This Statement of Work (SOW) outlines requirements for upgrading the Giant Voice (GV) mass notification system at Pittsburgh Air Reserve Station (ARS), PA. The project involves transitioning from copper infrastructure to a radio frequency (RF) system.
The contractor must Engineer, Design, Furnish, Install, and Test (EDFI&T) the RF upgrade to connect two existing outdoor GV poles with Federal Signal siren arrays and an indoor controller in Building 110 to activation points in Buildings 418 (Command Post), 125 (alternate Command Post), 221 (BDOC), and 208 (alternate BDOC). Key requirements include: installing Motorola APX4500 radios at seven locations, providing new software for system monitoring in Building 405, ensuring intelligible voice coverage across the base while minimizing community noise bleed-over, installing backup power systems (72-hour battery backup for sirens, 4-hour for control stations), and providing comprehensive testing, training for up to 20 personnel, and one year of warranty coverage. The period of performance is 180 days after contract award, with work to be performed during normal duty hours (0800-1600 local time).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Combined Synopsis final r1.docx | DOCX document | |
| Attachment 3 - Offer Pricing Template.docx | DOCX document | |
| Attachment 1 - Combined Synopsis final.docx | DOCX document | |
| Attachment 4 - WD 2015-4235.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
GIANT VOICE SYSTEM UPGRADE
At
Pittsburgh ARS, PA
17 Sept 2024
Prepared By 38 ES/ENIU Tinker AFB, OK 73145
[Type here] [Type here] [Type here]
1.0 SCOPE
This statement of objectives (SOW) defines the requirements for the Contractor to Engineer, Design, Furnish, Install, and Test (EDFI&T) a radio frequency upgrade to the Giant Voice (GV) System at Pittsburgh ARS, PA. The current GV system consists of two (2) outdoor GV poles, which includes omni-directional Federal Signal siren arrays, and in-building siren controller in building 110 and activation points in buildings 418 (Command Post), 125 (alt. Command Post), 221 (BDOC) and 208 (alt BDOC) using the existing copper infrastructure. The existing copper infrastructure has degraded and Pittsburgh ARS requires transition to a RF system for the Giant Voice. Upon completion, the GV system shall be able to communicate over a new wireless, Radio Frequency (RF) communications infrastructure. The upgraded GV system shall provide sufficient intelligible voice coverage for the entire base populace with real time emergency alerting messages and accurate system health activities. This project covers the following technical objectives:
1.1 The contractor shall install the new radio frequency (RF) Giant Voice two-way communications infrastructure; Radios will be installed in seven (7) locations including the 4 activations points (bldgs. 418, 221, 125 and 208) and at the 3 siren controller locations (the two outdoor GV poles and the indoor siren controller in bldg. 110). RF Frequency for the GV system shall be determined at a future date, i.e. TDB. The audible siren speaker messages shall be optimized, tested, controlled, and adjusted to minimize bleed-over noise into the surrounding communities, i.e., have volume control capabilities.
1.2 The Giant Voice is monitored and maintained by personnel in the Communication Squadron in building 405. Base personnel use an existing PC-based Controller Console to monitor the system. In building 405, the contractor shall provide and install the most current software capable of providing detailed graphics screen and customized range map for control, activation, monitoring, and display of siren status and GV system health status.
1.3 The contractor shall provide a solution using new RF communications equipment to provide intelligible live voice and pre-recorded messages for the Pittsburgh IAP-ARS, PA populace.
1.4 The contractor shall provide all personnel, equipment, installation, configuration management, labor, material, documentation, and services in support of this project. Services shall include project management and systems engineering services in support of the design, system staging, site preparation/development, equipment installation and optimization, acceptance testing, training, and one year warranty. The contractor shall perform all necessary efforts in the completion of this project to receive system acceptance.
2.0 REQUIREMENTS
2.1 GENERAL REQUIREMENTS. The Pittsburgh ARS Giant Voice System currently has two (2) GV poles with Federal Signal speaker arrays. The upgraded GV system shall enable communications over the new RF infrastructure from the four (4) activation points to the two (2) existing outdoor Giant Voice poles/towers and to the existing indoor controller unit (Bldg 110). See Figure 1.
