Attachment 2 - Drawings Boiler and Water Heaters.pdf

PDF 4 MB Posted

Attached to
4520--CON NRM 687-24-110 Replace B143 Boiler and Water Heaters
Solicitation number
36C26024R0096
Issued by

About this file

This document contains mechanical, plumbing, and fire protection drawings for a federal contract opportunity to replace boilers and water heaters at the Jonathan M. Wainwright VA Medical Center in Walla Walla, Washington. The drawings show the existing and proposed mechanical, plumbing, and fire protection systems, including schedules for equipment like boilers, pumps, water heaters, and cooling towers. The key details are:

The contract opportunity is to replace two domestic water heaters (OPC-WH-1 and OPC-WH-2) and one boiler (OPC-B-1) at the medical center. The drawings show the locations and specifications for the new replacement equipment. Related piping and system diagrams are also included. The federal agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20. The solicitation number is 36C26024R0096.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

R

EF

R

EF

REF.

R

EF

FD

FD

FD

FD

FD

DH

DH

DH

DH

FA

AP

FA

AP

FA

CP NA

C

F

F

F

F

F

F

F

F

F

FF

F WF WF

WFTS

TSTSTSTS

AMP

DHDH

AR

AR

AR

UP

G

F

E

D

C

B

6 8 9 10 11 12 137

ELEVATOR

EQUIPMENT

1103A

NORTH STAIR

ELEVATOR P3

1199P

ELEVATOR P1

1199D

ROI CLERK

TRAVEL CLERK

INTERVIEW

INTERVIEW

INTERVIEW

CENTRAL CHECK-IN

AGENT CASH

OFFICE

1201 STORAGE

NURSE CLINIC

TELE RETINAL

FOOT CLINIC

1220ANTE COAG EXAM

ST TLT

SWITCHBOARD

OPERATOR

MAS STOR

RESOURCE/ INFO

CENTER

EMPLOY NURSE

CLINIC MGR

CLEAN STOR

1228A

EXAM

TELE EXAM

ISOL EXAM

TELE EXAM

PAT TLT

1217A

HAC

ST TLT

MAS SUPER.

OFFICE

ANTE-COAG

OFFICE

ANTE-COAG

OFFICE

SOC WRK. OFFICE

BEHAV. HEALTH

TECH & EDUC.

SOC WRK. OFFICE

1282 SOC WRK. OFFICE

SOC WRK. OFFICE

EXAM

EXAM

PAT TLT

PAT TLT

TELE EXAM

1223 EXAM

CLINIC RECEPT/

CLERKS

MEDS

CLEAN UTILITY

SOIL UTILITY

EXAM

EXAM

PHARM D

PHARM D

OFFICE

1276 PROV OFFICE

PROV OFFICE

1272 PROV OFFICE

PROV OFFICE

1268 PROV OFFICE

PROV OFFICE

CONFERENCE

EXAM

EXAM

PAT TLT

EXAM

EXAM

CLEAN STOR

1239A

EXAM

FAM WAIT

FAM TLT

1254A

MULTI-PURPOSE

PROCEDURE

1251 WOMEN'S EXAM

GYN PROCEDURE

WOMEN'S EXAM

PAT TLT

1253A ST TLT

TELE TRIAGE

OFFICE

EXAM/ OFFICE

EXAM/ OFFICE

NUT/ PAT ED CLASS

DIET

DIET

SECURITY

COMM

ELEC

SECURE DISPENS

COUNSEL OFFICE

COUNSEL OFFICE

PUBLIC TLT

PUBLIC TLT

PURCHASING

TELEHEALTH

ST TLT

ASSIST CHIEF

CHIEF

1308 CHIEF MED TECH

SECRETARY

BREAK DOWN

ANTE

CLEAN (ISO 7)

1311A

SUPERV

BULK STOR

ELEVATOR EQUIP

FILE ROOM

1509A

TECH WORKROOM

HOLTER

PULMONARY

TESTING

ST TLT

SLEEP ROOM

TLT/ SHWR

1501A

TLT/SHWR

1503A

SLEEP ROOM

CONTROL

1506SLEEP ROOM

TLT/ SHWR

1505A TLT/ SHWR

1507A

SLEEP ROOM

DME

1506A

BIO SAFETY

1412A

MICRO- BIOLOGY

STER SOL PREP

ADPAC

PATH OFFICE

STAFF CONF/

BREAK

WCHAIR/

STRETCHER

STORAGE

HEALTH TECHS

HEALTH TECHS

NURSE WORKAREA

1299K

NURSE WORKAREA

1299L

NURSE WORKAREA

1299M

GAS STOR

PRESC. RECEIV.

