Attachment 2 KANAWHA (WLR 75E) DD FQ4 WAB 24R0 (1).docx

DOCX document 2 MB Posted

Attached to
Dry-Dock: USCGC KANAWHA FY24 DD
Solicitation number
70Z08524QIBCT0013
Issued by

About this file

This document is a combined synopsis/solicitation for commercial services related to dry-dock repairs of the USCGC KANAWHA (WLR 75407) 75-foot Class River Buoy Tender and USCG 130-foot Barge (13073). The solicitation is a Request for Quotation (RFQ) issued as a total small business set-aside under FAR Part 12 and FAR Subpart 13.5, with a NAICS code of 336611 - Ship Repair. The period of performance is from 3 September 2024 through 11 November 2024, with the place of performance at the contractor's facilities. Quotations are due by 23 May 2024, and the anticipated award date is on or about 5 July 2024. The contractor shall furnish all necessary labor, materials, and services to perform the dry-dock repairs in accordance with the detailed specifications provided in Attachment 2. Questions regarding the solicitation should be submitted by 20 May 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC KANAWHA (WLR 75407)

USCG 130 BARGE (13073)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2024

Developed By: William A Baker

(REV-0 6 March 2024)

TABLE OF CONTENTS

Revisions Recordiv
Consolidated List of Referencesv
Consolidated List of Government-furnished Propertyxiii
Consolidated List of Critical Inspection Itemsxv
Principal Characteristics - Tenderxvii
Principal Characteristics - Bargexviii
General Requirements1
WORK ITEM 1: Fire Prevention Requirements14
WORK ITEM 2: Hull Plating, U/W Body, Inspect - Tender19
WORK ITEM 3: Hull Plating, U/W Body, Ultrasonic Testing - Tender23
WORK ITEM 4: Hull Plating, Freeboard, Ultrasonic Testing - Tender26
WORK ITEM 5: U/W Body, Preserve, 100 percent - Tender28
WORK ITEM 6: Hull Plating Freeboard, Preserve, 100 Percent - Tender30
WORK ITEM 7: Hull and Structural Plating, _____ Steel Plate, Renew33
WORK ITEM 8: Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Tender35
WORK ITEM 9: Appendages, U/W, Leak Test - Tender37
WORK ITEM 10: Appendages, U/W, Internal, Preserve - Tender40
WORK ITEM 11: Voids, Non-Accessible, Leak Test - Tender42
WORK ITEM 12: Voids, Non-Accessible, Internal Surfaces, Preserve44
WORK ITEM 13: Tanks, MP Fuel Service, Clean and Inspect - Tender45
WORK ITEM 14: Tanks, Potable Water, Clean and Inspect - Tender51
WORK ITEM 15: Propulsion Shafting, Straighten55
WORK ITEM 16: Propulsion Shafting, Optical or Laser Alignment Check57
WORK ITEM 17: Propulsion Shaft Seals, Mechanical Clean and Inspect59
WORK ITEM 18: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew63
WORK ITEM 19: Propulsion Shafting, Remove, Inspect, and Reinstall68
WORK ITEM 20: Propulsion Shaft Bearings, External, Renew72
WORK ITEM 21: Propulsion Shaft Bearings, External, Check Clearances75
WORK ITEM 22: Stern Tube Interior Surfaces, Preserve, 100 Percent77
WORK ITEM 23: Propeller, Perform Minor Repairs and Reconditioning80
WORK ITEM 24: Propellers, Remove, Inspect, and Reinstall84
WORK ITEM 25: Keel Coolers, Clean, Inspect and Hydro88
WORK ITEM 26: Fathometer Transducer, General Maintenance92
WORK ITEM 27: Sea Strainers, Duplex, All Sizes, Overhaul95