The contractor shall provide all equipment, software, wiring, electrical power, materials, transportation, labor, supervision, management, and incidentals necessary to EDFI&T the upgraded GV system as stated in this SOW. All equipment and materials provided shall be new and not refurbished.
2.1.1 Safety Requirements
2.1.1.1 Site Coordination. The Contractor shall meet with the base safety officer immediately upon arrival on site for review of the specific safety requirements prior to installation.
2.1.1.2 Accident/Incident Reporting and Investigation. The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel to the Base Safety Office unless otherwise stated in the SOW. The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the Base 911CS/SCX. If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.
2.1.1.3 Confined Space. N/A
2.1.2 Security Requirements
2.1.2.1 Security Clearances. Some of this work may take place in secure areas where Contractor employees shall be escorted at all times. It is the Government's responsibility to provide escorts. The primary contractor shall provide adequately cleared personnel for the performance of this contract. Contract personnel required to perform work within the Command Post do not require a Secret security clearance; Contractor shall confirm this with 911CS/SCX.
2.1.3 Environmental Management. The Contractor shall comply with the most stringent environmental, local laws and regulations, and Air Force policies, instructions, plans, and directives. The Contractor shall maintain an awareness of changing environmental regulatory requirements to avoid environmental deficiencies for activities on Pittsburgh ARS, PA. The Prime Contractor shall ensure their sub-contractors comply with these specifications.
2.1.4 Contractor Personnel
2.1.4.1 Project Management. The Contractor shall provide a Project Manager (PM) and alternate(s) responsible for contract performance and continuity. The Contractor shall identify the Project Manager’s or alternate's range of authority to act for the Contractor relating to daily contract operation. The contractor’s PM shall sign Section 11A. (Installation Activity) on AFTO Form 747 Cyberspace Infrastructure System Acceptance Form which is used as a system commissioning document at the completion of the project. The form will be provided by 911CS/SCX.
2.1.4.2 Site Point of Contact (POC). The Contractor shall designate the Contractor's on-site team leader and alternate(s) as the Site POC for individual projects in their Site Visit Request Letter. The Site POC or alternate(s) shall be on site during duty hours until project completion. The Site POC shall be the interface for all work site communications with the Government, including quality, safety, and discrepancy matters.
2.1.4.3 Personnel Requirements. The Project Manager, Site POC, and respective alternate(s) shall be able to read, write, speak, and understand English.
2.1.5 Warranty. The Contractor shall warranty the products of its manufacturer to be free from defective materials and workmanship. Break-fix support for hardware, software, speakers, wiring, and any and all other unspecified components of this system related to the new GV system shall be provided for one year after the GV system acceptance date, to include all field trips, telephone support, and shipping costs.
2.1.6 Manuals and Practices. The Contractor shall provide the latest version of operation, installation, overview system schematics, maintenance manuals and practices, users guide for each system installed, as provided by the original manufacturer with all new equipment.
2.1.7 In-brief/Out-brief. The Contractor shall conduct an in-brief with the site POC (911CS/SCX) or designated representative at the beginning and conclusion of the project. The in-brief shall inform the customer of implementation plan and necessary support issues. The out-brief shall inform the customer of implementation results and necessary maintenance issues (including warranties).
3.0 SPECIFIC REQUIREMENTS
3.1 RF Requirements. The contractor shall EDFI&T the new, two-way, radio frequency (RF) communications infrastructure for the Giant Voice system. The contractor shall use existing siren speaker arrays and install new Motorola APX4500 radios. All radios shall be J/F-12 certified and compliant. The radios shall use the new (TBD) frequency that is acquired for use by the GV system. Contractor shall confirm frequency with 911CS/SCX.
3.1.1 The Contractor shall ensure that the two (2) omni-directional speakers provide sufficient audible voice coverage for the base populace over RF.
3.1.2 The contractor shall ensure the appropriate voltage and current are provided to power all the GV components at each location. The contractor shall test the voltage, current, wire size, distance, transformer size, fuses, breakers, batteries and other variables to ensure they are correctly utilized to drive the new load.
3.1.3 The contractor shall coordinate with 911CS/SCX and Base Civil Engineering before energizing all new power loads.
3.1.4 If new enclosures are necessary to house the new equipment, the Contractor shall install the proper weatherproof head and liquid tight devices and weatherproof sealants to prevent moisture, water, and insects from entering the dedicated electrical, communication systems and enclosures. If new conduit is required for any new cabling, the Contractor shall install 2-inch electrical PVC tubing conduits, weatherproof and waterproof sealants, connectors, couplings, straps, tape, and cable ties for securing power cables and siren speaker wires.
