Attachment 2 - Performance Work Statement - TellCityCSE.doc
DOC document 161 KB Posted
- Solicitation number
- 12444522Q0026
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Maps Project Area - Vicinty.pdf | ||
| Attachment 1 - Schedule of Items - TellCityCSE.docx | DOCX document | |
| Attachment 6 - Experience Questionnaire.docx | DOCX document | |
| 12444522Q0026.docx | DOCX document | |
| Attachment 5 - Maps Lidar 1-4.pdf | ||
| Attachment 7 - Wage Determination.docx | DOCX document | |
| Attachment 4 - Maps Aerial 1-4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 – Performance Work Statement
SPECIFICATIONS
C. 1. INTRODUCTION.
C.1.1. Background.
The Hoosier National Forest proposes to contract for technical forestry services to conduct the field phase of a Common Stand Exam (CSE) project. Its purpose is to obtain the site and setting characteristics required to identify stand conditions and capabilities in providing the Government with sound information with which management determinations for natural resources will be made.
C.1.2. Scope of Contract .
Work shall consist of locating, establishing, measuring and recording data for overstory and understory sample plots. The Contractor shall furnish all personnel, materials, services, and facilities necessary for the project and performance of this contract. Contractor will arrive on site with a data collector ready to begin work. The work performed and the data collected shall be in compliance with the terms, specifications, conditions and provisions of this solicitation and the Hoosier Field Guide, Version 1.4.
C.1.3. Location and Description.
This solicitation is for Common Stand Exams on the Hoosier National Forest, Tell City Ranger District. Project work areas can be found on the attached vicinity area and stand maps.
Bid Item 0001, Base All plots identified as base items on the attached stand exam contract maps (1,200 total plots). This includes all plots identified in Locations 50 (390 plots), 44 (377), 49 (210), 45 (122), 47 (101). These stands are generally located east of Tell City, IN. The specific stands to be inventoried are located on the attached stand exam contract maps. Road access is via local county roads. There are Forest Service roads in the area, but they are generally not drivable.
Bid Item 0002,Option Item 1 All plots identified as optional items on the attached stand exam contract maps (105 total plots). These plots are all located in Location 38.
Bid Item 0003, Option Item 2 All plots identified as optional items on the attached stand exam contract maps (105 total plots). These plots are all located in Location 38.
Bid Item 0004, Option Item 3 All plots identified as optional items on the attached stand exam contract maps (100 total plots). These plots are all located in Location 39.
Bid Item 0005, Option Item 4 All plots identified as optional items on the attached stand exam contract maps (89 total plots). These plots are all located in Location 39.
C. 2. DEFINITIONS.
The following are definitions that refer to data elements and attributes for collecting Common Stand Exam data.
2D. Receiving horizontal and vertical readings from the satellite(s).
3D. Receiving horizontal, vertical and elevation readings from the satellite(s).
Almanac Data. Satellite constellation information (including location and health of satellite) that is transmitted to your receiver from every GPS satellite. Almanac data must be acquired before GPS navigation can begin.
Acquire. Receiving satellite signals for a determined amount of time or an established amount of hits.
Coordinate system. Provides a reference of precise positioning for navigation and geographic information systems.
Datum. Geodetic datum’s defines the size and shape of the earth used in mapping the earth.
Depauperate. The undergrowth is usually of sparse conditions resulting from dense shading or thick duff. This situation requires the adjustment of canopy coverage values in the key to the next lower class (for instance, “well represented” becomes “common”), or extrapolation from the nearest nondepauperate condition occurring on a comparable site.
Differential GPS. DGPS is an extension of the GPS system that uses land-based radio beacons to transmit position corrections to GPS receivers.
Estimated Time of Arrival (ETA). ETA is the time of day you arrive at a destination.
Estimated Time Enroute (ETE). ETE is the time between your last and final destination, at your present speed.
Latitude. The north/south measurement of position that is perpendicular to the earth’s polar axis.
Longitude. An east/west measurement of position in relation to the Prime Meridian, an imaginary circle that passes through the north and south poles.