OFFICE

1313C

DISP OFFICE

1313D

SECRETARY

FILL & ASSEMBLY

INVENTORY

CONTROL

1313A

ACTIVE & REFRIG

STORAGE

1313B

MAIL OUT OFFICE

1313E

WAITING

1399A

SCALE

WAITING

1299R

WAITING

1299Q

WAITING

1299P

WAITING

1299N

WAITING

1499CBLOOD DRAW

BLOOD DRAW

SPEC TLT

SPEC PROCESS

CHEMISTRY/

HEMATOLOGY

PUBLIC CANTEEN

VENDING

1101B

ELEVATOR P2

1199E

SCALE

RECEPTION

WCHAIR STOR

PAT TLT

URINALYSIS

HALLWAY

1399B

HALLWAY

1299A

COFFEE SHOP

1101A

COMM

ELECTRICAL

MAIN LOBBY

1199B

C & P CLERK

C & P EXAM

C & P EXAM

DEPLOY HEALTH

DEPLOY HEALTH

1527 CONFERENCE

VESTIBULE

1199A

SOUTH STAIR

ACCESSORY OCCUPANCY 887 S.F.

(ALLOWABLE AREA = 3,883 SF)

149 FT

125 FT

F

T

2 F

T

F

T

F

T

HALLWAY

1299H

HALLWAY

1599C

HALLWAY

1499B

HALLWAY

1599A

HALLWAY

1299D

CORRIDOR

1199F

CORRIDOR

1199G

HALLWAY

CORRIDOR

1199D

HALLWAY

1499A

WOMEN'S TOILET

WCHAIR SCALE

HAC

VESTIBULE

1199N

LOCKERS

1601AHAC

HALLWAY

1299G

HALLWAY

1299B

HALLWAY

1299C

HALLWAY

1299E

HALLWAY

1299F

HALLWAY

1299J

CORRIDOR

1199E

HALLWAY

1599B

HALLWAY

1399C

HALLWAY

1399D

OUTDOOR PATIO

1101C

HALLWAY

1599D

A

SEE SHEET AE1.1

SEE SHEET AE1.1.1 SEE SHEET AE1.1.1

SEE SHEET AE1.1

1 HOUR SMOKE RATED PARTITION

AT CURTAIN WALL

1 HOUR SMOKE RATED

PARTITION AT CURTAIN WALL

D.7

D.3

0A6

FEC

FEC

FEC

FEC

FEC

G.1

179 FT

POINT OF EXIT

COMMON PATH EXIT

TRAVEL

FIRE EXTINGUISHER &

BRACKET, SURFACE-

MOUNTED

FIRE EXTINGUISHER

CABINET, RECESSED OR

SURFACE MOUNTED

FLOURESCENT LIGHTING

FIXTURE - EMERGENCY / NIGHT

LIGHT BRANCH

CPET

FEC

FEC

TRAVEL DISTANCEX'-X"

EXIT OCCUPANCY

# PEOPLE ACTUALLY USING EXIT

# PEOPLE ALLOWED

XXX

XXX

FIRE ALARM SYSTEM CONTROL

PANEL (FLUSH/SURFACE)

FACP

LIFE SAFETY LEGEND

SYMBOL LEGEND

RECESSED DOWN LIGHT

STROBE - CEILING MOUNTED

HORN W/ STROBE

FA SPEAKER W/ STROBE

SMOKE DETECTOR - CEILING OR

SURFACE MOUNTED

FA SPEAKER

SP SPEAKER - CEILING MTD

M MICROPHONE OUTLET

PH PHOTO CELL

DT

PASSIVE INFRARED/ULTRASONIC

OCCUPANCY SENSOR

(WALL/CEILING)

DT

PI PI

PASSIVE INFRARED OCCUPANCY

SENSOR (WALL/CEILING)

