Attachment 2 - Photos (reference only).pdf
PDF 3 MB Posted
- Solicitation number
- 697DCK-23-R-00419
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAA
Engineering Services Anchorage Enroute/FSS Engineering Center
Barrow FSS HVAC Upgrade
JCN: 18062636
Photo Exhibits
Table of Figures Figure 1: Barrow FSS as seen from the North Figure 2: Barrow FSS as seen from the Northeast Figure 3: Barrow FSS as seen from the Northwest with proposed equipment location shown Figure 4: General condition of exposed natural gas piping Figure 5: Under floor natural gas piping to be replaced Figure 6: Underfloor natural gas piping to be replaced Figure 7: FSS Electronics Equipment Room (Level 1) Figure 8: FSS Electronics Equipment Racks – Front Figure 9:FSS Electronics Equipment Racks - Back Figure 10: Electronics Equipment Room / Tech Ops workspace Figure 11: Electronics Equipment Room / Tech Ops work area, with proposed location of indoor AC unit identified Figure 12: Furnace/Utility Room Figure 13: Existing Drain termination in Furnace/Utility Room Figure 14: FSS Operations Area as seen from top of stairs Figure 15: FSS Operations Area looking toward pilot briefing counter and stairs. Proposed position of indoor air conditioning unit is indicated Figure 16: Kitchen range hood with exhaust air ductwork through wall to above bathroom ceiling space.
Figure 17: Combined kitchen and bathroom exhaust air ductwork about bathroom ceiling Figure 18: Combined kitchen and bathroom exhaust air ductwork up through ceiling towards roof penetration Figure 19: Vent through roof
Figure 1: Barrow FSS as seen from the North
Figure 2: Barrow FSS as seen from the Northeast
Figure 3: Barrow FSS as seen from the Northwest with proposed equipment location shown.
Figure 4: General condition of exposed natural gas piping.
Figure 5: Under floor natural gas piping to be replaced.
Figure 6: Underfloor natural gas piping to be replaced.
Figure 7: FSS Electronics Equipment Room (Level 1)
Figure 8: FSS Electronics Equipment Racks – Front Figure 9:FSS Electronics Equipment Racks - Back
Figure 10: Electronics Equipment Room / Tech Ops workspace.
Figure 11: Electronics Equipment Room / Tech Ops work area, with proposed location of indoor AC unit identified.
Figure 12: Furnace/Utility Room
Figure 13: Existing Drain termination in Furnace/Utility Room
Figure 14: FSS Operations Area as seen from top of stairs
Figure 15: FSS Operations Area looking toward pilot briefing counter and stairs. Proposed position of indoor air conditioning unit is indicated.
Figure 16: Kitchen range hood with exhaust air ductwork through wall to above bathroom ceiling space.
Figure 17: Combined kitchen and bathroom exhaust air ductwork about bathroom ceiling.
Figure 18: Combined kitchen and bathroom exhaust air ductwork up through ceiling towards roof penetration.
Figure 19: Vent through roof.
File details come from the government source that posted it. Updated .