STATEMENT OF WORK
MAFR Radar Globe EPDM Project
29 June 2022
1.0 DESCRIPTION OF PROPOSED WORK. The scope of work includes the delivery and installation of .060 mil white Ethylene Propylene Diene Monomer (EPDM) floor overlay in the Radar Globe at Melrose Air Force Range. The Contractor shall furnish all necessary parts, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for providing all work described in this SOW and all applicable codes, regulations, standards and criteria in effect at the date of solicitation. The work to be performed under this contract shall consist of the following:
• Clean and prepare 805 square feet of radar dome flooring for EPDM application. The contractor shall cover sharp edges and effectively mitigate the potential to penetrate the EPDM surface from existing elements of the structure.
• Remove and replace electrical outlets where EPDM will be placed behind outlets.
• Install EPDM cover strip over existing fastener seams.
• Fully adhere .060 mil EPDM (white) over floor and curb.
• Flash curb to edge.
• Seal all penetrations in floor, seal to access door only.
• Install 2-2” roof drains in floor
• Route 2” PVC drain piping underfloor and above ceiling below. Route through exterior wall and down to existing grade. Provide splash block at the bottom of the down spout piping.
• Insulate PVC pipe on the interior of the building only.
• Walk roof at exterior of dome and patch holes as needed and apply caulking. (Include 1 return trip for leak review).
1.1 LOCATION. All work is to be performed at Building 3127, Melrose Air Force Range.
Contractor is required to obtain Range Safety Officer Training prior to starting work on the range.
1.2 PERIOD OF PERFORMANCE. The Period of Performance (POP) duration is not to exceed 30 days after contract award.
1.3 HOURS OF OPERATION. Regular working hours will consist of a 9-hour period, between
08:00 a.m. and 05:00 p.m., Monday through Friday, excluding Government holidays IAW UFGS 01 14 00 Work Restrictions.
1.4 SECURE AREAS. The Contractor shall ensure all employees comply with all security requirements imposed by the installation at all times and shall follow all instructions of the installation having jurisdiction over the area being serviced in all matters pertaining to security. The Contractor and his personnel shall be required to coordinate and schedule all work in classified and restricted areas with appropriate Government representatives prior to entering these areas.
1.5 GENERAL REQUIRMENTS. The Contractor shall perform all the tasks necessary to deliver the requirement in compliance with this Statement of Work (SOW). The Contractor shall supply all labor, materials, transportation, equipment, and supervision to provide a complete, finished, functional product meeting the SOW.
1.6 ADMINISTRATION REQUIREMENTS. The Contractor shall identify a lead Project Manager who shall perform all project management functions and tasks necessary to satisfy the requirements consistent with operational quality, safety, security, and environmental standards. The program management function of this contract shall provide insight to the Government for all technical and programmatic activities performed under this contract.
On-Site Supervision: The Contractor shall provide the manpower, equipment, materials, services, and transportation necessary to ensure oversight services throughout accomplishment of this contract. It is the responsibility of the Contractor to establish and maintain open communications with the CO associated with accomplishment of this contract.
1.7 SUBMITTLES. The Contractor shall provide submittals. The Contractor will perform any work on site without approved submittals at their own risk. The submittals listed below are required. Use AF Form 3000 to process submittals. Submit four copies of submittals to Contracting Officer.
1.8.1 Safety Data Sheets for all materials and supplies used on the project.
1.8.2 Manufactures warranty.
1.8 PROTECTION OF GOVERNMENT PROPERTY. The Contractor shall use care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor fails to use care and causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.