EXIT LIGHT - WALL/CEILING MOUNTED

- DIRECTIONAL ARROWS AS

INDICATED SHADING INDICATES

ILLUMINATED FACE

TELECOMMUNICATIONS

COMBINATION VOICE/DATA OUTLET,

FLOOR MTD SERVICE FITTING,

SURFACE TYPE ("F" DENOTES FLUSH

TYPE, "P" DENOTES POKE THRU

TYPE)

TELECOMMUNICATIONS

COMBINATION VOICE/DATA OUTLET,

CEILING MTD SERVICE FITTING,

SURFACE TYPE ("F" DENOTES FLUSH

TYPE)

1 HOUR FIRE BARRIER

SMOKE BARRIER

SEE TAG FOR TYPE

Pl ot

Da te:

th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

FULLY SPRINKLERED

SMITHGROUP, INC.

500 Griswold Suite 1700 Detroit, MI 48226 T 313.983.3600 F 313.983.3636 www.smithgroup.com

CIVIL ENGINEER:

J-U-B ENGINEERS, Inc.

2810 West Clearwater Ave, Suite 201 Kennewick, WA 99336 T 509.783.2144 F 509.736.0790

DOOR HARDWARE:

Jenosky Consultanting, Inc.

Architectural Hardware Specifications 43422 West Oaks Drive #270 Novi, MI 48377-3300 T 248.496.7900

RADIATION SHEILDING DESIGN:

Diagnostic Physics, Inc.

P.O. Box 49587 Charlotte, NC 28277 T 704.541.9628 F 704.541.2843

SIGNAGE:

Inkspotdesign, Inc

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

T 248.960.115

320 W. Ohio Street, Suite 4W Chicago, IL 60654 T 312.337.9600 F 312.337.9876

DESIGN/BUILDER:

TRUE NORTH PROJECT NORTH

LEVEL II DESIGN:

HDR Architecture, Inc.

440 S. Church Street, Suite 1000 Charlotte, NC 28202 Phone: (704) 338-6700

97 8654321

7/2 6/2

1 1

:18 :09

P M

27JUL11

WALLA WALLA, WASHINGTON

AE1.1

LEVEL 1 LIFE SAFETY PLAN - AREA A1,

A2, A3, A4

PT JF

JONATHAN M. WAINWRIGHT VA

MEDICAL CENTER – MULTI-SPECIALTY

OUTPATIENT CLINIC

687-400

SCALE: 1/8" = 1'-0" REF. A6 ON AE2.61 LEVEL 1 LIFE SAFETY PLAN

Revision 1 Date 1

95% INTERIORS SUBMITTAL 15JUL11

ISSUED FOR CONSTRUCTION - ENCLOSURE PACKAGE 27JUL11

Government furnished drawings are for reference only

Mechanical Room locatiMECHANICALon (First Floor)

Access Door

VHAWWWStyneB Line

REMARKS

DUPLEX SYSTEM BASED ON BEACON MEDAES120

TYPELOCATION

VACUUM PUMP SCHEDULE

SERVICETAG

2 460/3-2 -819ROTARY VANEMEDICAL VACUUMOPC-MVP-1

MECHANICAL ROOM

VACUUM

TANK

CAPACITY

GALLONS

VOLT/

PHASE

MIN.

BHP

EACH

PUMP

MAX.

BHP

EACH

PUMP

MAX.

PUMP

RPM

No.

PUMPS

OPERATING

VACUUM

PRESSURE IN.

HG.

SCFM

EACH

PUMP

OPC-HW-2 DOM. WATER HEAT MECH. R.M. CONDENSING STORAGE 560125 4025 400,000120 4 1.2" W.C.3/4" 250 560120 V, 1PH 80 PVI MODDEL 560 N 125 A-PV, SINGLE POINT CONNECTION, 15 A, 120 V, 1PH

RECOVERY

PVI MODEL 560 N 125A-PV, SINGLE POINT CONNECTION, 15 A, 120 V, 1PH

∆T

°FGPM

120 V, 1PH 560

HEATING INPUT

WATTS

GAS INPUT

NPT

NATURAL GAS

3/4"

MIN INLET

GAS FLOW

4 1/2" W.C.

VOLT/

PHASE

ELECTRIC REMARKS

WATER

INPUT

BTU/H

LWT

°F 120 400,000

EWT

°FGPH

MINIMUM

STORAGE

CAPACITY

GALLONS

MINIMUM

HEATING

SURFACE

SQ. FT.