WORK ITEM 28: Point of Use Potable Water Filters, Install99
WORK ITEM 29: Rudder Assembly, Remove, Inspect And Reinstall102
WORK ITEM 30: Rudders, Preserve, 100 Percent107
WORK ITEM 31: Rudder Stock Bearings Clearances, Check109
WORK ITEM 32: Rudder Stock Housing, Lower, Renew113
WORK ITEM 33: Rudder Stock Housing, Upper, Renew115
WORK ITEM 34: Rudder Stock, Rebuild117
WORK ITEM 35: Spuds, Overhaul - Tender120
WORK ITEM 36: Spud Wells, Preserve - Tender124
WORK ITEM 37: Spud Wells, Inspect - Tender126
WORK ITEM 38: Sewage Holding Tanks, Clean and Inspect - Tender128
WORK ITEM 39: Tanks (Sewage Holding), Preserve, Partial - Tender132
WORK ITEM 40: Tanks, MP Fuel Service, Preserve, Partial - Tender135
WORK ITEM 41: Tanks, Potable Water, Preserve, Partial, - Tender139
WORK ITEM 42: Decks - Exterior, Preserve, Non-Skid Broadcast Grit System - Tender143
WORK ITEM 43: Cathodic Protection, Magnesium Anodes, Renew, - Tender146
WORK ITEM 44: Drydock - Tender149
WORK ITEM 45: Temporary Services, Provide - Tender153
WORK ITEM 46: Sea Trial Performance, Support, Provide156
WORK ITEM 47: Hull Plating, U/W Body, Inspect - Barge160
WORK ITEM 48: Hull Plating, U/W Body, Ultrasonic Testing - Barge164
WORK ITEM 49: Hull Plating, Freeboard, Ultrasonic Testing - Barge167
WORK ITEM 50: Hull and Structural Plating, _____ Steel Plate, Renew - Barge169
WORK ITEM 51: Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Barge171
WORK ITEM 52: Appendages, U/W, Leak Test - Barge173
WORK ITEM 53: Appendages, U/W, Internal, Preserve - Barge176
WORK ITEM 54: Tanks, MP Fuel Service, Clean and Inspect - Barge178
WORK ITEM 55: Tanks, Potable Water, Clean and Inspect - Barge182
WORK ITEM 56: Tanks, Ballast, Clean and Inspect - Barge186
WORK ITEM 57: Fathometer Transducer, General Maintenance - Barge189
WORK ITEM 58: Tanks, Ballast, Preserve, 100 Percent - Barge192
WORK ITEM 59: Tanks, Fuel, Preserve, Partial - Barge195
WORK ITEM 60: Tanks, Potable Water, Preserve, Partial - Barge198
WORK ITEM 61: Decks - Exterior, Preserve, Non-Skid Broadcast Grit System - Barge202
WORK ITEM 62: U/W Body, Preserve, 100 percent - Barge205
WORK ITEM 63: Hull Plating Freeboard, Preserve, 100 Percent - Barge209
WORK ITEM 64: Cathodic Protection, Magnesium Anodes, Renew - Barge212
WORK ITEM 65: Temporary Services, Provide - Barge Barge215
WORK ITEM 66: Sea Trial Performance, Support, Provide - Barge218
WORK ITEM 67: Sea Strainers, Simplex, Overhaul - Barge222
WORK ITEM 68: Point of Use Potable Water Filters, Install - Barge226
WORK ITEM 69: Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge229
WORK ITEM 70: Spuds, Overhaul - Barge232
WORK ITEM 71: Spud Wells, Preserve - Barge236
WORK ITEM 72: Spud Wells, Inspect - Barge238
WORK ITEM 73: Decks – Exterior (Buoy or Construction Deck), Preserve 100%240
WORK ITEM 74: Drydock - Barge243
WORK ITEM 75: Bridge Equipment Emergency Power System, Install247
WORK ITEM 76: MDE Control Panel, Power Supply Modification251
WORK ITEM 77: Boat Davit Winch, Shrink Wrap271
WORK ITEM 78: Buoy and Cargo Handling Crane, Shrink Wrap273
WORK ITEM 79: Potable Water System Valves, Overhaul or Renew275
WORK ITEM 80: Navigation Light and Panel, Upgrade280
WORK ITEM 81: Piping Insulation, Renew290
WORK ITEM 82: Galley Deck, Repair292

