These are the plan documents for the Hiner Spring Quarry Development project, located in the White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado. The five-sheet plan set details the quarry development, including a project location map, site details, grading profile, sections, and drain dip typical sections. The project involves developing a quarry within an existing disturbed area to produce approximately 24,000 cubic yards of surface course gradation aggregate using crushing and screening methods. Controlled blasting may be required for production and oversize material. The project is estimated to cost between $250,000 and $500,000, will be a total small business set-aside, and is scheduled for performance from June 16, 2025, through October 15, 2025.
The plans provide technical specifications for quarry development, including grading requirements, stockpile details, and drainage considerations. The quarry is located off Forest Road 601.1, with GPS coordinates of 39.8374358, -107.5649245. The material source contains basalt and other igneous rock, with a planned grading design calculating an in-place volume of approximately 25,000 cubic yards. The contractor will be required to shape the quarry to drain to the west, with no areas left to impound water, and must follow specific guidelines for excavation, blasting, and site restoration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION MAP
FOREST LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture Forest Service
XXX
HINER SPRING QUARRY DEVELOPMENT
XXX
The Hiner Spring Quarry is located off Forest Road 601.1 (Blair Mountain), approximately 1.12 miles South-East from the intersection of Forest Road 245.1 (Buford - New Castle).
Latitude; 39.8374358, Longitude; -107.5649245
From New Castle, Colorado, turn North on 7th/ street and continue onto county road 245 for 29.1 miles. Turn Right onto Forest Road 601 towards Meadow Lake and continue for 1.3 miles and turn left onto the Hiner Spring Quarry access road.
3/4 /25
:3
5 B
CO
NA
NT
D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
HI
NE
RP
IT
DE
VE
LO
PM
EN
T\
CO
NT
RA
CT
PR
EP
\C
ON
TR
AC
TA
TT
AC
HM
EN
TS
\P
LA
NS
\01 _H
IN
ER
_S
PR
IN
G_
QU
AR
RY
_T
IT
LE
&M
AP
S_
.D
W G;
COLORADO
RIO BLANCO
(R02) ROCKY MOUNTAIN REGION
WHITE RIVER NATIONAL FOREST
BLANCO RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
1 COVERSHEET AND MAPS 2/26/2025
2 ESTIMATE OF QUANTITIES AND GENERAL NOTES 2/26/2025
3 QUARRY SITE, AND STOCKPILING DETAILS 2/26/2025
4 QUARRY GRADING, PROFILE, AND SECTIONS 2/26/2025
5 DRAIN DIP TYPICAL 2/26/2025
COUNTY
RIO BLANCO
TO MEEKER
PROJECT LICATION
INTERSTATE
MEEKER
NEW CASTLE GLENWOOD
SPRINGS
PROJECT
LOCATION
MAP AREA
QUARRY SITE INFORMATION
SITE NUMBER SITE NAME LATITUDE LONGITUDE
240 HINER SPRING QUARRY 39.8374358° -107.5649245°
Miles
T.2S., R.91W., 06
TO NEW CASTLE
MEADOW
LAKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/6 /25
:2
9 B
CO
NA
NT
D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
HI
NE
RP
IT
DE
VE
LO
PM
EN
T\
CO
NT
RA
CT
PR
EP
\C
ON
TR
AC
TA
TT
AC
HM
EN
TS
\P
LA
NS
\02 _E
OQ
_N
OT
ES
.D W
G;
R02
ROCKY MOUNTAIN REGION
HINER SPRING
QUARRY
DEVELOPMENT
WHITE RIVER
NATIONAL FOREST
RIO BLANCO RANGER DISTRICT
GENERAL NOTES &
ESTIMATE OF
QUANTITIES
2/26/2025 -
B.CONANT
B.CONANT
D.WOOLLEY
2 5
GENERAL NOTES:
SPECIFICATIONS: THE WORK SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14 - US
CUSTOMARY UNITS AND FOREST SERVICE SUPPLEMENTAL SPECIFICATION (FSSS) AS MODIFIED FOR
THIS CONTRACT.
INSPECTION AND ACCEPTANCE: FINAL ACCEPTANCE DEPENDS ON AGGREGATE MATERIALS AND
STOCKPILING MEETING SPECIFICATIONS, FUNCTIONALITY OF DRAINAGE UPON COMPLETION OF
OPERATIONS, AND FINAL CLEANUP.
