Attachment 2 - Modular Roof Repair Diagrams 6 May 2025.pdf
PDF 1 MB Posted
- Solicitation number
- 21CONS_MODROOF
About this file
The document is a Sources Sought announcement for modular building roof repair at Peterson Space Force Base, Colorado. The U.S. Space Command is conducting market research to identify potential contractors for roof repair services for Building 1 Modulars, with specific requirements including water diversion solutions, leak repairs over the main entry door, and installation of a drain system. The diagrams detail proposed roof repair techniques, showing water flow directions and collection system placement, with a note that the actual layout may vary from the proposed design.
The Sources Sought notice seeks small businesses under NAICS code 236220 (Commercial and Institutional Building Construction) with a $45 million size standard. Interested parties are asked to confirm their small business status, capability to provide services, potential implementation timeline, and any barriers or questions. Responses are due by Thursday, 15 May 2025, at 2:00 PM MST, to be submitted via email to specific Space Force contacts. Future solicitation details will be posted on SAM.gov, and all contractors must be registered in the System for Award Management (SAM) database.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - PWS Modular Roof Repair DRAFT 6 May 2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Bldg 1 Modulars Proposed Roof Repair Work Site Location
BLDG 1.
Service Gate
Modulars Parking
Bldg 1 Modulars Proposed Roof Repair and Water Diversion Diagram
Install water diversion solution over adjoining seam. Solution must divert water away from seam.
Install drain system
= Water Flow
Water must be diverted away from Modulars and must not reach surface of walkway.
Repair leaks over main entry door..
1266584713E Inserted Text solution
1266584713E Cross-Out
1266584713E Cross-Out
Bldg 1 Modulars Proposed Roof Repair and Water Diversion Diagram
Install water collection system as required for proper water diversion ***Note: Diagram depiction is a proposal.
Actual layout and location may vary
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
File details come from the government source that posted it. Updated .