125 560CONDENSING STORAGEMECH. R.M.DOM. WATER HEAT

SERVICE LOCATION TYPE

OPC-HW-1

TAG

DOMESTIC WATER HEATER SCHEDULE

CAPACITY/SALT DOSAGE

SALT

DOSAGE

INCOMING

WATER

HARDNESS

PPM

ION EXCHANGE SKID PACKAGE SYSTEM1ST FLOOR MECHANICAL ROOMDOMESTIC HOT WATER

SERVICE LOCATION TYPE

OPC-WS1

TAG

WATER SOFTENER SCHEDULE

CONTINUOUS

FLOW RATE

GPM [L/s]

PEAK FLOW RATE

GPM [L/s]

INLET PRESSURE

PSIG KPA

BACK WASH

FLOW RATE

GPM L/s

KGR @

SALT

DOSAGE

MIN. BED

(SUBFILL OF SAND)

KGr/LB

MAX. BED

KGr/LB

TANK SIZE

(DIA.)

IN mm

SALT

CAPACITY OF

BRINE TANK

LB KG

POWER REQUIRED

AMP PHASE VOLT

REMARKS

150/50

BASED ON CULLIGAN CSM DUPLEX MODEL CSM 150-2

40 80

Pl ot

Da te:

th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

FULLY SPRINKLERED

SMITHGROUP, INC.

500 Griswold Suite 1700 Detroit, MI 48226 T 313.983.3600 F 313.983.3636 www.smithgroup.com

CIVIL ENGINEER:

J-U-B ENGINEERS, Inc.

2810 West Clearwater Ave, Suite 201 Kennewick, WA 99336 T 509.783.2144 F 509.736.0790

DOOR HARDWARE:

Jenosky Consultanting, Inc.

Architectural Hardware Specifications 43422 West Oaks Drive #270 Novi, MI 48377-3300 T 248.496.7900

RADIATION SHEILDING DESIGN:

Diagnostic Physics, Inc.

P.O. Box 49587 Charlotte, NC 28277 T 704.541.9628 F 704.541.2843

SIGNAGE:

Inkspotdesign, Inc

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

T 248.960.115

320 W. Ohio Street, Suite 4W Chicago, IL 60654 T 312.337.9600 F 312.337.9876

DESIGN/BUILDER:

TRUE NORTH PROJECT NORTH

LEVEL II DESIGN:

HDR Architecture, Inc.

440 S. Church Street, Suite 1000 Charlotte, NC 28202 Phone: (704) 338-6700

97 8654321

9/5 /20

:10 :46

A M

05AUG13

WALLA WALLA, WASHINGTON

PL7.0

PLUMBING SCHEDULES

RWH MT 211 286

JONATHAN M. WAINWRIGHT VA

MEDICAL CENTER – MULTI-SPECIALTY

OUTPATIENT CLINIC 142

687-400

PLUMBING FIXTURE SCHEDULE

TAG DESCRIPTION

WASTE

PIPE

VENT

PIPE

COLD

WATER

HOT

WATER

WASTE

FIXTURE

UNITS

WATER

FIXTURE

UNITS

WRIST

BLADE

HANDLES

ELECTRIC

SENSOR MANUFACTURER MODEL

FAUCET

MANUFACTURER

FAUCET

MODEL REMARKS

FD-C FLOOR DRAIN 2" OR 3" 3

FD-H FLOOR DRAIN 4" 3

FD-L RIM FLUSHING 3" 3

FD-M FLOOR DRAIN 3" 3

P-101 WATER CLOSET 4" 2" 1" - 4 10 BARIATRIC, FLOOR MOUNT, DUAL FLUSH

P-103 WATER CLOSET 4" 2" 1" - 4 10 WALL MOUNT, DUAL FLUSH

P-202 URINAL 2" 1 1/2" 1/2" - 2 5 ULTRA LOW FLOW

P-418 LAVATORY 1 1/2" 1 1/2" 1/2" 1/2" 2 2 WALL MOUNT, CHINA, SENSOR, GOOSNECK

P-502 SERVICE SINK 3" 2" 3/4" 3/4" 3 4 CORNER, STAIN RESISTANT TERRAZZO

P-520 SINK 1 1/2" 1 1/2" 1/2" 1/2" 2 4 SCRUB, SENSOR CONTROL

P-524 SINK 1 1/2" 1 1/2" 1/2" 1/2" 2 4 DOUBLE COMP. KITCHEN SINK W/ DISPOSER

P-525 SINK 1 1/2" 1 1/2" 1/2" 1/2" 2 4 STAINLESS STEEL, OVAL, UNDER MOUNT, SEONSOR P-528 SINK 1 1/2" 1 1/2" 1/2" 1/2" 2 4 SINGLE COMP. SINGLE LEVER KITCHEN SINK W/ DISPOSER