UTILITIES: UTILITIES ARE NOT ANTICIPATED, BUT VERIFICATION IS THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING, PROTECTING, MAINTAINING
SERVICE, AND COORDINATING OUTAGES OF EXISTING UTILITIES THROUGHOUT THE TERM OF THE
CONTRACT.
PUBLIC TRAFFIC, ROAD CLOSURES, AND SIGNING: ROAD CLOSURES, AND TEMPORARY TRAFFIC
CONTROL AND SIGNING (FSSS 156) IS INDIRECTLY INCLUDED IN ITEM 15101. CONTROL PUBLIC TRAFFIC IN ACCORDANCE WITH FSSS 156. PRIOR TO CLOSING ROADS DURING CONSTRUCTION, GIVE
WRITTEN NOTICE TO THE CONTRACTING OFFICER AT LEAST 10 DAYS IN ADVANCE.
CONTRACTOR STAGING AREA: ALL CONTRACTOR STAGING AREAS SHALL BE APPROVED IN WRITING
BY THE CO PRIOR TO MOBILIZATION.
WATER SOURCES: PROJECT WATER SOURCES WILL BE DESIGNATED IN WRITING BY THE CO. PUMP
INTAKES USED FOR WITHDRAWING WATER FROM FISH-BEARING WATER BODIES SHALL BE
SCREENED WITH MATERIAL THAT HAS OPENINGS NO LARGER THAN 5/64-IN FOR SQUARE OPENINGS, MEASURED SIDE TO SIDE, OR 3/32-IN DIA FOR ROUND OPENINGS. THE SCREEN MUST HAVE AT LEAST ONE (1) SQUARE INCH OF FUNCTIONAL SCREEN AREA FOR EVERY GALLON PER MINUTE OF
WATER DRAWN THROUGH IT.
EXCAVATION LIMITS: LIMITS SHALL BE MARKED BY THE FOREST SERVICE PRIOR TO BEGINNING
WORK.
EXCAVATION: ANY EXCESS AND UNSUITABLE EXCAVATION SHALL BE DISPOSED OF IN NEARBY
LOCATIONS AS APPROVED BY THE CO.
DRAINAGE FEATURE STAKING: FEATURES SHALL BE STAKED BY THE FOREST SERVICE PRIOR TO
BEGINNING WORK..
GOVERNMENT FURNISHED MATERIAL: THE FOLLOWING ITEMS INCLUDE GOVERNMENT FURNISHED
MATERIAL.
· ITEM 31401 MATERIAL SOURCE - HINER SPRING QUARRY, SITE 240
PAY ITEM 15713 - SOIL EROSION & POLLUTION CONTROL INCLUDES:
· PLAN, SOIL EROSION, POLLUTION, DUST CONTROL, AND INTERIM RECLAMATION OF THE PIT, THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH FP-14 AND FSSS SECTION 157 AND
THE PLANS.
PAY ITEM 20501 - CONTROLLED BLASTING (OPTION) INCLUDES:
· ALL REQUIRED REPORTS, PLANS, TESTING, AND MONITORING IN ACCORDANCE WITH FP-14 AND
FSSS SECTION 205.
· QUALIFICATIONS FOR APPROVED PERSONNEL
· BLASTING PLAN
PAY ITEM 31401 - STOCKPILED AGGREGATE, SURFACE GRADATION (FSSS 703-3) INCLUDES:
· ESTABLISH AND PREPARE STOCKPILE SITES AT LOCATIONS APPROVED BY THE CO AND SHOWN
ON THE PLANS.
· PRODUCING AGGREGATE BY SCREENING OR CRUSHING METHODS.
· HANDLE AND STOCKPILE ACCORDING TO SECTION 314 AND THE PLANS.
· MATERIAL SAMPLING, TESTING, AND ACCEPTANCE ACCORDING TO FSSS 703.05.
· GRADING DESIGNATION - SURFACE COURSE GRADATION (FSSS 703-3)
· DEVELOPING WATER SUPPLY AND WATERING IS INDIRECTLY INCLUDED IN ITEM 31402. WATER
SOURCES ARE TO BE DESIGNATED AND APPROVED BY THE CO PRIOR TO USE.