USCGC KANAWHA (WLR-75E) DRYDOCK AVAILABILITY FY2024

iii
(REV-0)

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv
(REV-0)

Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

75 WAGL 2200-010, -Rev D, Main Rudder Stock And Fittings For Jastram S2-16-2-35 Steering System 75 WAGL 2200-011, Rev D, Flanking Rudder Stock And Fittings For Jastram S2-16-2-35 Steering System Coast Guard Drawing 130 CGB 085-007, Rev -, Tank Capacity Tables Coast Guard Drawing 130 CGB 633-001, Rev -, Cathodic Protection Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements and Profile Coast Guard Drawing 130 CGB 71-77-111-002, Rev-, Hull Details Side Shell Plating & Framing Coast Guard Drawing 130 CGB67 111-001, Rev 9, Hull Details – Bottom & Main Deck Plating and Framing Details Coast Guard Drawing 130 CGB67 530-003, Rev 3, Potable & Fresh Water Piping Schematic Coast Guard Drawing 130 CGB68 111-001, Rev 3, Hull Details – Bottom & Main Deck Plating and Framing Details Coast Guard Drawing 130 CGB68 530-003, Rev 3, Potable & Fresh Water Piping Schematic Coast Guard Drawing 130 CGB69 111-001, Rev 3, Hull Details – Bottom & Main Deck Plating and Framing Details Coast Guard Drawing 130 CGB69 530-003, Rev 3, Potable & Fresh Water Piping Schematic Coast Guard Drawing 130 CGB70 111-001, Rev -, Hull Details – Bottom & Main Deck Plating and Framing Details Coast Guard Drawing 130 CGB70 530-003, Rev 3, Potable & Fresh Water Piping Schematic Coast Guard Drawing 130 CGB71-77 085-004, Rev 1, Docking Plan Coast Guard Drawing 130 CGB71-77 085-005, Rev -, Body Plan Coast Guard Drawing 130 CGB71-77 085-006, Rev -, Curves of Form Coast Guard Drawing 130 CGB71-77 111-001, Rev -, Hull Details – Bottom & Main Deck Plating and Framing Details Coast Guard Drawing 130 CGB71-77 123-001, Rev -, Spud Well Bhds & Spud Details Coast Guard Drawing 130 CGB71-77 530-003, Rev 3, Potable & Fresh Water Piping Schematic Coast Guard Drawing 130 CGB71-77-085-004, Rev 1, Docking Plan Coast Guard Drawing 130 CGB74-77 111-001, Rev A, Hull Details – Bottom & Main Deck Plating and Framing Details Coast Guard Drawing 130-CGB 085-1, Rev 1, General Arrangement Main Deck Plan Coast Guard Drawing 130-CGB 085-2, Rev 2, Compartment d& Access Plan & Hold, Mn DK & DK House Coast Guard Drawing 130-CGB 085-7, Rev -, Tank Capacity for CG Barge 130” Coast Guard Drawing 130-CGB 530-1, Rev 2, Potable Water Tanks FAB & Install Coast Guard Drawing 130-CGB 530-3, Rev 4, Potable & Fresh Water Piping Schematic Coast Guard Drawing 130-CGB 540-2, Rev-, Fuel Oil Piping Schematic.