Map Projection. Map projections are attempts to portray the surface of the earth or a portion of the earth on a flat surface.
Microsites. Microsites are small areas atypical of the stand, such as wind-throw pockets, micro-drainage ways, seeps, well-rotted logs, or excessively rocky areas.
Navigation. Navigation is the process of traveling from one place to another and knowing where you are in relation to your desired course.
Plot Data Form. The Plot Data form is used to collect data at the plot level and is independent of the information collected at the setting level. This data is collected individually for all sample plots in the stand.
pdr (.pdr) File. Personal Data Record is a file format containing filed data that has been created using ExamsPC software. The file extension is .pdr.
Position. An exact, unique location based on a geographic coordinate system.
Position Dilution of Precision (PDOP). PDOP is the position error that degrades position accuracy when satellites are being tracked.
Sample Design Form. The Sample Design form contains information about how the data was collected, which trees, shrubs and cover are measured, and how the measurements shall be converted to pre-acre values.
Selective Availability. Selective availability is a security technique that limits the accuracy of a receiver by broadcasting GPS information that contains built-in error.
Setting Data Form. The Setting Data form in used to collect data that uniquely identifies each stand.
Shape (.shp) File. Shape file is a format developed by ESRI and used in Arcinfo and other GIS packages. The file extension is .shp.
Stand. A stand is a community, particularly of trees, possessing sufficient uniformity as regards composition, age, spatial arrangement, or condition, to be distinguishable from adjacent communities, so forming a silvicultural or management entity.
Waypoint. A specific location saved in the receiver’s memory.
WPT (.wpt) File. WPT is a file format, developed by Oziexplorer, containing a list of waypoints that have been saved in the receiver’s memory. The file extension is .wpt.
=. Equal to.
<. Less than.
(. Less than equal to.
(. Greater than.
(. Greater than or equal to.
C. 3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
The Government shall provide the Contractor the following listed materials, supplies, property or services, for use in the performance of this contract, hereinafter referred to as Government-Furnished Property. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause, (Reference Clause 52.245-4).
| Item |
| Description |
| Where, When, How |
| 3.1 Project Area Map Set. |
| Map depicting all locations for the project area. |
| Provided |
| 3.2 National Forest Map. |
| Provides road closure information and locations. |
| Provided at Pre-work meeting. |
3.3 Access behind locked gates
| Some stands are behind Forest road closures (locked gated). The Government will provide access to stands behind locked gates at the pre-work. |
| During period stand is being examined. |
| 3.4 Stand Exam Inspection Form |
| Stand Exam Inspection Form provides information on quality of installed plots and Contractor payment results. |
| Provided |
| 3.5 Field Instructions Hoosier Common Stand Exam Field Guide |
| Field Instructions handbook for performing Common Stand Exams. |
| Provided |
3.6 ExamsPC Software
ExamsCE Software
| Handheld Personal Data Recorder software. |
| This software is downloadable at http://www.fs.fed.us/nrm/fsveg/index.shtml |
3.7 Flagging
Provided at Prework meeting.
| 3.8 Coordinate List |
| A listing of the coordinates for each plot to be completed. This can be provided in shape file form |
| Provided after the notice to proceed. |
All Government-Furnished items shall be returned to the Government upon completion of the contract. Failure to do so may result in charges for damages or replacement.
Services:
(a) At the Contractors request, the Government shall provide one review of the inspection procedures. This review shall be performed on one plot.
(b) At the Contractors request, the Government shall accompany the Contractor on one plot to review data collection procedures.
C. 4. CONTRACTOR WORK REQUIREMENTS and STANDARDS.
C.4.1. General.
C.4.1.1. Number of plots per Stand
The number of plots in which data will be collected is provided on the attached maps. Both understory and overstory data will be collected at each plot.