P-529 SINK 1 1/2" 1 1/2" 1/2" 1/2" 2 4 STAINLESS STEEL DROP-IN, SENSOR FAUCET

P-531 SINK 1 1/2" 1 1/2" 1/2" 1/2" 2 4 STAINLESS STEEL DROP-IN, SENSOR FAUCET

P-609 ELECTRIC WATER COOLER 2" 1 1/2" 1/2" - 3 4 REFRIGERATION SYSTEM, DUAL HEIGHT

P-701 SHOWER 2" 1 1/2" 1/2" 1/2" 2 2 W/ T/P COMBINATION VALVE

P-707 EMERGENCY SHOWER 2" 1 1/2" 1" 1" 0 10 FREE STANDING, W/ EYE AND FACE WASH

P-801 WALL HYDRANT - - 3/4" - 0 5 NON-FREEZE, W/ VACUUM BREAKER

P-804 HOSE BIBB - - 3/4" - 0 5 WALL MOUNT, W/ VACUUM BREAKER

PLUMBING PUMP SCHEDULE

TAG SYSTEM LOCATION TYPE FLUID TEMPERATURE CAPACITY

TOTAL

HEAD

MINIMUM

NPSH

MINIMUM

EFFICIENCY (%)

PIPE CONNECTIONS MOTOR DATA

OPERATING WEIGHT MANUFACTURER MODEL REMARKSSUCTION DISCHARGE HORSEPOWER RPM VOLTAGE PHASE

OPC-PP-1 DOMESTIC HOT WATER RECIRCULATION MECHANICAL INLINE WATER 110 25 15.00 1 1/4" 1 1/4" 0.15 3450 115 V 1 Bell & Gossett PL-30 OPC-SP1 ELEVATOR PIT ELEVATOR P3 SIMPLEX WATER 40 100 30.00 2" 2" 1.50 1750 460 V 3 WEIL 1413 OPC-SP2 ELEVATOR PIT ELEVATOR P2 SIMPLEX WATER 40 50 30.00 2" 2" 1.00 1750 460 V 3 WEIL 1413

PLUMBING EXPANSION TANK SCHEDULE

TAG SYSTEM LOCATION

MAXIMUM

TEMP

TANK

VOLUME

MINIMUM

ACCEPTANCE

VOLUME

SIZE DATA

OPERATING

PRESSURE

OPERATING

WEIGHT MANUFACTURER MODEL REMARKSDIAMETER LENGTH

CONNECTION

SIZE

OPC-ET-3 DOMESTIC WATER MECHANICAL 240 °F 11.0 gal 5.0 gal 1' - 2" 2' - 3" 1" 125.00 psi 0.20 kip COOK 135 ACEB

RECORD DRAWINGS 05AUG13

Replace two domestic water heaters (OPC-HW-1 and OPC-HW-2)

Lochinvar Shield Model SNA400-125

Government furnished drawings are for reference only

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

Pl ot

Da te:

th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

TRUE NORTH PROJECT NORTH

97 8654321

3/2 8/2

2 1

0:3 4:0

8 A M

16NOV23

WALLA WALLA, WASHINGTON

M7.1

MECHANICAL SCHEDULES

RWH MT 1 5

Project Title

JONATHAN M. WAINWRIGHT VA

MEDICAL CENTER – BOILER

REPLACEMENT 143

687-24-110

EXPANSION TANK SCHEDULE

TAG SYSTEM LOCATION

MAXIMUM

TEMP

TANK

VOLUME

MINIMUM

ACCEPTANCE

VOLUME

SIZE DATA

OPERATING

PRESSURE

OPERATING

WEIGHT MANUFACTURER MODEL REMARKSDIAMETER LENGTH

CONNECTION

SIZE

OPC-ET-1 CHW MECHANICAL 240 °F 11.0 gal 5.0 gal 1' - 2" 2' - 3" 1" 125.00 psi 0.20 kip COOK 135 ACEB OPC-ET-2 HHW MECHANICAL 240 °F 79.0 gal 43.0 gal 1' - 8" 4' - 7" 1" 125.00 psi 1.00 kip TACO CBX300

