Attachment 2 Performance Requirements Summary Table.pdf
PDF 279 KB Posted
- Attached to
- DARTS Engineering Services SBIR Phase III Federal contract opportunity
- Solicitation number
- N6660421R0100
About this file
This document contains a performance requirements summary table and details of a related federal contract opportunity. The performance requirements summary table outlines technical requirements for engineering services to support the Data Analysis Reporting Tool Set (DARTS) program. Requirements include adapting, testing, installing, operating and maintaining the DARTS system aboard submarines and at test sites. Acceptable performance standards and quality levels are defined for each requirement.
The related federal contract opportunity is a sole source award to Progeny Systems for DARTS engineering services as a follow-on to previous Small Business Innovative Research funding. The five-year indefinite delivery, indefinite quantity contract valued at 258,330 man-hours will be issued by the Naval Undersea Warfare Center Division, Newport. The work involves developing and maintaining DARTS hardware and software variants to collect and analyze submarine non-propulsion electronic system data for test and evaluation reporting.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 Requiring GFP Memo.pdf | ||
| Exhibit A. CDRLs -_Redacted.pdf | ||
| N6660421R0100.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary Table
PR Number: 1300759772
Requirement (Task number and title from
SOW/PWS)
CDRL
(if applicable)
Performance Objective Performance Standard
Acceptable
Quality
Level
(AQL)
Monitoring Method
4.1
DARTS
DEVELOPMENT
Adapt the DARTS system as required to support installation on board USS VIRGINIA and in-service submarines being constructed or going through a post shakedown availability (PSA).
Changes are technically/operationally sound and compatible with platforms.
Standard is met 90% of the time.
Government feedback from Project
Managers upon review and execution of services provided.
Upgrade the DARTS hardware and software as needed for NPES or C3I
Systems.
Modifications and upgrades provide improvement.
Interfaces function properly.
Standard is met 90% of the time.
Government feedback from Project
Managers upon review and execution of services provided.
4.2
TEST
PREPARATION
Identify the data collection requirements for test events and prepare a DARTS variant to support those test events.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project
Maintain Configuration Management of each DARTS variant in use.
Database is accurate and complete.
Standard is met 95% of the time.
Government feedback from Project
Conduct DARTS demonstrations at specified facilities in preparation for test events.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project
Deliver test plans and procedures prior to each at-sea test.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project
Managers upon review and execution of services provided.
4.3
INSTALLATION
AND REMOVAL
Install DARTS on specified submarines.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project
Coordinate TEMPALT’s as needed to support installation and removal of
DARTS.
No installation delays.
Platform approvals made in advance.
Standard is met 90% of the time.
Government feedback from Project
Accommodate DARTS removal and shipping.
Classified Security and all approved schedules maintained.
Standard is met 90% of the time
Government feedback from Project
Managers upon review and execution of services provided.
4.4
TEST
CONDUCT
Conduct testing of DARTS during dockside and at-sea test periods, to include training NUWC Test Team members on DARTS operation and maintenance.
Services provided are technically accurate, complete, and are provided in accordance with all approved schedules.
Standard is met 90% of the time.
Government feedback from Project
Prepare, setup, and operate Mobile office that will accommodate remote
DARTS maintenance, calibration, and upgrades.
Budget constraints maintained. Full functionality provided.
Standard is met 90% of the time.
Government feedback from Project
Managers upon review and execution of services provided.
4.5
DATA
MANAGEMENT,
ANALYSIS AND
REPORTING
Maintain two databases for test data.
Databases contain required
System data completely and accurately.
Standard is met 95% of the time.
Government feedback from Project
Maintain accountability for all test data.
Mandated System data is recorded and is correct.
Standard is met 95% of the time.
Government feedback from Project
Deliver test reports after each at-sea test.
Reports are delivered according to schedule and provide mandated metrics.
Standard is met 95% of the time.
Government feedback from Project
Managers upon review and execution of services provided.
4.6
MAINTENANCE
AND STORAGE
Provide DARTS maintenance services including Systems updates.
Engineering services provided are technically accurate.
Standard is met 90% of the time.
Government feedback from Project
Provide for off-hull storage of the
DARTS system when it is not in operational use.
Accountability for equipment maintained.
Standard is met 95% of the time.
Government feedback from Project
Mobile office at test sites will accommodate all DARTS system maintenance.
Budget constraints maintained. Full functionality provided.
Standard is met 90% of the time.
Government feedback from Project
Managers upon review and execution of services provided.
5.0
PROGRESS
REPORTS
Submit a Monthly Report documenting technical progress and tracking program milestones.
Deliverable products are technically accurate and customer acceptable.
Standard is met 90% of the time.
Government feedback from Project