Attachment 2 - EXCOMM Follow On CSP.pdf
PDF 286 KB Posted
- Attached to
- NAWCAD WOLF Exterior Communications (EXCOMM)
- Solicitation number
- N00421-18-R-0072
About this file
This document contains a contract surveillance plan and associated enclosures for the N00421-18-R-0072 contract opportunity. The contract surveillance plan outlines the quality assurance methods and responsibilities of government resources, including the Contracting Officer, Contracting Officer's Representative, and Government Project Leads, to oversee contract performance. It details surveillance methods such as inspection of contract data requirement list deliverables and annual performance assessments. The enclosures provide templates for documenting quarterly and annual surveillance activities covering quality, schedule, cost control, and other performance standards. Metrics such as delivery timeliness and rework percentages will be tracked. The associated federal contract opportunity notice seeks engineering and equipment installation services from concept through deployment for Command, Control, Communications, Computers, and Intelligence systems, including shipboard and transportable communications systems, as a follow-on to an existing Seaport-e task order. The requirement is for the Naval Air Warfare Center Aircraft Division with a small business size standard of $41.5 million and NAICS code 541330. Comments on the draft solicitation are requested by a specified date.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-18-R-0072
Source Selection Information 1 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Contract Surveillance Plan for
EXCOMM
1. Purpose
This Contract Surveillance Plan (CSP) document is developed and applied by the Government to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs in accordance with (IAW) the Statement of Work (SOW), and the Government receives the quality of services called for in each Task Order (TO) SOW.
The Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF)
Integrated C2 & Intel (IC2&I) Division integrates and delivers products for Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance, and Reconnaissance
(C5ISR) systems. As the organic Lead Systems Integrator (oLSI), IC2&I Division provides non-repetitive, rapid response solutions to close critical communication capability gaps for the U.S.
Military, National Agencies, and other Government Program Offices. The SOW scope includes engineering and equipment installation services from concept through deployment of Command, Control, Communications, Computers, Intelligence (C4I) systems including legacy, current, and next generation shipboard interior and Exterior Communications (EXCOMM); shipboard radios;
and transportable, airborne, and fixed shore termination communications systems, subsystems, and components.
This contract will have Cost Plus Fixed Fee (CPFF) term Contract Line Item Numbers (CLINs).
The Contract will have a five-year ordering period. A properly executed CSP will assist the
Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this CSP is provided under Contract Section E - Inspection and
Acceptance, which provides for inspections and acceptance of the services, products and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant
TOs.
The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.
Source Selection Information 2 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
4. Government Resources
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting
Officer (PCO)), or a person with the authority to administer contracts (Administrative
Contracting Officer (ACO)) and make related determinations and findings on behalf of the
Government. The PCO for this contract is Kristen Ferro. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates individual GPLs to assist in administering of specific efforts under the Contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this
CSP:
KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract and safeguards the interests of the
United States in the contractual relationship. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the Contract and assures proper
Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf.
Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
Source Selection Information 3 UNCLASSIFIED//FOR OFFICIAL USE ONLY
GPL: The GPL is responsible for assisting in administering of specific efforts under the
Contract. A GPL cannot, in any manner, alter the scope of the Contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for engineering and equipment installation services for Command, Control, Communications, Computers, and Intelligence (C4I) systems is very competitive. As such, the successful
Offeror has a vested interest in the Government-generated CPARS under this Contract.
Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one (1) determinant in the award of future TOs. The
Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback and review of Contract Data Requirements Lists
(CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.
b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the checklist provided herein.
7. Surveillance
Enclosure (2) sets forth the performance standards, incentives and surveillance methods for the
Contractor, the COR and GPLs while Enclosures (1) and (3) provides the checklist and means for the COR to document the results of the surveillance and will be the Surveillance Activity
Checklist (SAC).
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations and any actions related to the
Contractor’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR will forward these records to the KO at termination or completion of the Contract.
