This document is an Attachment 2 - Price Schedule for a Request for Quote (RFQ) for Unfriendly Fencing Replacement Services.
The RFQ requires the removal of approximately 2.2 miles of existing wildlife unfriendly fence, including woven wire and barbed wire, and the construction of approximately 2.15 miles of new 4-wire wildlife friendly fence with associated infrastructure such as stress panels, gates, and corner/end panels. The contractor will be responsible for all labor, materials, equipment, and tools required to effectively and efficiently complete the fence removal and replacement work within the Buffalo Field Office area.
The price schedule provides a detailed breakdown of the estimated quantities and unit costs for the various fence removal and construction activities, including labor, materials, and subtotals. Pricing will be based on actual quantities performed. A site visit is scheduled for August 20 and 22, 2024, and the solicitation number is 140L6224Q0051.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ
Attachment 2- Price Schedule
UNFRIENDLY FENCING REPLACEMENT SERVICES
PRICE SCHEDULE
Vendor Identification Vendor Name
Street Address
City, State, Zip Code
Telephone Number
Email Address
SAM Unique Entity ID (UEI)
LABOR:
| Item/ Description: |
| Quantity: |
| Unit: |
| Unit Cost: |
| Total Cost: |
| Remove Existing Fencing |
| 11740 |
| Ft |
| End Panel Removal |
| 36 |
| EA |
| Stress Panel Removal |
| 6 |
| EA |
| Corner Panel Removal |
| 4 |
| EA |
| Construct 4-Wire Fence |
| 11355 |
| Ft |
| Barbed Wire End Panel |
| 19 |
| EA |
| Barbed Wire Stress Panel |
| 40 |
| EA |
| Three-Post Barbed Wire Corner Panel |
| 8 |
| EA |
| Vehicle Gate Relocation |
| 6 |
| EA |
Construction Cost Subtotal:
MATERIALS:
| Item/ Description: |
| Quantity: |
| Unit: |
| Unit Cost: |
| Total Cost: |
| Barbed Wire |
| 27 |
| 1320’ rolls |
| Smooth Wire |
| 10 |
| 1320’ rolls |
| Gate Opener |
| 2 |
| EA |
| Misc Hardware |
| 3 |
| Per mile |
| Metal Capped Tubular Line Post |
| 142 |
| EA |
| T- Post |
| 567 |
| EA |
| T- Post Fence Clips (500 bag) |
| 5 |
| EA |
| Corner Panels |
| 8 |
| EA |
| End Panels |
| 19 |
| EA |
| Stress Panels |
| 40 |
| EA |
| Deadman |
| 3 |
| EA |
Materials Cost Subtotal:
Note: Contractor will only be paid for actual quantities performed.