ABBREVIATIONS:
AC = ACRE
AGG = AGGREGATE
BOP = BEGINNING OF PROJECT
CMP = CORRUGATED METAL PIPE
CO = CONTRACTING OFFICER
COR = CONTRACTING OFFICER REPRESENTATIVE
CG = CATTLE GUARD
CY = CUBIC YARD
CCY = COMPACTED CUBIC YARDS
DIA = DIAMETER
EA = EACH
EOP = END OF PROJECT
FP = FEDERAL PROJECT
FS = FOREST SERVICE
FT = FEET
GFM = GOVERNMENT FURNISHED MATERIAL
IN = INCH
INT = INTERSECTION
LD = REINFORCED LOG DIP
LF = LINEAR FEET
LOD = LEAD OUT DITCH
LS = LUMP SUM
MI = MILE
MIN = MINIMUM
NFSR = NATIONAL FOREST SERVICE ROAD
NTS = NOT TO SCALE
RD = ROLLING DIP
RP = REFERENCE POINT
RWB = REMOVE WATER BAR
SY = SQUARE YARDS
NOTES:
(1) PARTIAL QUANTITIES FROM THE BASE AND/OR OPTION ITEM(S) MAY BE ORDERED.
(2) PAY UNITS MARKED * ARE CONTRACT QUANTITIES. CONTRACT QUANTITIES ARE MEASURED IN
ACCORDANCE WITH FP-14 AND FSSS 109.02.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
4+00
4+50
5+00
5+20
0+50.00
1+50.00
2+50.00
3+50.00
4+25.00
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/6 /25
:3
4 B
CO
NA
NT
D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
HI
NE
RP
IT
DE
VE
LO
PM
EN
T\
CO
NT
RA
CT
PR
EP
\C
ON
TR
AC
TA
TT
AC
HM
EN
TS
\P
LA
NS
\03 _0
4_
QU
AR
RY
_S
IT
E_
AN
D_
GR
AD
IN
G.
DW
G;
R02
ROCKY MOUNTAIN REGION
HINER SPRING
QUARRY
DEVELOPMENT
WHITE RIVER
NATIONAL FOREST
RIO BLANCO RANGER DISTRICT
QUARRY SITE, AND
STOCKPILING DETAILS
2/26/2025 -
B.CONANT
B.CONANT
D.WOOLLEY
3 5
GENERAL NOTES:
1. THE MATERIAL SOURCE CONTAINS BASALT AND OTHER IGNEOUS ROCK.
2. PARTIAL QUANTITIES FROM THE BASE AND/OR OPTION ITEM(S) MAY BE ORDERED. THE
MAXIMUM QUANTITY OF STOCKPILED AGGREGATE ORDERED UNDER THIS CONTRACT IS
24,000 CUBIC YARDS.
3. THE GRADING DESIGN SHOWN ON SHEETS 3 AND 4 CALCULATES AN IN-PLACE VOLUME ≈
25,000 CUBIC YARDS.
4. GRADING AND SHAPING OF THE QUARRY SHOWN ON SHEETS 3 AND 4 IS SUBJECT TO
CHANGE BASED ON FINAL QUANTITIES ORDERED.
5. FINAL GRADING AND SHAPING OF THE QUARRY SHALL BE AGREED UPON IN WRITING.
6. THE QUARRY SHALL BE SHAPED TO DRAIN TO THE WEST, AND NO AREAS SHALL BE LEFT
TO HOLD/ IMPOUND WATER.
7. PRODUCE STOCKPILED AGGREGATE MATERIALS IN ACCORDANCE WITH FP-14 SECTION
314 AND FSSS TABLE 703-3, LIMITS FOR SURFACE COURSE GRADATION AND PLASTICITY.
THE MATERIAL SHALL BE SAMPLED AND TESTED IN ACCORDANCE WITH FSSS SECTION
703.05. SUBMIT TESTING AND SAMPLING REPORTS AFTER A REPRESENTATIVE QUANTITY
OF AGGREGATE IS PRODUCED, AND PROVIDE A TEST FOR EVERY 2500 CUBIC YARDS
STOCKPILED.
8. THE FINAL STOCKPILE SITE(S) SHALL BE APPROVED IN WRITING PRIOR TO BEGINNING
CRUSHING OPERATIONS. MATERIAL PRODUCED UNDER THIS CONTRACT SHALL NOT HAVE
CONTACT WITH EXISTING STOCKPILES.
9. THE GOVERNMENT ESTIMATES A SWELL FACTOR OF 30% (IN-PLACE TO CRUSHED), AND
LOSS FACTORS OF APPROXIMATELY 5% IN STOCKPILING AND 20% IN CRUSHING. THE
QUANTITIES SHOWN IN THE SCHEDULE OF ITEMS DO NOT INCLUDE LOSSES FOR
STOCKPILING AND CRUSHING AND ARE FINAL ACCEPTED MATERIAL QUANTITIES.
