and Firestone, covering approximately 17 different road segments and intersections with state highways and county lines.
The attachment includes a reference to a project map (image1.png) and is directly linked to the Weld County Chipseal Oil Supply contract for the 2025 construction season. While specific pricing details are not provided in this document, the comprehensive list of road locations suggests a systematic approach to road maintenance and surface treatment across multiple county road segments. The project appears to be part of Weld County Public Works' infrastructure maintenance strategy, targeting chip sealing and road surface improvements across various municipal and state highway connections within the county.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID SPECS - CHIPSEAL OIL SUPPLY - 18.docx | DOCX document | |
| ATTACHMENT 1 - Project Special Provisions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 – Project Locations and Map
Project Locations:
| ROAD |
| LOCATION |
| 7 |
| 18-20 |
| 7 |
| 26-26.5 |
| 17 |
| SH66-Johnstown CL |
| 41 |
| 8-SH52 |
| 87 |
| US34-46.5 |
| 8 |
| 29-37 |
| 17 |
| 48.5-54 |
| 17 |
| 54-Greeley CL |
| 21 |
| 6 to 8 |
| WCPW bridge |
| Platte River |
| 70 |
| SH85-39 |
| 39 |
| 66-72? |
| 33 |
| SH392-74 |
| 10 |
| 5-7 |
| 46.5 |
| 19-Milliken CL |
| 50 |
| 59-61 |
| 17.75 |
| 74-Culdesac |
| 15 |
| 72-72.5 |
| 26 |
| 11.5-13 |
| 24.5 |
| I-25 FR-Firestone CL |
Project Map:
image1.png
File details come from the government source that posted it. Updated .