C.4.1.2. Site Index Trees
One site tree shall be taken per stand inventoried. Record the diameter, height, species, and age for each site tree. Select a site index tree of the proper species for the Forest Type and is one of the dominant or codominant trees within the stand. The age shall be determined by using an increment bore. Diameter of site trees shall be measured to a tenth of an inch. Age shall be the total rings counted. The increment bore should reach the pith of the tree. If the site index tree is not measured on an inventory plot, then record the GPS coordinate of the site. Increment cores shall be placed back in the hole made by the increment bore and the site tree flagged with two flags that go completely around the bole of the tree.
C.4.1.3. Contractor-Furnished Property
The Contractor shall use data recorders or a Windows tablet (Windows 7 or newer) capable of using the Exams software to collect stand exam data in the Common Stand Exam format (.pdr or .cse). The contractor shall also collect the inventoried plot locations using GPS that has the capability to locate the plot within + 10 meters of the actual plot location. The contractor shall provide the Government all inventory work and GPS’ed plot locations in an electronic format that is acceptable to the Government. If rework needs to be done within a stand the contractor will provide flagging (color has to be agreed upon by the COR).
C.4.1.4. Performance period.
Multiple award of items shall not change the required performance period for each item. If multiple items are awarded to one Offeror, the respective performance times shall run concurrently, not consecutively. Work may be performed on each item in succession, provided the required rate of progress is maintained. The Government shall issue a Notice to Proceed as soon as the weather and ground conditions are favorable for work. The count of contract time shall start on the date specified on the Notice to Proceed.
C.4.1.5. Rate of progress.
The Contractor shall maintain the rate of progress specified in the Contractor’s Resource Plan. The minimum acceptable rate of progress shall occur when the percent of work completed falls within 10 % of the time used.
C.4.1.6. Access.
The Forest Service assumes no obligation to plow snow or do special maintenance to keep roads open. Stands are accessible by some combination of 2 or 4-wheel drive vehicle and foot travel. The Contractor shall be responsible for obtaining all necessary permission, through privately owned land, to gain access to stand locations.
C.4.1.7. Locked gates
In cases where stands are behind locked gates, authorization for limited motorized use may be granted. All requests for motorized travel of closed roads must be submitted in writing to the COR for specific roads and specific periods of time. If access is granted behind a gate, the Contractor will be responsible to ensure that gates remain closed and locked at all times and will be subject to all other restrictions of administrative use. The Contractor shall be permitted to drive from the locked gate to the stand with only the minimum number of vehicles necessary for efficient transport of the crew. No firearms are permitted behind locked gates. No access to contractors or employees will be allowed behind locked gates after periods of work. Motorized access will not be permitted behind locked gates during hunting season of turkey or deer. Contractor shall adjust work schedule to take the closure time into consideration.
No Suspend Work Orders will be issued; contract time will run during this period. Any misuse of gates may constitute loss of privileges.
C.4.2. Plot Location and Establishment.
C.4.2.1. Plot Location.
. A list of sample plot locations (latitude and longitude coordinates) within each stand will be provided by the Government at the prework conference. These locations can also be provided in shape file formant at the contractor’s request.
Survey Technique – A global positioning system (GPS) shall be used to locate plot centers. Acceptable error is +/- 10 meters (33 feet) from plot center. Recurring errors in location of sample plots greater than the acceptable error shall make the stand survey unsatisfactory and relocation of sample plots and remeasurement shall be required.
The examiner should spend some time becoming familiar with the project area before beginning data collection. This should include a review of source documents and a general orientation to the area where the plots are being taken. At a minimum topographic maps, leaf-off photography (if available) and existing compartment records should be reviewed prior to the initial field visit.
The first field visit should include becoming familiar with major roads, streams and other physical features that can serve as reference points for future field days.
C.4.2.2. Plot Location Technique and Establishment.
The Contractor shall navigate to plot by utilizing a global positioning system. Plot centers for each plot will be identified on the ground as described below. The Government will provide coordinates for each plot after the notice to proceed. Flagging at plot center will be labeled with location number, stand number, and plot number. The flagging will be placed directly over the plot center or starting point on a branch or other available vegetation as close as possible to plot center. A stick will be placed at plot center with a 4” piece of flagging tied to it. Contractor should be sure the stick is in the ground as the plot center will be used when inspecting the contractor’s work.