10. THE EXTENTS OF DISTURBANCE FOR THIS PROJECT ARE SHOWN ON THIS PAGE (SHEET 3)
AND WILL BE MARKED ON THE GROUND BY THE FOREST SERVICE. THE CONTRACTOR MAY
ONLY EXCAVATE WITHIN THIS BOUNDARY, AND SHALL SLOPE ALL EXCAVATED FACES TO
1V:1.5H, SEE NOTE 11 FOR BLASTING REQUIREMENTS.
11. BLASTING MAY BE NECESSARY FOR THIS WORK, AND THE FOLLOWING REQUIREMENTS
SHALL BE MET IF BLASTING IS ORDERED:
11.1. FP-14 SECTION 205 AND FSSS 205 APPLY TO THIS WORK.
11.2. EXACT BLASTING SITE LOCATION AND DIMENSIONS SHALL BE DETERMINED BY THE
CO AND THE CONTRACTOR ON SITE.
11.3. ALL BLASTED SLOPES SHALL BE LEFT IN A STABLE CONDITION.
11.4. REMOVE ANY OVERBURDEN SOIL AND LOOSE ROCK ALONG THE TOPE OF THE BLAST
AREA FOR 30 FEET BEYOND THE HOLE DRILLING LIMITS.
11.5. SEE TYPICAL BENCH DETAILS ON SHEET 4, THIS APPLIES TO SOLID ROCK FACES
ONLY.
12. THE QUARRY WILL BE DEVELOPED WITHIN THE EXISTING DISTURBANCE, THE FOREST
SERVICE WILL MARK THESE LIMITS ON THE GROUND.
13. MINIMAL TO NO NEW CLEARING OR GRUBBING OF VEGETATION IS ANTICIPATED FOR THIS
WORK, IF NEEDED, THE WORK IS INCLUDED IN ITEM 31401.
14. IN THE EVENT TOPSOIL IS ENCOUNTERED, WINDROWING IS INCLUDED IN ITEM 31401,
WINDROW NEAR THE EXCAVATION LIMITS, IN ACCORDANCE WITH FSSS 204.05
"CONSERVED TOPSOIL".
15. INSTALL ROAD DRAIN DIPS AT LOCATIONS MARKED ON THE GROUND BY THE CO,
APPROXIMATE LOCATIONS ARE SHOWN ON SHEET 4.
QUARRY DEVELOPMENT
AREA / PROPOSED GRADING
EXISTING STOCKPILE
APPROXIMATE DRAIN
DIP LOCATIONS
3' MAX. LIFT LAYER,
SIDE SLOPES NOT FLATTER
THAN 1V:1.5H
6" COMPACTED, USE EXISTING STOCKPILE MATERIAL
COMPACTION METHOD C (FSSS 204.11)
Scale: NTS
STOCKPILE DETAIL TYP.2
1.5
1.5
Feet
Scale: 1"=100'
QUARRY SITE DETAILS1
EXISTING AREA OF
DISTURBANCE
PROPOSED
GRADING
EXTENTS
PROPOSED
STOCKPILE AREA
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
EL
EV
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
STATION (FEET)
QUARRY PROFILE
VERTICAL EXAGGERATION = 2.000
10000
10010
10020
10030
10040
10050
10060
10070
10000
10010
10020
10030
10040
10050
10060
10070
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+20
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
SECTION: 0+50.00
10000
10010
10020
10030
10040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
SECTION: 1+50.00
10000
10010
10020
10030
10040
10050
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
SECTION: 2+50.00
10000
10010
10020
10030
10040
10050
10060
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
SECTION: 3+50.00
10010
10020
10030
10040
10050
10060
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
SECTION: 4+25.00
10010
10020
10030
10040
10050
10060
10070
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/6 /25
:4
2 B
CO
NA
NT
D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
HI
NE
RP
IT
DE
VE
LO
PM
EN
T\
CO
NT
RA
CT
PR
EP
\C
ON
TR
AC
TA
TT
AC
HM
EN
TS
\P
LA
NS
\03 _0
4_
QU
AR
RY
_S
IT
E_
AN
D_
GR
AD
IN
G.
DW
G;
R02
ROCKY MOUNTAIN REGION
HINER SPRING
QUARRY
DEVELOPMENT
WHITE RIVER
NATIONAL FOREST
RIO BLANCO RANGER DISTRICT
QUARRY GRADING,
PROFILE, AND SECTIONS
2/26/2025 -
B.CONANT
B.CONANT
D.WOOLLEY
4 5
GENERAL NOTES:
1. THE GRADING DESIGN SHOWN ON SHEETS 3-4 CALCULATES AN IN-PLACE VOLUME ≈
25,000 CUBIC YARDS.