Coast Guard Drawing 130-CGB67 111-2, Rev -, Side Shell Plating Modification Coast Guard Drawing 130-CGB67 123-2, Rev 2, Transducer Well Details Coast Guard Drawing 130-CGB69 111-3, Rev -, Side Shell Plating Modification (CGB 69 and 70) Coast Guard Drawing 130-CGB71-77 111-3, Rev -, Side Shell Plating Modification Coast Guard Drawing 75 WAGL 0700-004, Rev A, Docking Plan Coast Guard Drawing 75 WAGL 2901-004, Rev -, Curves of Form Coast Guard Drawing 75 WAGL 633-001, Rev -, Cathodic Protection Coast Guard Drawing 75C-WAGL-252-002, Rev K, Propulsion Control System to Suit IF 1312 MDE (CHEYENNE, WYACONDA, GASCONADE, MUSKINGUM, CHIPPEWA) Coast Guard Drawing 75C-WAGL-6201-026, Bridge Console UPS Install Coast Guard Drawing 75C-WAGL-6201-029, Electrical One-Line Block & Elem Wiring Diagram Coast Guard Drawing 75C-WAGL-6201-029, Rev B, Electrical One-line Block & Elem Wiring Diagram Coast Guard Drawing 75D-WAGL-2402-001, Rev C, Propulsion Control System to Suit IF 1312 MDE (WEDGE) Coast Guard Drawing 75D-WAGL-6201-005, Electrical One-Line Block Wiring Diagram Coast Guard Drawing 75D-WAGL-6201-005, Rev C, Electrical One-Line Block Wiring Diagram Coast Guard Drawing 75E WAGL 2200-022, Rev C, Steering System Arrangement for JASTRAM S2-16-2-35 Coast Guard Drawing 75E WAGL 2200-024, Rev B, Rudder Post Installation for JASTRUM S2-16-2-35 Steering System Coast Guard Drawing 75E WAGL 4301-008, Rev G, Shafting Installation to Suit IF 1312 MDE Coast Guard Drawing 75E WLR 0103-3, Rev -, Booklet Of Gen Plans Coast Guard Drawing 75E WLR 0500-001, Rev 1, Lines and Offsets Coast Guard Drawing 75E WLR 0700-003, Rev A, 75FT “E” Class Towboat Docking Block Arrangement Coast Guard Drawing 75E WLR 103-002, Rev 2, Inboard Profile and Hold Arrgt Plan Coast Guard Drawing 75E WLR 103-3, Rev-, Booklet of General Plans Coast Guard Drawing 75E WLR 110-1, Rev 1, Dk Plate Plan & Shell Expansion Coast Guard Drawing 75E WLR 1101-001, Rev 1, Dk Plate Plan & Shell Expansion Coast Guard Drawing 75E WLR 1101-005, Rev B, New Grid Cooler Pocket P/S to Suit IF1312 MDE Coast Guard Drawing 75E WLR 1103-001, Rev 5, Hull Framing Plan Coast Guard Drawing 75E WLR 1103-004, Rev 3, Transverse Frames #15 thru 22 Coast Guard Drawing 75E WLR 1103-005, Rev 3, Transverse Frames #23 thru 28 Coast Guard Drawing 75E WLR 1105-002, Rev 3, Miscellaneous Hull Longitudinal Girders and Bulkheads and Transducer Installation Details Coast Guard Drawing 75E WLR 2200-002, Rev 4, Backing Rudder Details Coast Guard Drawing 75E WLR 2200-003, Rev 4, Steering Rudder Details Coast Guard Drawing 75E WLR 2200-24, Rev B, Rudder Post Installation for Jastram S2-16-2-35 Steering System Coast Guard Drawing 75E WLR 2200-24, Rev B, Rudder Post Installation for Jastrum S2-16-2-35 Steering System Coast Guard Drawing 75E WLR 2602-1, Rev 2, Towing Knee and Spud Well Coast Guard Drawing 75E WLR 2602-2, Rev 1, Spud Hoist and Spud Coast Guard Drawing 75E WLR 3603-001, Rev 4, Arrgt. Of Pot. & San. Water Piping Coast Guard Drawing 75E WLR 4103-014, Rev B, Jacket Water Piping Mods to Suit IF 1312 MDE Coast Guard Drawing 75E WLR 4301-001, Rev 2, Propeller Shaft and Stern Tube, Arrangement and Details Coast Guard Drawing 75E WLR 4301-001, Rev 4, Propeller Shaft and Stern Tube, Arrangement and Details Coast Guard Drawing 75E WLR 4301-002, Rev 1, 48x47 Propeller, Shaft Brake, Strut Details, Steady Rest Bearing Support, and Coupling Nut Wrench Coast Guard Drawing 75E WLR 700-003, Rev A, 75FT “E” Class Towboat Docking Block Arrangements Coast Guard Drawing 75E-WLR 2200-22, Rev C, Steering System Arrangement for Jastram S2-16-2-35 Coast Guard Drawing 75E-WLR 2200-23, Rev D, Flanking Steering System Arrangement for Jastram S2-16-2-35 Coast Guard Drawing 75E-WLR 