3.1.5 The Contractor shall provide new backup batteries to power the sirens and display battery voltage status. Batteries shall be Gel-cell batteries with a minimum 800 cold cranking amps. The Contractor shall ensure proper grounding for the GV poles and associated speaker assemblies, IAW NECs, NFPA 780 and UL96A standards.
3.1.6 The Contractor shall install proper lightning protection for the SCUs, radios, and radio antennas.
3.1.7 The contractor shall install the required omni-directional antennas, antenna cables, connectors, and brackets, which will be connected to the new radios (Motorola APX4500).
3.1.8 The contractor shall install the fiberglass omni-directional antenna, antenna cables, connectors, and brackets, which will be connected to the new radios (Motorola APX4500) in the communications/equipment rooms of buildings 418(CP), 125 (alt CP), 221 (BDOC) and 208 (alt BDOC) and at the siren controller locations at the 2 outdorr poles and in Building 110 which contains the existing indoor control unit (ICU), i.e., Federal Signal UV25ST. Contractor shall confirm with 911CS/SCX (and/or Command Post personnel) for the exact locations.
3.1.9 The siren control units shall be sized with the appropriate number of 12V batteries for the speaker arrays. The Giant Voice equipment on the poles shall be powered by existing primary 120V AC power source, see Table 1. The contractor shall coordinate and confirm with Base Civil Engineering for power requirements, if necessary.
3.1.10 Upon project completion the contractor shall provide configuration management, the as-built drawings, detailed system communications schematics, and documentation of the installed system, in PDF format, including the predicted and tested audible coverage areas.
3.2 Installation Requirements.
3.2.1 Restoration. Any wall penetrations performed by the contractor shall be restored to meet NFPA 1, NFPA 70 and NFPA 72 and Local CE (civil engineering) standards.
3.2.2 Grounding. The contractor shall provide new ground copper cable to the Telecommunication Main Ground Bus-Bar (TMGB), near the terminal in all communication rooms. Contractor shall properly ground the GV equipment, associated devices, wirings, siren speakers, SCUs, poles, all site facilities, structures, inside and outside, for personnel safety and equipment protection. Grounding and lightning strike protection shall meet requirements as set forth in MIL-STD 188-124C, Grounding, Bonding and Shielding, and Technical Order (TO) 31-10-24 Installation Practices – Communication Systems Grounding, Bonding, and Shielding.” Contractor shall adhere to electrical power requirements IAW NFPA 780, UL 96A, and the most recent edition of National Electric Code, along with base, local, state, & federal laws and standards, including those in paragraph 5.1.
3.2.3 Bonding. Shield bonding connectors, bond bars, braids, ribbons, clamps, etc., shall be provided to maintain cable shield continuity at splices and at ground connections. Bonding connectors shall be provided IAW the Rural Utilities Service (RUS) Bulletin 1753F-803 (PE- 33), building electrical system Articles 230, 250, 280, 800, 810 of the NEC, and MIL-HDBK 419A Vol. I and II, Grounding, Bonding & Shield for Electronic Equipment & Facilities. Shields shall be grounded and continuous throughout the cable distribution system.
3.2.4 Power Source. The Contractor shall ensure adequate electrical power for the ICU, SCUs, radios and Central Control Units. The SCU on each GV pole shall operate on primary electrical (120VAC) power. The Contractor shall ensure AC circuit extension to each GV pole from the power source circuit, including an electrical safety disconnect box, circuit breaker, and conduit/PVC. All exterior power cable runs shall be completely enclosed in conduits/PVCs and installed underground where required, and all power cable feed-thru holes shall be completely sealed.
3.3 Giant Voice (GV) System Installation. Contractor shall install an RF communications GV system utilizing the existing (2) omni-directional Federal Signal speaker arrays. The speakers shall provide adequate GV coverage and minimize bleed-over into the local, surrounding communities.
The Giant Voice system is maintained and monitored by personnel located in the Communications Squadron building 405. Maintenance personnel currently use an old Federal Signal Commander software package. The contractor shall provide and install the most current software capable of providing detailed graphics screen and customized range map for control, activation, monitoring, and display of siren status and GV system health status. The software will be installed on a government provided computer in building 405.