STEAM HUMIDIFIER SCHEDULE

TAG SYSTEM LOCATION TYPE

DESIGN

AIR FLOW

(CFM)

FUEL

TYPE

VENT

TYPE

STEAM DATA ELECTRICAL DATA

OPERATING

WEIGHT MANUFACTURER

MODEL

# REMARKS

FLOW

(LBS/HR)

PRESSURE

(PSIG)

INPUT

POWER VOLTAGE PHASE

NUMBER

OF UNITS

OPC-SH1 AHU-1 MECHANICAL STEAM 40000 ELEC NA 300 0.7 102 kW 460 V 3 1 0.32 kip PURE ES-102 OPC-SH2 AHU-1 MECHANICAL STEAM 40000 ELEC NA 150 0.7 50 kW 460 V 3 1 0.25 kip PURE ES-49.5 OPC-SH3 AHU-2 MECHANICAL STEAM 35000 ELEC NA 300 0.7 102 kW 460 V 3 1 0.32 kip PURE ES-102

PUMP SCHEDULE

TAG SYSTEM LOCATION TYPE FLUID TEMPERATURE CAPACITY

TOTAL

HEAD

MINIMUM

NPSH

MINIMUM

EFFICIENCY (%)

PIPE CONNECTIONS MOTOR DATA

HP1

MOTOR DATA

OPERATING WEIGHT MANUFACTURER MODEL REMARKSSUCTION DISCHARGE HORSEPOWER RPM VOLTAGE PHASE

OPC-CHP-1 CHWS MECHANICAL END SUCTION WATER 57 °F 530.0 GPM 32.00 psi 7' - 0" 80 5" 4" 15000 W 20 1750 460 V 3 0.50 kip Bell & Gossett 4 BC OPC-CHP-2 CHWS MECHANICAL END SUCTION WATER 57 °F 530.0 GPM 32.00 psi 7' - 0" 80 5" 4" 15000 W 20 1750 460 V 3 0.50 kip Bell & Gossett 4 BC OPC-CWP-1 CWS MECHANICAL END SUCTION WATER 95 °F 780.0 GPM 33.00 psi 11' - 0" 79 6" 5" 18750 W 25 1750 460 V 3 0.70 kip Bell & Gossett 5 BC OPC-CWP-2 CWS MECHANICAL END SUCTION WATER 95 °F 780.0 GPM 33.00 psi 11' - 0" 79 6" 5" 18750 W 25 1750 460 V 3 0.70 kip Bell & Gossett 5 BC OPC-HWP-1 MECHANICAL WATER 130 °F 405.0 GPM 26.00 psi 2' - 7 3/16" 79 5" 4" 7350 W 10 1150 460 V 0.00 kip Bell & Gossett 4 GB OPC-HWP-2 MECHANICAL WATER 130 °F 405.0 GPM 26.00 psi 2' - 7 3/16" 79 5" 4" 7350 W 10 1150 460 V 0.00 kip Bell & Gossett 4 GB OPC-HWP-3 AHU-1 MECHANICAL INLINE WATER 130 °F 39.0 GPM 11.00 psi 3' - 10" 54 1 1/2" 1 1/2" 565 W 0.75 1150 460 V 3 0.00 kip Bell & Gossett 80-1-1/2X1-1/2X9-1/2 OPC-HWP-4 AHU-2 MECHANICAL INLINE WATER 130 °F 33.0 GPM 11.00 psi 3' - 8" 53 1 1/2" 1 1/2" 565 W 0.75 1150 460 V 3 0.00 kip Bell & Gossett 80-1-1/2X1-1/2X9-1/2

CHILLER SCHEDULE (ELECTRIC WATER-COOLED)