2. GRADING AND SHAPING OF THE QUARRY SHOWN ON SHEETS 3 AND 4 IS SUBJECT TO
CHANGE BASED ON FINAL QUANTITIES ORDERED.
3. FINAL GRADING AND SHAPING OF THE QUARRY SHALL BE AGREED UPON IN WRITING.
4. THE QUARRY SHALL BE SHAPED TO DRAIN TO THE WEST, AND NO AREAS SHALL BE
LEFT TO HOLD/ IMPOUND WATER.
5. EXCAVATE NON-BLASTED SIDE SLOPES AT 1V:1.5H.
6. BLASTED SLOPES SHALL BE 4V:1H, WITH BENCHES NO TALLER THAN 20' FEET, AND
NO WIDER THAN 15' FEET. SEE DETAIL 1 BELOW FOR BENCHING.
7. BLASTED FLOORS SHALL BE SLOPED AT 2% MINIMUM FOR DRAINAGE, SEE BENCH
DETAIL BELOW.
EXISTING GROUND
PROPOSED GRADING,
APPROXIMATELY 9% SLOPE
EXISTING GROUND
PROPOSED GRADING
EXISTING GROUND
PROPOSED GRADING
EXISTING GROUND
PROPOSED GRADING
EXISTING GROUND
PROPOSED GRADING
EXISTING GROUND
PROPOSED GRADING
Scale: NTS
BENCH DETAIL (SOLID ROCK ONLY) TYP.1
BLASTED
FACE SLOPE
4V:1H MAX.
BLASTED FLOOR
TO SLOPE 2% MIN.
FOR DRAINAGE
' M
AX
15' MAX.
1.5
1.5
1.5
1.5
1.5
1.5
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAINLINE
0 TO 25° SKEW
DOWNGRADE
PLAN VIEWOUTSLOPE TO
DRAIN 2% TO 4%
REVERSE GRADE STEEPENED GRADE
REVERSE
GRADE
STEEPENED
GRADE
0-25°
OUTSLOPE TO 2%
DOWNGRADE
REVERSE
GRADE STEEPENED GRADE
BOTTOM OF DIP
(NOTE 1)
0.
5'
M
IN
.EXISTING ROAD
PROFILE
DIP PROFILE
COMPACTED BERM
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/6 /25
:5
0 B
CO
NA
NT
D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
HI
NE
RP
IT
DE
VE
LO
PM
EN
T\
CO
NT
RA
CT
PR
EP
\C
ON
TR
AC
TA
TT
AC
HM
EN
TS
\P
LA
NS
\05 _D
RA
IN
_D
IP
_T
YP
IC
AL
.D W
G;
R02
ROCKY MOUNTAIN REGION
HINER SPRING
QUARRY
DEVELOPMENT
WHITE RIVER
NATIONAL FOREST
RIO BLANCO RANGER DISTRICT
DRAIN DIP TYPICAL
SECTION
2/26/2025 -
B.CONANT
B.CONANT
D.WOOLLEY
5 5
1. DIP INLET ELEVATION TO MATCH DITCH ELEVATION.
2. THE CROSS SLOPE OF THE ROADBED SHALL BE MAINTAINED THROUGH THE DIP.
3. REVERSE GRADE SHALL BE 3-6%.
4. DIP SHALL BE CONSTRUCTED WITH CUT-FILL BALANCE (I.E. NO BORROW MATERIAL OR EXCESS MATERIAL IS ANTICIPATED).
PERCENT
ROAD GRADE
STEEPENED
GRADE LENGTH
REVERSE GRADE
LENGTH
HORIZONTAL MEASURE (FT)
<6 55 15 - 20
8 65 15 - 20
10 75 15 - 20
12 85 20 - 25
>12 100 20 - 25
Scale: NTS DRAIN DIP PROFILE TYP.1 Scale: NTS
DRAIN DIP PERSPECTIVE TYP.2
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| 01_COVERSHEET_MAPS |
| 02_EOQ_NOTES |
| 03_SITE_DETAILS |
| 04_GRADING_DETAILS |
| 05_DRAIN_DIP_TYPICAL |
| 2025-03-06T15:40:22-0700 | |
| DANIEL WOOLLEY |
| 2025-03-07T16:19:19-0700 | |
| KEVIN WARNER |
| 2025-03-10T10:27:38-0600 | |
| CURTIS KEETCH |
File details come from the government source that posted it. Updated .