3.3.1 The Contractor shall use the existing two (2) outdoor siren controller units and SCU enclosures. The contractor shall install lightning arrestors for protecting the radio transceivers.
3.3.2 Features and Capabilities. The upgraded GV system shall provide the following features and capabilities:
3.3.2.1 The siren speakers shall deliver alerts, threats, exercises, warnings, and informational messages and be capable of activation from the activation points at 418, 125, 221 and 208 over RF.
3.3.2.2 The operators at the activation points shall be able to transmit over RF emergency announcements as live intelligible voice messages to alert and warn base personnel through remote siren speakers via microphone to any individual zone, group of zones, or all zones’ speakers.
3.3.2.3 The Contractor shall ensure the orientation of the speakers provide sufficient intelligible voice and tone coverage. The GV system shall have volume control capability that can be controlled at the poles. The software shall have the ability of providing volume control for all poles, groups, or individual poles without having to physically visit each location.
3.3.2.4 A detailed sound propagation analysis shall be performed to optimize intelligible voice coverage.
3.3.2.5 The Contractor shall provide the latest software versions for the upgraded GV system.
3.3.2.6 The GV system shall allow operators to activate remote siren controllers independently, in groups, or an entire system. The system shall be equipped with a silent test diagnostic that allows it to test all major system components without producing an audible signal.
3.4 System Interface. The Giant Voice system shall allow the activation of target siren or speaker via RF or dry-contacts or audio-in input.
3.5 Line of sight. The Contractor shall ensure adequate and sufficient line of sight from 418, 125, 221 and 208 to all siren poles for activation, control, and status monitoring.
3.6 Activation Points in Bldgs 418, 208, 125 and 221: The Motorola APX4500 radio shall be installed in the designated communications room. The antenna cable shall be installed and connected to the fiber glass omni-antenna. The electrical power outlet shall be available for the radio power. The control station will primarily communicate over the wireless RF communications infrastructure to all remote GV siren poles. Contractor shall confirm all equipment placement (locations) with 911CS/SCX and CP personnel.
3.7 Backup Power for Control Stations. The contractor shall provide each central control station, not protected by a facility UPS, with its own backup power (UPS) to maintain operations during temporary losses of base utilities. Backup power capacity for Fire Alarm systems is defined in the National Fire Alarm Code, NFPA 72 and section 5.1. As stated in Annex of NFPA 72, mass notification systems should have the same backup power capacity as fire alarms. NFPA 72 states that the secondary supply for the control station shall be capable of supporting alarm operation for a minimum of 4 hours.
3.8 Backup Power for Siren Speaker Locations and remote Indoor Controller Unit (ICU). Each siren speaker location and ICU shall have new batteries backup power to maintain operations during emergencies that could result in temporary loss of normal base utilities IAW NFPA 72. The ICU and each siren speaker shall have batteries which are charged and shall be capable of operating the system under quiescent (non-alarm) load for a period of 72 hours and also shall be capable of operating the system under an emergency condition for 60 minutes at maximum connected load.
3.9 Wiring and Infrastructure. The contractor shall provide and install new RF cables and devices to provide reliable RF communications over the GV system.
3.10 Electrical Power. Contractor shall use the existing and specified electrical power sources to provide power to the GV system. The base Civil Engineering (BCE) will identify the facility and power for supplying the electrical power. Coordinate with Civil Engineering Electrical Shop on power removal, modification, and/or installation feeds at each site. Installations must comply with NFPA 70 (National Electric Code) and UFC 3-520-01 low voltage requirements.
3.11 Coordination. All support shall be coordinated with and approved by 911CS/SCX and base CE.
3.12 Onsite Training. Upon completion of the installation process, the Contractor shall provide User Training to the designated Site Staff in accordance with the customer requirements. User training shall include step-by-step instructions on the utilization of all features of the new system as well as basic system troubleshooting. The Contractor shall provide operational training to the users and system training to the Operators/Maintainers as needed. Instructional sessions shall be permitted to be videotaped for future training purposes. The Government shall retain the right to duplicate and distribute the training material for future training purposes. This training shall include setup, configuration, operations, and user diagnostic, repair and replacement. The contractor shall coordinate with the 911CS/SCX to obtain a classroom for the instruction on the system, include the operational and maintenance requirements of the system for up to twenty (20) students utilizing a government approved training plan.