9. Enclosures
Enclosure (1): SAC
Enclosure (2): Quarterly Evaluation by CDRLs
Enclosure (3): Annual Surveillance Summary
Enclosure (1)
Source Selection Information 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (1): SAC
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of SB, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
QUARTERLY EVALUATION – BY SOW Paragraph
Description Surveillance
Method/Measure Dates
Quality
Assessment
Schedule
Assessment
Cost Control
Assessment
Business
Relations
Assessment
Management
Assessment
Utilization of SB
Assessment
Other
Areas
Assessment
Provide research, development, design, verification, and validation of new, production or in-service systems support IAW paragraph 3.3.1
100% Inspection by
COR/ACOR and/or GPLs
Provide verification, and validation support
IAW paragraph
3.3.2
Provide systems engineering, assimilation, and installation support
IAW paragraph
3.3.3
Provide integrated product support
Enclosure (1)
Source Selection Information 5 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance
Method/Measure Dates
Quality
Assessment
Schedule
Assessment
Cost Control
Assessment
Business
Relations
Assessment
Management
Assessment
Utilization of SB
Assessment
Other
Areas
Assessment
IAW paragraph
3.3.4
Provide material and equipment procurement and control support
IAW paragraph
3.3.5
Provide technical and project management support IAW paragraph 3.3.6
Enclosure (2)
Source Selection Information 6 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (2) QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LISTS
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
A001 – Contracting Officer’s
Management Report; Segregation of
Costs and Invoice Requirements
Report
100% Inspection by COR/ACOR and/or GPLs.
A002 – Contractor’s Progress and
Status Report; Financial Progress
Report
A003 – Contractor’s Progress and
Status Report; Contractor’s
Personnel Roster/Workforce Report
A004 – Report, Record of
Meeting/Minutes; Trip/Meeting
Report
A005 – Phase-Out Transition Plan
A006 Operations Security (OPSEC)
Plan
A007 – Technical Report –
Study/Services
A008 – Product Drawings/Models and Associated Lists
A009 – Systems/Subsystems
Specifications (SSS)
A010 – Standardized Material
Equipment (MEL)
A011 – Presentation Material
A012 – Test Procedure
A013 – Test Plan
Enclosure (2)
Source Selection Information 7 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
A014 – Technical Report –
Study/Services; Technical
Operations/Maintenance/ Training
Manuals and Materials
A015 – Technical Report –
Study/Services; After Action Report
A016 – Technical Report –
Study/Services; Project Plan/Report
A017 – Program Management Plan;
Project Requirements
A018 – Accident Incident Report
Metric Summary:
Current Period
Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Enclosure (3)
Source Selection Information 8 UNCLASSIFIED//FOR OFFICIAL USE ONLY
Annual Surveillance Summary
The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in
Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.
Description Surveillance Method/ Measure Date Planned Date Completed Summary Rating/Results
Quality of Product or Service Review of Quarterly Ratings
Schedule Review of Quarterly Ratings
Cost Control Review of Quarterly Ratings Business Relations Review of Quarterly Ratings Management Review of Quarterly Ratings Utilization of SB Review of Quarterly Ratings
Other Areas Review of Quarterly Ratings
Annual Surveillance Completed By: _______________________
Date Completed: ________________
All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.
Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes and assess the effectiveness of Contractor corrective actions.
Source Selection Information 9 UNCLASSIFIED//FOR OFFICIAL USE ONLY
Cost Control: Assess the Contractor’s effectiveness in forecasting, managing and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations: Assess the timelines, completeness and quality of problem identification; corrective action plans; proposal submittals; the Contractor’s reasonable and cooperative behavior; effective business relations; and customer satisfaction.
Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Utilization of SB: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB
(including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes
ANCs and Indian Tribes), Women Owned SBs (WOSBs), HUBZone, Veteran Owned SBs (VOSBs), Service Disabled Veteran
Owned SB (SDVOSB), and ANCs and Indian Tribes that are not Small Disadvantaged Businesses (SDBs) or SBs) to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the Contract required targets and the Contractor’s submitted SB plan.
Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Source Selection Information 10 UNCLASSIFIED//FOR OFFICIAL USE ONLY
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
File details come from the government source that posted it. Updated .