Once plot center is established, the contractor shall start at True North and rotate clockwise when tallying trees. The first tree on the plot will be True North from plot center or the first tree encountered rotating in a clockwise manner from True North. The Contractor shall use the provided flagging to locate plot centers.
C.4.2.3. Plot Acquisition.
The Contractor shall acquire GPS coordinates for each plot center.
C.4.3. Common Stand Exam.
C.4.3.1. The Contractor shall locate, establish, measure and record data using variable and fixed radius subplots that shall be taken at each designated sample point. CSE data shall be collected and recorded in accordance with the Hoosier Field Guide unless specifically modified by this contract. The Contractor shall collect data necessary to complete the following forms, as specified in, Section C.4.4. – Data Collection.
C.4.3.2. The Contractor shall code all vegetation species in accordance with the Hoosier Field Guide.
C.4.3.3. A 1/750-acre plot (4.3’ radius) shall be used to determine trees less than 1” DBH and greater than 1’ tall. 10 BAF prism shall be used to estimate the trees greater than 1” DBH in hardwood stands. 10 BAF or 20 BAF prisms may be used to estimate trees greater than 1” DBH in pine dominated stands. All plots within a stand must use the same BAF.
C.4.4. Data Collection.
The following tables demonstrate the required fields for each form that is to be collected and recorded. All data shall be taken in accordance with the Hoosier Field Guide. An “X” in the Exam Level column indicates the required fields for this solicitation.
C.4.4.1. Setting Form.
The Setting Form shall be used to record stand measurements, stand comments, sample point locations (site sketch and traverse notes), as well as design parameters and references.
| Field Number |
| Field Name |
| Exam Level |
Quick Plot Data Source
| 1 |
| Project Name |
| X |
| Contractor |
| 2 |
| Region |
| X |
| Contractor |
| 3 |
| Proclaimed National Forest |
| X |
| Contractor |
| 4 |
| District |
| X |
| Contractor |
| 5 |
| Location |
| X |
| Contractor |
| 6 |
| Stand Number |
| X |
| Contractor |
| 7 |
| Owner |
| X |
| Contractor |
| 8 |
| State |
| X |
| Contractor |
| 9 |
| County |
| X |
| Contractor |
| 10 |
| Admin Forest |
| X |
| Contractor |
| 11 |
| Date |
| X |
| Contractor |
| 12 |
| Exam Purpose |
| X |
| Contractor |
| 13 |
| Acres |
| X |
| Provided by Government |
| 14 |
| Examiner |
| X |
| Contractor |
| 15 |
| Setting Remarks |
| X |
| Contractor |
| 16 |
| Examination Level |
| X |
| Contractor |
| 17 |
| Precision Protocol |
| X |
| Contractor |
C.4.4.2. Sample design.
The Sample Design Form shall be used to record design parameters. The Government shall provide the Sample Design. It is located below.
Form
Type
| Method |
| Expansion Factor |
| Condition |
| Subpop Filter |
| Variable |
| Min. Value |
| Max. Value |
| When Used |
| TREE |
| BAF |
| 10 or 20 |
| ALL |
| DBH |
| 1.0 |
| 999.9 |
| Overstory plots |
| TREE |
| FRQ |
| 750.0 |
| LIVE |
| DIA |
| .10 |
| 0.9 |
| Understory plots |
| OR |
| LIVE |
| HGT |
| .10 |
| 4.4 |
| Understory plots |
C.4.4.3. Plot Data Form.
The Plot Data Form shall be used to record information relevant to the plot.
| Field Number |
| Field Name |
| Exam Level |
Quick Plot Data Source
| Header Information |
| X |
| Contractor |
| 1 |
| Plot Number |
| X |
| Contractor |
| 2 |
| Plot Latitude |
| X |
| Contractor |
| 3 |
| Plot Longitude |
| X |
| Contractor |
| 4 |
| Plot Aspect |
| X |
| Contractor |
| 5 |
| Plot Slope |
| X |
| Contractor |
| 6 |
| Plot Remarks (If applicable) |
| X |
| Contractor |
A GPS unit is required to obtain latitude & longitude (plot location) within + 10 meter accuracy.