2200-24, Rev B, Rudder Post Installation for Jastram S2-16-2-35 Steering System Coast Guard Drawing 75E-WLR 4301-8, Rev G, Shafting Installation to Suit If 1312 MDE Coast Guard Drawing 75E-WLR 103-001, Rev 1, Outboard Profile & Arrangement Plan Coast Guard Drawing 75E-WLR 1101-001, Rev 1, Dk Plate Plan & Shell Expansion Coast Guard Drawing 75E-WLR 2200-22, Rev C-, Steering System Arrangement for Jastram S2-16-2-35 Coast Guard Drawing 75E-WLR 2200-23, Rev D, Flanking Steering System Arrangement for Jastram S2-16-2-35 Coast Guard Drawing 75E-WLR 2200-24, Rev B, Rudder Post Installation for Jastram S2-16-2-35 Steering System Coast Guard Drawing 75E-WLR 3402-001, Rev 2, Galley Mess-room Arrangement Coast Guard Drawing 75E-WLR 4301-8, Rev G, Shafting Installation to Suit If 1312 MDE Coast Guard Drawing 75E-WLR-0101-11, Rev -, Heating and Air Conditioning Piping Coast Guard Drawing 75E-WLR-0101-12, Rev -, Heating and Air Conditioning Piping – In Hull Coast Guard Drawing 75E-WLR-0101-13, Rev -, Heating and Air Conditioning Piping – Above Main Deck Coast Guard Drawing 75E-WLR-0101-5, Rev -, Chiller Condenser Cooling Water Arrangement Coast Guard Drawing 75E-WLR-0101-7, Rev -, Heating and Air Conditioning Convector Arrangement Coast Guard Drawing 75E-WLR-252-001, Rev G, Propulsion Control System to Suit IF 1312 MDE (PATOKA, KICKAPOO, KANAWHA) Coast Guard Drawing 75E-WLR-252-002, Rev B, Propulsion Control System to Suit IF 1312 MDE (CHENA) Coast Guard Drawing 75E-WLR-6201-054, Electrical One-Line Block & Elem Wiring Diagram Coast Guard Drawing 75E-WLR-6201-054, Rev B, Electrical One-Block & Elem Wiring Diagram Coast Guard Drawing 75F-WLR-300-001, Electrical One-Line Diagram Coast Guard Drawing 75F-WLR-330-002, Rev G, Navigation Lights Diagram Coast Guard Drawing 75-WAGL 2200-11, Rev D, Flanking Rudder Stock and Fittings for Jastram S2-16-2-35 Steering System Coast Guard Drawing 75-WAGL 4301-5, Rev N, Shafting Machining Details to Suit If 1312 MDE Coast Guard Drawing 75-WAGL 4400-3, Rev L, Propeller to Suit IF1312 MDE Coast Guard Drawing 75-WAGL 4301-5, Rev N, Shafting Machining Details to Suit If 1312 MDE Coast Guard Drawing 75-WAGL 4400-3, Rev L, Propeller to Suit IF1312 MDE Coast Guard Drawing 75-WAGL-6700-001, Arrangement of Electronic Equipment and Block Wiring Diagram (Note 3) Coast Guard Drawing 75-WLR-6201-001, Modification to Bridge 12/24VDC Emergency Power System (Pilothouse) Coast Guard Drawing 75-WLR-6713-001, Electronic Charting System Block Wiring Diagram & Installation Details Coast Guard Drawing FL 1204-3, Rev A, Welded Padeyes & Links Coast Guard Drawing FL 533-001, Rev B, Placard Potable Water Flush Coast Guard Drawing FL 533-002, Rev -, Point of Use Water Filter Install Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly Coast Guard Drawing75E WLR 0103-1, Rev 1, Outboard Profile and General Arrangements Coast Guard Fleet Drawing FL 2602-10, Rev R, Spud Arrangements and Details Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2022, Coatings and Colors Manual Coast Guard Technical Publication (TP) 3173, SWBS 324, Navigation Light Panel Coast Guard Technical Publication (TP) 3494, 09-DEC-03, Shaft Seal - Type Fse Coast Guard Technical Publication (TP) 3494, 2013, Shaft Seal - Type FSE Coast Guard Technical Publication (TP) 5491, SWBS 256, Apr 2022, Keel Grid Cooler (Duramax) Fire Prevention and Response Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install New Deck Covering Systems Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary Hull Accesses Surface Forces Logistics Center Technical Standard (SFLC TS) 305, 2022, Electrical and Electronic Designating and Marking Surface Forces Logistics Center Technical Standard (SFLC TS) 313, 2022, Batteries

