Attachment 2 Performance Work Statement.docx

DOCX document 53 KB Posted

Attached to
Bio-Rad QX One Instrument Maintenance Contract
Solicitation number
12639526Q0158
Issued by

About this file

This is a Performance Work Statement (PWS) for a Bio-Rad QX One Droplet Digital PCR System maintenance contract with the USDA Department of Agriculture Animal and Plant Health Inspection Service. The contractor must provide a comprehensive maintenance plan for a Bio-Rad QX One instrument (Serial Number 766BR2216) located at the S&T Pest Identification Technology Laboratory (PITL), with an estimated equipment value exceeding $329,000. The maintenance plan requires full on-site support with authorized technician travel to the PITL facility, unlimited repair services inclusive of travel, parts, and labor, and two preventative maintenance visits per year. The technician performing all services must be authorized by Bio-Rad as the equipment manufacturer to conduct such maintenance.

The PWS specifies that Bio-Rad is the sole manufacturer capable of producing the QX One ddPCR system, and preventative maintenance cannot be performed by outside parties, necessitating a sole source acquisition. The government will furnish authorized technician access to PITL during regular business hours. No deliverables schedule, travel reimbursement specifications, key personnel requirements, security requirements, or data rights restrictions are detailed in this section of the PWS. The related presolicitation notice indicates a sole source award intent to Bio-Rad Laboratories, Inc. (UEI: SSHPDYFGN7J9) using FAR Part 12 procedures, with a response deadline of June 4, 2026, though the presolicitation notes a discrepancy stating one preventative maintenance visit annually rather than the two visits specified in the PWS.

View the file

Other files

File Type Posted
Attachment 1 Sole Source Justification revised.pdf PDF
Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Government Furnished3
5.0 Deliverables / Schedule3
6.0 Travel4
7.0 Contractor’s Key Personnel4
8.0 Security Requirements4
9.0 Data Rights4
10.0 Section 508 – Electronic and Information Technology Standards4
Attachment4

Project Bio-Rad QX One instrument maintenance contract

General Information

1.0 Scope of Work

Provide a brief statement of the overall project, including goals and objectives.

A maintenance plan is required for the continued operation of the Bio-Rad QX One Droplet Digital PCR System located at the S&T Pest Identification Technology Laboratory (PITL). This system consists of the following components:

• QX One instrument (S/N 766BR2216)

2.0 Background

Provide a general description of the requirement, describing the acquisition history (if applicable), the current environment, and the vision of the future of the requirement. If information technology is a factor, provide pertinent technical facts.

Bio-Rad is the company that produces the QX One ddPCR system and provides OEM maintenance. This maintenance plan is required to keep this existing equipment functional and ensure programmatic goals are reached. Preventative maintenance is required on an annual basis to ensure accurate outputs and is included in this plan. The preventative maintenance cannot be performed by an outside party. The estimated value of the QX One Digital PCR System exceeds $329,000 and thus replacement would be very costly.

Contractor Requirements

3.0 Technical Requirements / Tasks

Describe the specific tasks or work the contractor must perform. Provide direction on any specific methodologies.

· The description of task requirements will depend on the approach that is selected to describe the required effort.

· For a level-of-effort SOW, identify all tasks that must be performed and the hours to be devoted to each task.

· For a detailed statement of work, describe how the service must be accomplished. It may include precise measurements, tolerances, materials, quality control requirements, and other government requirements that control the processes of the contractor.

· Describe the requirements in a way that permits the contractor personnel to perform the service without direct government supervision. Contractor personnel must not be subject to the supervision and control usually prevailing between the government and its employees. For example, a SOW may permit the government to approve key personnel but must not permit the government to approve all personnel performing the service. The SOW should also not include words (e.g., “use methods directed by the Contracting Officer’s Representative (COR)") that appear to indicate the government is managing day-to-day operations. Other items to consider:

· Specify requirements clearly so all readers can understand the content.

· Reference only the absolute minimum applicable specifications and standards needed.

· Tailor specifications and other documents.

· Separate general information from direction.

The maintenance plan must include the following items:

•Full on-site support where the service technician will travel to the office where the equipment is located (PITL)
•Unlimited repair of the system inclusive of travel, parts, and labor
•Coverage of the QX One instrument referenced above
•Two preventative maintenance visits per year

The technician performing the service must be authorized by the manufacturer of the equipment to perform such service.

4.0 Government Furnished

List any government-furnished support, data, property or facilities. Describe government responsibility for reviewing and approving reports and final products generated under the contract. If the contractor will require access to government facilities, identify the facility location and specific area. Identify any federal holidays or other times when access may be restricted.

Authorized technicians will be granted access to PITL during regular hours to perform the required maintenance tasks.

5.0 Deliverables / Schedule

N/A

6.0 Travel

N/A

7.0 Contractor’s Key Personnel

N/A

8.0 Security Requirements

NA

9.0 Data Rights

N/A

10.0 Section 508 – Electronic and Information Technology Standards N/A image1.png