Attachment 2 Drawings Iroquois Septic Rehab.pdf

PDF 952 KB Posted

Attached to
Iroquois NWR REHABILITATE SEPTIC SYSTEM
Solicitation number
140F0521R0006
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

000000_COVER

000110_TableofContents
017300 b - execution
220517 a - sleeves and sleeve seals for plumbing piping
220518 b - escutcheons for plumbing piping
220523.12 a - ball valves for plumbing piping
220529 b - hangers and supports for plumbing piping and equipment
220553 b - identification for plumbing piping and equipment
221313 b - facility sanitary sewers_UPDATED_Oct-2017
221316 b - sanitary waste and vent piping_updated_q1-2012
221319 b - sanitary waste piping specialties
221329 a - sanitary sewerage pumps
221343 b -rehabiliation-of-existing-sewage-pumping-station
312000 b - earth moving
Iroquois NWR, Wastewater system upgrades, introduction 1 .pdf
Iroquois National Wildlife Refuge, New York
Rehabilitate Septic Wastewater System
Technical Specifications
1.0 Introduction and Overview
1.1 Scope of Work
1.2 Objectives
1.3 Period of Performance
1.5 Refuge Operations
A. Coordinate all on site activities with the Refuge Manager. Notify the Refuge Manager when construction activities are to take place. Consult with the Refuge Manager on all on site activities that will take place, to ensure that Refuge operations ar...
1.6 End Results/Deliverables
Iroq septic QUOTE SCHEDULE.pdf
Rehabilitate Septic Wastewater System
Iroquois NWR, New York

File details come from the government source that posted it. Updated .