Attachment 2 - Option.pdf
PDF 278 KB Posted
- Solicitation number
- FA520926Q0067
About this file
FA520926Q0067 - Off-Post Housing Appliance Option Specifications
This document is a specifications attachment for a federal contract opportunity covering off-post housing appliances for delivery to Camp Zama, Japan. The contract requires 100 units each of electric clothes washers (HITACHI BW-V80P(W) or equal), electric clothes dryers (HITACHI DE-N60HV(W) or equal), and dryer stands (HITACHI DES-P32(S) or equal); 20 units of a combined washer-dryer unit (PANASONIC NA-LX113EL(W) or equal); and 100 units of a refrigerator (PANASONIC NR-C33ES2-W or equal). All items must be white, operate on 100V/50Hz power, meet specified dimensional and capacity requirements, and weigh within designated limits. The combined washer-dryer must feature front loading with a left-opening door and 11.0–12.0 kg washing capacity, while the refrigerator must have left-handle configuration with right-opening door and total capacity of 320–350 liters.
Delivery must be completed within 150 days after option exercise to Building 671, Camp Zama, Zama-shi, Kanagawa, Japan, with the contractor coordinating timing due to warehouse constraints. Delivery fees for direct commercial carrier shipments to Camp Zama must be included in unit pricing. The contractor must provide commercial on-site warranty coverage for all items, including repair and on-call service, for a minimum of one year, with warranty terms equivalent to those offered to the contractor's most favored customers. The Government will provide forklift assistance for unloading at delivery and may request replacement of items damaged during shipping or transportation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 1 Specifications (0001 - 0005).pdf | ||
| Solicitation - FA520926Q0067.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA520926Q0067
Attachment 2
SPECIFICATIONS
FOR
OFF-POST HOUSING APPLIANCE
OPTION (0006 – 0010)
1. REQUIRED ITEMS
a. Electric Clothes Washer, JPN 100 Each HITACHI BW-V80P(W) or equal
Width (W): Maximum 610 mm Depth (D): Maximum 610 mm Height (H): Maximum 1000 mm 100V/50Hz
Minimum Requirement:
Color: White Top Load Washer Washing Capacity: 8.0 kg ~ 9.0 kg Net Weight: Must be less than 40kg
b. Electric Clothes Dryer, JPN 100 Each
HITACHI DE-N60HV(W) or equal
Width (W): Maximum 640 mm Depth (D): Maximum 520 mm Height (H): Maximum 680 mm
Front Load Dry Capacity: 6.0 ~ 7.0 kg Net Weight: Must be less than 30kg Can be stacked on the top load washer with the dryer stand
c. Dryer Stand, JPN 100 Each
HITACHI DES-P32(S) or equal
Attach the dryer to stack on the top load washer
d. Electric Clothes Washer & Dryer Combined, JPN 20 Each PANASONIC NA-LX113EL(W) or equal
Width (W): Maximum 640 mm Depth (D): Maximum 730 mm Height (H): Maximum 1100 mm
Front Load Door opens to left Washing Capacity: 11.0 ~ 12.0 kg Net Weight: Must be less than 85kg
e. Refrigerator, JPN 100 Each
PANASONIC NR-C33ES2-W or equal
Width (W): Maximum 600 mm Depth (D): Maximum 600 mm Height (H): Maximum 1700 mm
Refrigerator Capacity: 240 ~ 260L Freezer Capacity: 70 ~ 80L Total Capacity: 320 ~ 350 Left Handle and Door Open to Right Net weight: Must be less than 70kg
2. DELIVERY POINT
Bldg 671, Camp Zama, Zama-shi, Kanagawa, Japan 〒252-8511 神奈川県座間市キャンプ座間内建物番号 671
3. DELIVERY DATE
Delivery within 150 days after Option Excised
*Contractor shall coordinate with the Government Representative due to the warehouse situation.
4. DELIVERY FEE
Delivery Fee for direct deliveries by commercial carriers to Camp Zama, Japan should be included in the respective unit price.
5. WARRANTY
The contractor should provide the Government with their commercial On-Site Warranty for all items including repair or on-call service and on-site warranty (including repair or replacement) during the warranty period of at least 1 year. The Government shall receive the same warranty service as the contractor’s most favored customers.
6. NOTE
The Government will provide forklift with driver for unloaded trucks when delivery.
If the Government finds damage after unpacking, it may request the contractor to replace it if the damage occurred during shipping or transportation.
File details come from the government source that posted it. Updated .