OTHER REFERENCES

American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects ASTM International (ASTM) B 843, 2007, Standard Specification for Magnesium Alloy Anodes for Cathodic Protection ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1709, 2008, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method ASTM International (ASTM) D1922, 2008, Standard Test Method for Propagation Tear Resistance of Plastic Film and Thin Sheeting by the Pendulum Method ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN) ASTM International (ASTM) D882, 2009, Standard Test Method for Tensile Properties of Thin Plastic Sheeting ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery ASTM International (ASTM) F683, 2014, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment Code of Federal Regulations (CFR) Title 29, Part 1915, Section 15, 2007, Shipyard Employment Code of Federal Regulations (CFR) Title 46, Part 111, Section.15, 1997, Battery Installation Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-Petrolatum Institute of Electrical and Electronics Engineers (IEEE), IEEE Std 45, Recommended Practice for Electrical Installations on Shipboard International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive MIL PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited) MIL-STD-2191, Nov 1992, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Nov 2011, Chapter 16, Cofferdams NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2020 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric Square D, Instruction Bulletin S1B33894, QO and Homeline Load Centers Installation Class 1100 The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning The Society for Protective Coatings SSPC-SP 10/NACE No.2, Jan 2007, Near-White Blast Cleaning The Society for Protective Coatings SSPC-SP 11, Jul 2012, Power Tool Cleaning to Bare Metal

xii
(REV-0)

Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

17
N
Wartsila FSE H74537-02 Face Changeout Kit (WLP001365-002)
NSN: 01-560-3273
2 ea.
6,690.00
18
N
Wartsila FSE H74537-02 Major Overhaul Kit (WLP001365-001)
NSN: 01-560-3274
2 ea.
7,680.00
24
Y
**Propeller, LH
NSN: 2010-01-534-9089
1 ea.
13,000.00
24
Y
**Propeller, RH
NSN: 2010-01-534-9095
1 ea.
13,000.00
26
N
***Fathometer Transducer, Shallow Water, 50-200 kHz (Airmar Technology SS505)
NSN: 5845-01-470-2500
1 ea.
343.63
27
Y
**2 1/2 inch Duplex Strainer
Hayward, Model # B148
1 ea.
1,338.90
28
N
Water Filter Assembly
PN: DWS160-L (3M) NSN: (ACN) 44330-01-F20-5959
2 ea.
160.00
28
N
Water Filter Element
PN: 56134-44 (3M)
2 ea.
180.00
29
Y
**Rudder - Steering
NSN: 2040-01-530-9095
2 ea.
42,634.59
29
Y
**Rudder - Flanking
NSN: 2040-01-531-4393
2 ea.
51707.25
29
N
**Upper Rudder bearing (SKF PN 23222CC/W33)
NSN: 3110-01-F11-2241
4 ea.
709.75
29
N
Rudder EL Seal, Major Overhaul Kit (WLP-001427001)
NSN: 5330-01-646-5935
4 ea.
3,795.62
44
Y
*Transducer Cover Plate
N/A
1 ea.
50.00
57
N
***Fathometer Transducer, Shallow Water, 50-200 kHz (Airmar Technology SS505)
NSN: 5845-01-470-2500
1 ea.
343.63
67
N
Strainer, Sediment, Simplex (Flanged)
4730-01-428-3199 / ST0720400F1C
1 ea.
$5,200.00
68
N
Water Filter Assembly
PN: DWS160-L (3M) NSN: (ACN) 44330-01-F20-5959
2 ea.
160.00
68
N
Water Filter Element
PN: 56134-44 (3M)
2 ea.
180.00
74
Y
*Transducer Cover Plate
N/A
4 ea.
50.00
75
N
INVERTER/CHARGER, 2 KVA, 120VAC, 24VDC, VICTRON MULTIPLUS C 24/2000/50-50 120V
NSN: 6130-17-127-1455 P/N: CMP242020100
1 ea.
1,250.00
75
N
D34M Marine Deep Cycle Blue Top Battery, 750CCA, Optima Group
NSN: 6140-01-475-9355 P/N 8016-103
2 ea.
251.91
76
N
BLUESEA 3 POSN 300A BATTERY SELECTOR SWITCH, M-SERIES
BLUE SEA SYSTEMS PN: 6008 NSN: 5930-01-F18-5368
1 ea.
$59.49
76
N
MIL-C-24643/15, TYPE LSDSGU-4
NSN: 6145-01-202-2795
100 ft.
$0.80
76
N
MIL-F-24646/2, FUSE BOX (Hulls: 75404 & 75402 only)
NSN: 5920-00-178-1616
1 ea.
$986.30
76
N
MIL-C-24643/15, TYPELSDSGU-75 (Hulls: 75404 & 75402 only)
NSN: 6145-01-202-3477
50 ft.
$8.20
80
N
J-Box Navigation Light Panel
P/N: NLFM15DUG24DCGDFLMOWL
1 ea.
$ 4,580.00
80
N
Iota Engineering DLS-27-15 Battery Charger / Power Converter
P/N: DLS-27-15 FSC: 6130
1 ea.
$ 230.00
80
N
McDermott Masthead Lt, 5 nm vis
TB5LED-MAST-24-P-DH-30FT
1
$990.00
80
N
McDermott PORT Running Lt, 2 nm vis
TB2D-PORT-24-P-DH-30FT
1
$660.00
80
N
McDermott STBD Running Lt, 2 nm vis
TB2D-STAR-24-P-DH-30FT
1
$660.00
80
N
McDermott Stern Lt, 2 nm vis
TB2D-STERN-24-P-DH-30FT
1
$660.00
80
N
McDermott Amber Signal Lt, 3 nm vis
TB3D-78-AMBER-24-P-30FT
2
$363.00
80
N
McDermott Red Signal Lt, 3 nm vis
TB3-78-RED-24-P-30FT
2
$363.00
80
N
McDermott White Signal Lt, 3 nm vis
TB3-78-WHITE-24-P-30FT
2
$363.00
80
N
McDermott PORT Running Lt, 2 nm vis
TB3-PORT-24-P-DH-30FT-BRKT
1
$990.00
80
N
McDermott STBD Running Lt, 2 nm vis
TB3-STAR-24-P-DH-30FT-BRKT
1
$990.00
80
N
McDermott Barge Special Flashing Lt, 2 nm vis
TB-266-TOW-24-P-DH-180-30FT-BRKT
1
$990.00
80
N
Enersys Backup Battery
PN: NP7-12 NSN: 6140-01-365-7743
2
$30.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter

xv
(REV-0)