C.4.4.4. Tree Data Form.
The Tree Data Form shall be used to record tree measurement information. The Contractor shall use the following criteria for selecting trees:
· The Contractor shall use the fixed subplot size used in tallying trees ≤ 0.9” DBH. The Contractor fixed radius subplot tallies all live conifer and deciduous trees .01” DBH to ( 0.9" DBH; and all live conifer and deciduous trees 1.0’ tall to < 4.5’ tall.
· The Contractor shall use a 10 or 20 Basal Area Factor (BAF) to tally trees ≥ 1.0” DBH for each stand.
· All items shall be collected in accordance with the Hoosier Field Guide.
| Field Number |
| Field Name |
| Exam Level |
Quick Plot Data Source
| Header Information |
| X |
| Contractor |
| 1 |
| Plot Number |
| X |
| Contractor |
| 2 |
| Tag ID |
| X |
| Contractor |
| 3 |
| Tree Status |
| X |
| Contractor |
| 4 |
| Site Trees |
| X |
| Contractor |
| 5 |
| Tree Species |
| X |
| Contractor |
| 6 |
| Tree Count |
| X |
| Contractor |
| 7 |
| DBH |
| Trees ≥ 4.5 feet tall. |
| Contractor |
| 8 |
| Height |
| X |
| Contractor |
| 9 |
| Age |
| X- one site tree/stand |
| Contractor |
| 10 |
| Wildlife Use |
| X |
| Contractor |
| 11 |
| Snag Decay |
| X – All standing dead trees |
| Contractor |
| 12 |
| Tree Remarks |
| X |
| Contractor |
C.4.5. Work Plan and schedule.
The Contractor shall prepare a work plan and schedule that demonstrates work will be completed within the performance period described in Section F.2. - Deliveries. The Contractor shall provide a general plan with the technical proposal. A supplementary plan and schedules will be provided after contract award, but 5 days before the start of work.
The Contractor shall advise the Contracting Officer or COR of any periods that the Contractor will not be working that is not specified in the accepted Work Plan.
The Contractor may update the work plan when work is in progress and the Contracting Officer may accept the updated work plan.
C. 5. PERFORMANCE REQUIREMENTS SUMMARY.
The following describes the major items in this solicitation with the incentives and deductions for the work described.
| Performance Requirements |
| Performance Standard |
| Acceptable Quality Level |
| Gov’t Method of Assessment |
| Incentive/deduction |
Common Stand Exam Data Collection
| Quality meets or exceeds performance standard of < 5.00% for Form Score and < 10.00% for Total Score. |
| Yes or No |
| COR or inspector conduct random plot sampling consistent with the standards found on the Common Stand Exam Inspection Form and the Hoosier Field Guide. |
| · The Contractor’s quality will be reflected in the performance evaluation either as acceptable or unacceptable. |
· If Contractor achieves < 5.00% for Form Score and < 10.00% for Total Score, work is acceptable and the Contractor will receive full pay.
· If Contractor achieves > 5.00% on any Form Score entire inspection block for that form is unacceptable and shall be returned for rework.
· If Contractor achieves > 10.00% to ≤ 14.50% Total Score the contractor has the option to implement the reduced payment schedule or rework entire inspection block.
· If Contractor achieves > 14.50% Total Score, inspection block is unacceptable and returned for rework.
| Common Stand Exam Data Delivery |
| Quality meets or exceeds performance standard. |
| Yes or No |
| COR or inspector conduct monitoring of delivered data. |
| · The Contractor’s quality will be reflected in the performance evaluation either as pass or fail. |
Work Plan and Schedule
| Work meets schedule as per the accepted work plan. |
| Yes or No |
| COR and inspector conduct periodic monitoring. |
| · The Contractor’s ability to maintain the work schedule and complete work on schedule will be reflected in the performance evaluation as either positive or negative incentive. |
· Work not completed on schedule is subject to Default and may result in assessment of actual costs.