3.13 Debris Removal and Site Restoration. The Contractor shall remove equipment (electronics, cabling, and power) which is not used in the project, to include all spares. Coordinate with Civil Engineering Electrical Shop on power removal, modification, and/or installation feeds at each site. Installations shall comply with NFPA 70 (National Electric Code) and UFC 3-510-01 low voltage requirements. All equipment and residuals from this project including amplifiers, wiring, conduits, and cabling shall be disposed of or handed over to the Defense Realization and Marketing Office (DRMO) at Pittsburgh ARS, PA or as directed by the contracting officer, IAW environmental laws and regulations at Pittsburgh ARS, PA. Prior to project completion, the contractor shall remove all debris and surplus materials from the work site. Equipment and materials required to complete the work effort may remain on site as long as they are organized/stored in a manner that does not cause a safety hazard. The contractor shall restore the soil, ground, and all disturbed areas to their original conditions upon completion of the installation.
3.14 Final Acceptance. The Contractor shall schedule a final project walk-through and complete system test of all work completed prior to close out with the government representative from 911CS/SCX. This should be scheduled at least 5 calendar days prior to the acceptance. The contractor shall perform testing and inspections of the GV systems IAW the approved test plan. When any system, subsystem, component or requirement test fails to meet the requirements of the test, Government acceptance will be withheld until such time as the cause of the failure is corrected to the Government’s satisfaction. After appropriate corrective action has been taken, all tests including those previously completed, related to the failed test and the corrective action shall be repeated and successfully completed prior to Government acceptance.
3.15 Service Outages. The Contractor shall be responsible for preventing any unscheduled (i.e., cutting or disabling any in-service cables or equipment), Contractor-caused interruptions of communications capabilities. The Contractor shall coordinate planned outages with 911CS/SCX, seven (7) days in advance of the outage if the implementation necessitates disruption of services, (e.g., communications, electrical, or other utilities).
3.16 Identification/Marking. The Contractor shall clearly mark all Contractor-Furnished Property and Equipment (CFP/CFE) with their company's name. The Contractor shall place an easily read, very visible, sign (minimum 8.5" x 11") on large containers, construction equipment, or un- manned rental vehicles while on the Government installation indicating the company name and both the Contractor and Site POC's names and local telephone numbers. The contractor shall label all equipment and cables they install in accordance with ANSI/TIA/EIA-606-A-2002. The Contractor is responsible for coordinating and paying any repairs to base infrastructure caused by damage made by the Contractor through negligence or failure to adhere to installation Civil Engineering authority’s guidance on existing infrastructure (cables, power lines, equipment, etc.).
3.17 Red-Line and As-Built Drawings. The contractor shall submit drawings showing the “as built” configuration in Visio format, along with PDF format. The As-Built Drawings shall include the locations of all existing and new tower locations; the GPS coordinates of each tower location, the logical diagram of the new integrated GV system, the facility location of the GV equipment, a floor plan of the room location, power source facilities and connections, a rack elevation plan of the integrated GV equipment, and tested coverage areas for Pittsburgh ARS, PA. The coverage area drawings shall be shown on a satellite image of the coverage areas with the street names, facility locations and other geo-references shown.
3.18 Restricted Access Areas. Pittsburgh ARS, PA may have some restricted areas where access is limited and requires Government escorts. The contractor shall coordinate with the 911CS/SCX, 14 calendar days in advance for escorts and accessibility.
3.19 Test Plan. The contractor shall submit a written test plan that details how they will test the new GV system and ensure compliance with Unified Facilities Criteria (UFC) 4-021-01. In addition, the contractor shall submit written step-by-step and troubleshooting instructions to system operator(s) for conducting periodic system tests. The test plan shall include the Cutover Plan. The new GV system shall be tested and demonstrated to the Government that the system is fully operational and meets or exceeds the specified requirements and that the system is fully ready to be placed into service. The Contractor shall also test and demonstrate the GV system to the Government Quality Assurance evaluator .
3.20 Acceptance/Installation Test Report. The contractor shall provide an installation test report of the results of the testing accomplished under the installation test plan.
