Attachment 2_Fume Hood PRS 22-R-0007.pdf

PDF 122 KB Posted

Attached to
Inspection, Testing and Certification of Fume Hoods, Biosafety Cabinets, and Cleanrooms
Solicitation number
W911RX-22-R-0007
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The standard should relate to timeliness, quality, or quantity (metrics) of service required by the Contractor is stated in the PWS verbiage. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

(The Service required— usually a shall statement)

Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Incentive (Positive and/or

Negative)

1. Combating Trafficking in Persons FAR 52.222-50 c

The Contractor shall Notify its employees of

a. The United States Government's zero tolerance policy described in paragraph

(b) of this clause

The actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment.

100% Compliance Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR system;

contractor shall re-perform the service

PRS 1.

Equipment and Clean Rooms PWS para 5.1

Contractor shall perform testing, and certification for the rooms and equip. listed in

PWS.

98% Compliance Non-conforming services will result in non-conforming reports issued to Contractor and potential negative FAPIIS report.

PRS 2

Invoicing PWS para. 4.1.4.

Contractor shall submit 2-n-1 invoice to PIEE 100% Compliance Non-conforming services will result in non-conforming reports issued to Contractor and potential negative FAPIIS report.

PRS 3

Testing and Certification Regulations PWS para. 5

Contractor shall comply to standards and regulations referenced in this PWS

98% Compliance Non-conforming services will result in non-conforming reports issued to Contractor and potential negative FAPIIS report.

PRS 4

Biological Safety Cabinets and Fume Hoods PWS para. 5.1.1, 5.2.1, 5.6.1, 5.6.2., 5.6.3.

Tests to be performed will include the tests listed in this PWS

98% Compliance Non-conforming services will result in non-conforming reports issued to Contractor and potential negative FAPIIS report.

ATTACHMENT 2

Performance Requirements Summary

PRS 5

Service Report PWS para. 5.7

Service Report shall include information listed in 5.7.1 of this PWS

98% Compliance Non-conforming services will result in non-conforming reports issued to Contractor and potential negative FAPIIS report.

PRS 6

Certification Documentation PWS para.

5.4

Contractor shall supply certification documentation as required

100% Compliance

Non-conforming services will result in non-conforming reports issued to Contractor and potential negative FAPIIS report.

File details come from the government source that posted it. Updated .