Attachment 2 Drawings Iroquois Septic Rehab.pdf
PDF 952 KB Posted
- Attached to
- Iroquois NWR REHABILITATE SEPTIC SYSTEM
- Solicitation number
- 140F0521R0006
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
000000_COVER
| 000110_TableofContents |
| 017300 b - execution |
| 220517 a - sleeves and sleeve seals for plumbing piping |
| 220518 b - escutcheons for plumbing piping |
| 220523.12 a - ball valves for plumbing piping |
| 220529 b - hangers and supports for plumbing piping and equipment |
| 220553 b - identification for plumbing piping and equipment |
| 221313 b - facility sanitary sewers_UPDATED_Oct-2017 |
| 221316 b - sanitary waste and vent piping_updated_q1-2012 |
| 221319 b - sanitary waste piping specialties |
| 221329 a - sanitary sewerage pumps |
| 221343 b -rehabiliation-of-existing-sewage-pumping-station |
| 312000 b - earth moving |
| Iroquois NWR, Wastewater system upgrades, introduction 1 .pdf |
| Iroquois National Wildlife Refuge, New York |
| Rehabilitate Septic Wastewater System |
| Technical Specifications |
| 1.0 Introduction and Overview |
| 1.1 Scope of Work |
| 1.2 Objectives |
| 1.3 Period of Performance |
| 1.5 Refuge Operations |
| A. Coordinate all on site activities with the Refuge Manager. Notify the Refuge Manager when construction activities are to take place. Consult with the Refuge Manager on all on site activities that will take place, to ensure that Refuge operations ar... |
| 1.6 End Results/Deliverables |
| Iroq septic QUOTE SCHEDULE.pdf |
| Rehabilitate Septic Wastewater System |
| Iroquois NWR, New York |