3.21 Cutover Plan. The Contractor shall provide a detailed cutover plan and schedule to delineate how the transition shall be implemented to minimize or avoid the existing GV system operation down time. This plan shall outline how the system shall be placed into service and clearly specify how the newly installed system shall connect to the existing GV RF infrastructure and network alerting system.
3.22 Testing Requirements. The Contractor shall furnish all test equipment and personnel required to conduct all required testing. The Contractor shall perform the testing, optimize, and adjust the speaker volume level to prevent excessive distortion/echo of the voice message which will decrease intelligibility to unacceptably low levels. The Contractor shall conduct a live voice test and government personnel will listen and assess the intelligibility/clarity of the voice announcement at a distance of 2000 ft away from each siren pole. The Contractor shall document all test results in a “Test Report(s)” and submit to 911CS/SCX, 38 ES/ENPC within five (5) business days of completion of each test. During any testing phase, the Government reserves the right to perform any of the Contractor performed inspections and tests to ensure solutions conform to prescribed requirements. The Contractor shall bear the burden of any and all undisclosed costs. The Contractor shall provide on-site support during the acceptance testing.
3.23 RF Communications/Line of Sight Test. The contractor shall test digital two-way RF transmit and receive communications signals from the Central Control Stations and antennas to the remote Siren Controller Units, remote ICU, and antennas. Tests shall be accomplished to ensure robust, end-to-end, digital two-way RF communication signals strength of the GV system.
4.0 GENERAL INFORMATION
4.1 Period of Performance. The period of performance shall be determined by the winning Contractor bid but should not exceed 180 days after date of contract. All work including installation, training, testing, and acceptance shall be completed within this timeframe.
4.2 Place of Performance. The place of performance is at Pittsburgh IAP-ARS, PA.
4.3 Hours of Operation. The Contractor shall perform the services required under this contract during normal duty hours of the facility where work is being performed at Pittsburgh ARS, PA. Normal duty hours are: 0800 – 1600 local time. Any other work schedule outside of normal duty hours requires 911CS/SCX and Contracting Officer (CO) approval. The Contractor shall not perform work under this contract on US or Federal/bank holidays or site- unique down-days unless expressly authorized by the CO and coordinated with the host base 911CS/SCX.
Part or all of the facility may be occupied during this effort. Contractor shall accomplish the installation with minimum disruption of daily office activities. If performance of work outside normal duty hours will be required to meet the scheduled dates stated above, include desired working hours in the Proposal.
4.4 Base Support. The laydown and dry storage areas will be provided upon request. The contractor shall request the amount of storage in their proposal and secure this area if needed. If the base cannot provide the request area, the contractor will be required to find another area.
5.0 GOVERNMENT FURNISHED EQUIPMENT/STANDARDS/DELIVERABLES
· Two existing galvanized steel poles, Federal Signal siren arrays
· Four SS2000 central controllers, one At Hoc IIM
· Two outdoor Siren Controller units at the existing poles
· One in-building Siren Controller Unit, B-110
· One computer in building 405 for new software installation
5.1 Government Applicable Documents and Standards. The contractor shall comply with these documents during the performance of this Task Order. The contractor shall obtain and comply with any other applicable manuals not identified above that would be required to meet industry and DoD standards. This list includes, but is not limited to, the following:
· UFC 4-021-01; 9 Apr 2008, change 1, Jan 2010 - Design and O &M: Mass Notification Systems
· UFC 4- 010-01/02 - Minimum Antiterrorism Standard for Buildings
