Attachment 2 Pricing Worksheet - Schedule of Items.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Reconstruction of Trail of 100 Giants Boardwalk & Freeman Creek, Sequoia National Forest, California
- Solicitation number
- 12970224R0050
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Pricing Worksheet for a federal contract opportunity issued by the U.S. Department of Agriculture Forest Service. The contract requires reconstruction of the Trail of 100 Giants Boardwalk and the Freeman Creek Trail Bridge in Sequoia National Forest, California.
The Trail of 100 Giants Boardwalk project involves construction of a 100-foot boardwalk with five 20-foot spans using glued laminated beams on existing concrete abutments and piers. The Freeman Creek Trail Bridge project includes construction of a new 20-foot long by 6-foot wide timber trail bridge with glued laminated beams on existing abutments. The contract has an estimated price range between $25,000 and $250,000. No pre-solicitation site visit is scheduled, but interested vendors are encouraged to scout haul routes and review California hauling regulations. The solicitation number is 12970224R0050.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
soi
| PRICING WORKSHEET - SCHEDULE OF ITEMS |
| SEQUOIA NATIONAL FOREST |
| COST PROPOSAL: TRAIL OF 100 GIANTS BOARDWALK | ||||||
| Pay Item | Description | Method of Meas | Unit | Quantity | Unit Price | Total |
| 151 (01) | Mobilization (includes bonding costs) | LSQ | LS | 1 | $ | ERROR:#VALUE! |
| 203 (01A) | Remove and Replace Existing Steel Connections | LSQ | LS | 1 | $ | ERROR:#VALUE! |
| 552 (02A) | Concrete Repair (Epoxy Inject Cracks and Dry Pack Damaged and Spalled Concrete); Remove one Undermined Abutment and Construct New Abutment 6' deep; Armor with 6 CY of Class 1 Riprap | LSQ | LS | 1 | $ | ERROR:#VALUE! |
| 557 (07A) | Treated Structural Timber Boardwalk with Glued Laminated Beams and Cable Railing System, Complete | AQ | LF | 100 | $ | ERROR:#VALUE! |
| SUBTOTAL FOR 100 GIANTS BOARDWALK = | ERROR:#VALUE! | |||||
| Enter Amount on Line 0001 (Page 3, Box E of SF 1442) |
| COST PROPOSAL: FREEMAN CREEK TRAIL BRIDGE | ||||||
| Pay Item | Description | Method of Meas | Unit | Quantity | Unit Price | Total |
| 151 (01) | Mobilization (includes bonding costs) | LSQ | LS | 1 | $ | ERROR:#VALUE! |
| 203 (01B) | Remove and Replace Existing Steel Connections | LSQ | LS | 1 | $ | ERROR:#VALUE! |
| 204 (01) | Minor Site Work - Reshape and Blend Trail for 15' on each Approach to Match New Trail Bridge Tread Elevation | LSQ | LS | 1 | $ | ERROR:#VALUE! |
| 552 (02B) | Structural Concrete - Construct New Raised Footing at Each Existing Footing Foundation | LSQ | LS | 1 | $ | ERROR:#VALUE! |
| 557 (07B) | Treated Structural Timber Bridge with Glued Laminated Beams including Geotextile and Aggregate or Drain System at Abutments, Complete | AQ | LF | 20 | $ | ERROR:#VALUE! |
| SUBTOTAL FOR FREEMAN CREEK TRAIL BRIDGE = | ERROR:#VALUE! | |||||
| Enter Amount on Line 0002 (Page 3, Box E of SF 1442) | ||||||
| TOTAL COST PROPOSAL = | ERROR:#VALUE! | |||||
| ENTER TOTAL IN BOX 17 OF SF 1442 |
12970224R0050 100 Giants Boardwalk & Freeman Creek Trail Bridge Reconstruction