INSPECTION AND ACCEPTANCE
E.2. Acceptance and Rework E.2.1.1. Acceptance will be determined based on compliance with the contract specifications. Noncompliance will result in non-acceptance of the work. If the Contractor’s work is determined to be unacceptable, the Government may initiate any remedies described in FAR 52.246-4 Inspection of Services.
E.2.1.2. When the Contractor’s inspection results fall below the performance standard of < 4.99% for Form Score and < 9.99% for Total Score; based on the Government inspection, acceptance and payment will not be made until the deficiency(s) has been corrected.
E.2.1.3. Payment will be made only on completed plots unless otherwise agreed upon by the Contracting Officer.
E.2.1.4. The Government shall initiate a pass-fail check of specified standards and procedures for each inspection block. Inspection blocks deficient in the following specifications are unacceptable on a "pass-fail" basis and the entire inspection block shall be returned to the Contractor for rework. The determination of noncompliance with these items may be made during the office edit or during field inspection
a. All completed forms and electronic data not submitted to the Forest Service in a timely manner.
b. Forms that are illegible or cannot be reproduced.
c. Stands submitted with incomplete and/or inaccurate information on any form, paper or electronic.
d. Electronic data that cannot be read by Government computers.
e. Any error found in the Sample Design.
f. Any stand having less than the prescribed number of sample plots examined.
g. Any stand with plots not evenly distributed throughout the stand.
h. Any sample plot center < 1 chain from the stand boundary, any sample plot center falling outside the stand boundary, and/or overlapping data. ie: the same vegetation measured on more than one plot.
i. Any sample plot center which cannot be located because of improper labeling, improper reference point labeling, improper GPS referencing or for any other reason attributable to noncompliance with specifications.
j. Any tree with a discrepancy in tree status between live and dead.
k. Any tree with a missing or incorrect tree species on live trees ≥ 1.0” DBH.
E.3.1 Rework.
E.3.1.1. Upon notification to the Contractor of a failed From Score of ≥ 5.00%, the Contractor shall be required to rework all forms on every plot within the inspection block before beginning work on another inspection block.
E.3.1.2. Upon notification to the Contractor of a failed Total Score of > 10.00%, the Contractor shall be required to rework all plots within the entire inspection block before beginning work on another inspection block.
E.3.1.3. At the Governments option, during a rework the Contractor may be required to use a different colored ribbon at each plot center. The COR shall specify the color of the ribbon. If a different color of flagging is called for it shall be at the contractor’s expense.
E.3.1.4. The Government is not required to provide more than 2 inspections on any single inspection block. Results of the last inspection will supercede any prior results for determining acceptability and payment. Failure to pass 2 inspections on a single inspection block may result in contract default.
E.3.1.5. The Government will assess the Contractor the actual costs of conducting any additional inspections. Items that may be included in the actual damages include but is not limited to: wages of the COR and Government inspector(s), costs of vehicles, meals and lodging.
DELIVERIES OR PERFORMANCE
Period of Performance:
The period of performance of this contract is from 1 May 2022 through 30 October 2022.
F. 2. DELIVERIES
F.2.1. Contract Performance Time and Required Rate of Progress
The Contractor shall maintain progress at a rate that will assure completion within the performance period. The minimum acceptable rate of progress shall occur when the percent of work completed falls within 10% of the time used.
F.2.2. Contract Time. The Contractor shall start work promptly after receipt of Notice to Proceed unless otherwise agreed with COR. The Contractor shall maintain progress at a rate that will assure completion within the stated contract time.
It is required that Contractor(s) submit a minimum of 10% of work for inspection/acceptance within 30 calendar days of effective date of Notice to Proceed, and, 50% of the respective Contractor's work must be completed and submitted for inspection/acceptance within 90 calendar days of effective date of Notice to Proceed unless otherwise agreed with COR. The Government will issue A Notice to Proceed as soon as weather, vegetation, and ground conditions are favorable for work on one or more of the areas. Contract time will start (1) on the date specified on the Notice to Proceed, if the notice is hand-delivered; Or (2) Contract Time will start on the third-day after the post office has issued a Notice of Certified Mail to the Contractor. Failure of the Contractor to pick-up Certified Mail will not be considered excusable.