· AFI 10-2501 - AF Emergency Management Program Planning and Operations
· Executive Order 13407, 28 Jun 2006 - National Public Alert and Warning System
· Secretary of Defense Memorandum: Final Recommendations of the Ft Hood Follow-On Review, 18 Aug 2010
· DoDI 6055-17, 13 Jan 2009 - DoD Installation Emergency Management (IEM) program incorporating change 1, Nov 19, 2010
· OSHA CFR 29 Part 1910-268 - Telecommunications
· REA TE&CM 701/PC-5A - Rural Electrification Administration (REA) REA TE&CM 643 Form 515C - Rural Electrification Administration (REA)
· Motorola Standards and Guideline for Communications Sites “R56” 68P81089E50 manual
· Technical Order (TO) 31-10-24 “Installation Practices – Communication Systems Grounding, Bonding, and Shielding”
· NEMA TC 2- Electrical Polyvinyl Chloride (PVC) Tubing and Conduit
· ANSI/TIA/EIA-568-B - Commercial Building Telecommunications (568B-1, 568B-2, 568B-3) Cabling Standard
· ANSI/TIA/EIA-569-A - Commercial Building Standard for Telecommunications Pathways and Spaces
· ANSI/TIA/EIA-606-A - Administration Standard for the Telecommunications Infrastructure of Commercial Buildings
· ANSI/TIA/EIA-607 - Commercial Building Grounding and Bonding Requirements for Telecommunications
· ANSI/EIA-310-D - Cabinets, Racks, Panels, and Associated Equipment
· BICSI TDM Manual - Building Industries Consulting Services International Telecommunications Distribution Methods (TDM) Manual
· RUS Bulletin 1751F-640 - Design of Buried Plant-Physical Consideration RUS Bulletin 1751F-641 - Construction of Buried Plant
· RUS Bulletin 345-65 (PE-33) - RUS Specification for Shield Bonding Connectors
· ANSI/TIA/EIA-606 - Administration Standard for Commercial Telecommunication Standard PVC) Tubing and Conduit
· NFPA 70 - National Electric Code
· NFPA 72 - National Fire Alarm Code
· AFI 91-203, Chapter 23 - Air Force Consolidated Occupational Safety Instruction
· Unified Facilities Code (UFC) 3-520-01 (2012), Interior Electrical Systems
· UFC 3-560-01, Electrical Safety, O&M
· NFPA 70E, Standard for Electrical Safety in the Work Place.
· Pittsburgh ARS, PA Electrical Standards and Environmental Policies and Regulations
· UFC 3-510-01 Low Voltage Requirements
· NFPA 780 and UL 96A standards
· Instruction 32-2001 - Fire Emergency Services Program International Building Codes (IBC) of 2012
· Pittsburgh IAP-ARS Safety Rules and Procedures
5.2 List of Deliverables. All deliverables are subject to Government acceptance and approval. They shall meet professional standards, and the requirements set forth in this SOW. All deliverables shall be produced using recommended software tools/versions as accepted by the Government. The Contractor shall submit the following deliverables:
| CDRL |
| Data Item Title |
| Data Item Title |
| Required Date |
| A001 |
| As Built |
| DI-DRPR-80151A/T |
| Prior to final acceptance of the project |
| A002 |
| Test Plan & Cutover |
| DI-NDTI-80566A/T |
| Within 30 days after date of contract |
| A003 |
| Test Report |
| DI-QCIC-80512 |
| Within 3 days after testing |
| A004 |
| Training Plan |
| DI-ILSS-81070/T |
| Within 60 days after date of contract |
CONTROLLED UNCLASSIFIED INFORMATION
Pittsburgh ARS, PA Page 1 of 2
Table 1. Giant Voice System Requirements, Pittsburgh IAP-ARS
| # |
| GV pole/Tower Description |
| RF Type (Freq TBD) |
| Radio |
| Speaker Arrays |
| Power Source: |
| 1 |
| GV #1, |
near B-6492 (and B-130)
| VHF |
| Motorola APX4500 |
| 800 Watt; Omni-directional |
| Existing Primary AC and new 12V Batteries |
| 2 |
| GV #2, |
near B-325
VHF
Motorola APX4500
| 800 Watt; Omni-directional |
| Existing Primary AC and new 12V Batteries |
| 3 |
| In-bldg Controller, ICU, (B110) |
VHF
Motorola APX4500
N/A Existing Primary AC and new 12V Batteries
Command Post, B418
VHF
Motorola APX4500 N/A
Existing Primary AC and new Smart UPS
| 5 |
| Alt CP, B125 |
VHF
Motorola APX4500
N/A
Existing Primary AC and new Smart UPS
| 6 |
| BDOC, B221 |
VHF
Motorola APX4500
N/A
Existing Primary AC and new Smart UPS
| 7 |
| Alt BDOC, B208 |
VHF
Motorola APX4500
N/A
Existing Primary AC and new Smart UPS
APPENDIX: Giant Voice System Requirements – Pittsburgh IAP-ARS, PA
Figure 1: GV locations image1.png