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item
Title
3
Hull Plating, U/W Body, Ultrasonic Testing - Tender
5
U/W Body, Preserve, 100 percent - Tender
9
Appendages, U/W, Leak Test - Tender
11
Voids, Non-Accessible, Leak Test - Tender
13
Tanks, MP Fuel Service, Clean and Inspect - Tender
17
Propulsion Shaft Seals, Mechanical Clean and Inspect
18
Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew
19
Propulsion Shafting, Remove, Inspect, and Reinstall
20
Propulsion Shaft Bearings, External, Renew
21
Propulsion Shaft Bearings, External, Check Clearances
27
Sea Strainers, Duplex, All Sizes, Overhaul
29
Rudder Assembly, Remove, Inspect And Reinstall
44
Drydock - Tender
48
Hull Plating, U/W Body, Ultrasonic Testing - Barge
52
Appendages, U/W, Leak Test - Barge
54
Tanks, MP Fuel Service, Clean and Inspect - Barge
56
Tanks, Ballast, Clean and Inspect - Barge
62
U/W Body, Preserve, 100 percent - Barge
67
Sea Strainers, Duplex, All Sizes, Overhaul - Barge
74
Drydock - Barge
75
Bridge Equipment Emergency Power System, Install
xvii
(REV-0)

Principal Characteristics - Tender 75’ WLR (E-Class: CGC KANAWHA), INLAND RIVER BUOY TENDER

PhysicaL

Length overall
75' 5-1/2"
Depth
7' 8-1/2"
Maximum beam
22' 5"
Height of highest projection
N/A
Full load draft
4' 0 1/2" LCF Draft
Full load displacement
129.27 Long Tons SW
Shore tie voltage requirements
N/A
Frame spacing
1' 6"

Machinery

Number of propellers
2
Number of blades
4
Diameter of propeller
48"
Pitch
47" fixed
RPM
410
xviii
(REV-0)

Principal Characteristics - Barge 130' CGB, Barge

Physical

Length overall
130' 0"
Depth
7' 6"
Maximum beam
30' 0"
Frame spacing
15" - 30"
Full load draft
4’ 3" (LCF Draft)
Full load displacement
240.76 Long Tons SW

1 (REV-0)

00000_0623_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121) General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

Coast Guard Drawings None Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire Protection and Response work item, as applicable, during the performance of this availability.

3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.

3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, seven (7) days before the Arrival Conference.

note NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents. Contractors can apply to NAVSEA headquarters directly for copies.

3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken. Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

· ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

· ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm. For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet; for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:

· SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

· SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-130.

3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.

3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 are considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).

3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.

3.7.1 None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (Frame References)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean
SSPC-SP-10/NACE No. 2
£
SSPC-SP WJ-2/NACE WJ-2
£
SSPC-SP-3
£
SSPC-SP-11
£
SSPC-SP-11 (inaccessible area)
£
Brush-blasting (non-metallic substrate)
£

Abrasive Manufacturer:

Abrasive Sieve Size:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean
SSPC-SP-10/NACE No. 2
£
SSPC-SP WJ-2/NACE WJ-2
£
SSPC-SP-3
£
SSPC-SP-11
£
SSPC-SP-11 (inaccessible area)
£
Brush-blasting (non-metallic substrate)
£

Abrasive Manufacturer:

Abrasive Sieve Size:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):

Mean Reading (mils)

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

Date
Test Locations
Conductivity (Microsiemens/CM)
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time
NAME of CG Representative
Signature
Unit
DATE/TIME

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time