F.2.3. Work Completed after the performance period. Whenever the Contractor fails to complete work within the performance period, and is allowed to work beyond that period, the Contractor will be assessed actual damages. Items to be included in the actual damage includes but is not limited to: wages of the COR and Government inspector(s) for quality assurance after the performance period, costs of vehicles, meals, and lodging that are incurred while administering the contract after the performance period.
F. 3. SUPERINTENDENCE BY THE CONTRACTOR.
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.
F. 4. PERFORMANCE BASED INCENTIVES
This contract contains both positive and negative incentives. The Contractor shall perform work in accordance with the specifications contained in this contract, and their technical proposal (Hoosier Field Guide) that is incorporated by reference. These performance based incentives apply to initial submissions with acceptable work, those items that are rejected or have previously been rejected and corrected do not fall into this population. If by chance an Individual Form Score and the Total Score fall within different incentive percents then the lower incentive percent will be used. These incentives will apply on a per stand bases.
| Actual Form Score |
| Incentive |
All Individual Form Scores 0 – 3.4% and
Total Scores 0 – 6.4% + 2%
All Individual Form Scores 3.5 – 5.0% and
Total Scores 6.5 – 10% + 1%
All Individual Form scores >5% and
Total Scores 10 – 14.5%
That can be reworked to a satisfactory level.
Total Scores 14.6 - 25%
That can be reworked to a satisfactory level.
- 1%
Total Scores > 25.1%
That can be reworked to a satisfactory level.
- 2%
CONTRACT ADMINISTRATION DATA
Post Award Conference
A post award conference with the successful offeror is to be arranged at time of award.
G.1. SUBMISSION OF DATA AND INVOICES
G.1.1. The Contractor shall submit completed payment items within fourteen (14) days after completion of work.
G.1.2. The unit of measure shall be the plot. At least 10% of the plots will be inspected in each location/compartment.
G.1.3. The Contractor shall submit with each inspection block the following, reference Figure 1, Typical CSE Process with Deliverables.
· Electronic field data in ExamsPC “.pdr” file format (or in “.cse” format when using a windows tablet).
· Upon completion of each inspection block, the Contractor shall ensure that completed data is unique.
· Inspection block shall be by location unless otherwise agreed to by the COR.
G. 2. METHOD OF MEASUREMENT
G.2.1. The Government’s inspection will not be initiated until the Contractor submits all data for the inspection block (usually by compartment). All linear and area measurements under this contract are measured on a horizontal plain within the established boundaries.
G.2.1.2. Plots selected for field inspection shall be checked for accuracy in latitude and longitude coordinates. If the coordinates are not within tolerance as stated in this contract, all plots in the inspection block shall be returned to the Contractor for rework plus the incorrectly located plots shall be relocated and remeasured.
G.2.1.3. If during the office inspection, the COR determines a discrepancy trend is occurring, the COR shall notify the Contractor of the finding.
G.2.1.4. If during the field inspection, the COR notices a discrepancy trend developing, the Government may visit additional plots, to review the field(s) in question. These plots will be used to determine if a discrepancy trend does exist. The COR shall notify the Contractor of the findings.
G.2.1.5. If any discrepancy trend continues in any inspection, the inspection block(s) will be returned for rework.
G.2.2. Re-measurement. If the COR’s original inspection results are unacceptable to the Contractor; the Contractor has the option to request, in writing, a re-measurement. Upon the requested re-measurement the Government will conduct a minimum 2% sample. Requests for re-measurement shall be made within five (5) calendar days after receipt of non-compliance and shall contain documentation to support the probability that an error exists. The contractor may accompany the Contracting Officer’s Representative during the re-measurement.
G.2.2.1. If re-measurement supports a variance of < 5%, there will be no adjustment and the Government’s final results will supersede the original assessment and be used for the basis of pay determination. The Contractor shall pay for the actual cost of re-measurement.
G.2.2.2. If re-measurement results supports a variance of > 5%, payment shall be based on the re-measurement results and the Government shall pay for the re-measurement.
G. 3. METHOD OF PAYMENT
G.3.1. Payment Calculation. A point deduction is given for each deficient entry or procedure within an inspection block. Acceptable tolerance levels for individual measurements are shown on the Common Stand Exam Inspection Form. Any item or measurement indicated by inspection to be outside these tolerance levels shall be assigned a point deduction. Point deductions shall be calculated for each form within the inspection block and then totaled for a Total Score. An inspection block may fail based on a Form Score or the Total Score.
G.3.1.1. Form Scores for each field form and Total Score for the overall inspection block; will be calculated using the Point Score Calculation Form. Form Scores are determined by entering the total number of errors, corresponding to each field, found during the inspections of the inspection block and recorded in Column B-Total Number of Errors. Column C- Point Deduction, is calculated by multiplying Column B-Total Number of Errors by Column A- Point Value. The Point Deductions are then totaled in Field D-Total Deductions. Field F-Total Form Score is calculated by dividing Field D- Total Deductions by Field E- the total number of stands or points that were actually inspected for that Form.
Point Deduction Column C = Column B-Total Number of Errors x Column A- Point Value
Total Form Score Field F = Field D- Total Deductions ÷ Field E- the total number of inspected attributes
G.3.1.2. The Total Score is calculated by summing all the Form Scores; see Total Form Score Calculation on the cover of the CSE Inspection Form. Errors in any field that has a Point Value of "unacceptable" will fail and the entire inspection block shall be returned to Contractor for rework.
Form Score.
· All Form Scores < 5.00 and Total Score < 10.00 = acceptable, 100% payment.
· Any Form Score ≥ 5.00 = unacceptable, all forms from entire inspection block, shall be returned for rework. No payment.
Total Score.
· Total Score ≥ 10.00 → ≤ 14.50 = acceptable/unacceptable, The contractor may either rework the entire inspection block or submit the work at a reduced price as outlined in paragraph G.3.1.3 below. This option is at the contractor’s discretion. The contractor shall provide a written determination to the COR prior to reworking a block.
· Total Score > 14.50 = unacceptable, all work from entire inspection block, shall be returned for rework. No payment will be made until the work meets acceptable criteria.
G.3.1.3. The following reduced payment schedule may be implemented at the Contractor’s request if the Contractor’s Total Score is ≥ 10.00% and ≤ 14.50%.
≥ 10.00 → ≤ 11.50% = 90% payment
≥ 11.51 → ≤ 13.00% = 80% payment
≥ 13.01 → ≤ 14.50% = 70% payment
G.3.1.4. An inspection block is considered complete when all work has been assessed for quality assurance and accepted for payment.
SPECIAL CONTRACT REQUIREMENTS
H. 1. KEY PERSONNEL
H.1.1. The Contractor shall assign to this contract the key personnel identified in their technical proposal and that list may include the following:
· CONTRACTOR REPRESENTATIVE
· FOREMAN/WOMAN
H.1.2. The Contractor shall make no substitutions of key personnel without notifying the Contracting Officer within a reasonable timeframe and in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. Proposed substitutes should have comparable qualifications to those of the persons being replaced.
H.1.3. The Contractor shall make no diversion of personnel without the written consent of the Contracting Officer.
H.1.4. The contract will be modified to reflect any approved changes of key personnel.
H. 2. PREWORK CONFERENCE
Prior to commencement of work, the Contractor shall attend a meeting to discuss the contract terms, work performance requirements, and safety. Also at this meeting such items as work progress schedule, camping/worksite plan and communications shall be finalized in writing. A prework meeting location will be determined once the contract is awarded.
H-3 .
PERSONAL PROTECTIVE EQUIPMENT
1. The contractor will train in the safe operation and use of equipment to all workers using such equipment.
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support.
5. The contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
6. The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
7. The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.