TAG LOCATION TYPE REFRIGERANT

NOMINAL

CAPACITY

TONS

EVAPORATOR SIDE DATA CONDENSER SIDE DATA ELECTRICAL DATA

OPERATING

WEIGHT MANUFACTURER MODEL REMARKS

EVAP

EWT

EVAP

LWT

EVAP

FLOW

EVAP

PASSES

SCALE

FACTOR

EVAP

MAX PD

COND

EWT

COND

LWT

COND

FLOW

COND

PASSES

COND

MAX PD

MAX KW

AT

DESIGN

COMPRESSOR

FLA

COMPRESSOR

LRA VOLTAGE PHASE MCA MOCP

STARTER

TYPE

OPC-CH-1 MECHANICAL ELECTRIC-WATER COOLED 410A 53 45 °F 57 °F 106.0 GPM 1 0 6.36 psi 85 °F 95 °F 154.0 GPM 1 9.00 psi 39 W N/A N/A 460 V 3 62 67 2.00 kip MULTISTACK MS50X6_W MODULAR CHILLER EVAPORATOR SHALL BE CAPABLE OF VARIABLE FLOW OPC-CH-2 MECHANICAL ELECTRIC-WATER COOLED 410A 53 45 °F 57 °F 106.0 GPM 1 0 6.36 psi 85 °F 95 °F 154.0 GPM 1 9.00 psi 39 W N/A N/A 460 V 3 62 67 2.00 kip MULTISTACK MS50X6_W MODULAR CHILLER EVAPORATOR SHALL BE CAPABLE OF VARIABLE FLOW OPC-CH-3 MECHANICAL ELECTRIC-WATER COOLED 410A 53 45 °F 57 °F 106.0 GPM 1 0 6.36 psi 85 °F 95 °F 154.0 GPM 1 9.00 psi 39 W N/A N/A 460 V 3 62 67 2.00 kip MULTISTACK MS50X6_W MODULAR CHILLER EVAPORATOR SHALL BE CAPABLE OF VARIABLE FLOW OPC-CH-4 MECHANICAL ELECTRIC-WATER COOLED 410A 53 45 °F 57 °F 106.0 GPM 1 0 6.36 psi 85 °F 95 °F 154.0 GPM 1 9.00 psi 39 W N/A N/A 460 V 3 62 67 2.00 kip MULTISTACK MS50X6_W MODULAR CHILLER EVAPORATOR SHALL BE CAPABLE OF VARIABLE FLOW OPC-CH-5 MECHANICAL ELECTRIC-WATER COOLED 410A 53 45 °F 57 °F 106.0 GPM 1 0 6.36 psi 85 °F 95 °F 154.0 GPM 1 9.00 psi 39 W N/A N/A 460 V 3 62 67 2.00 kip MULTISTACK MS50X6_W MODULAR CHILLER EVAPORATOR SHALL BE CAPABLE OF VARIABLE FLOW OPC-CH-6 MECHANICAL ELECTRIC-WATER COOLED 410A 53 45 °F 57 °F 106.0 GPM 1 0 6.36 psi 85 °F 95 °F 154.0 GPM 1 9.00 psi 39 W N/A N/A 460 V 3 62 67 2.00 kip MULTISTACK MS50X6_W MODULAR CHILLER EVAPORATOR SHALL BE CAPABLE OF VARIABLE FLOW

COOLING TOWER SCHEDULE

TAG SYSTEM LOCATION

CELL DATA DESIGN DATA FAN MOTOR DATA SUMP HEATER

OPERATING

WEIGHT MANUFACTURER MODEL REMARKSQUANTITY

NOMINAL

TONS EACH

EAT WB

F

FLOW

PER

CELL EWT F LWT F

NUMBER

OF FANS HORSEPOWER RPM VOLTAGE PHASE

TYPE OF

CONTROL KW VOLTAGE PHASE

OPC-CT-1 CHW GRADE 1 163 78 °F 390.0 GPM 95 °F 85 °F 1 7.5 0 460 V 3 VFD 8 kW 460 V 3 7.90 kip BAC 1500 OPC-CT-2 CHW GRADE 1 163 78 °F 390.0 GPM 95 °F 85 °F 1 7.5 0 460 V 3 VFD 8 kW 460 V 3 7.90 kip BAC 1500 OPC-CT-3 CHW GRADE 1 163 78 °F 390.0 GPM 95 °F 85 °F 1 7.5 0 460 V 3 VFD 8 kW 460 V 3 7.90 kip BAC 1500

BOILER SCHEDULE (HOT WATER)

TAG SYSTEM LOCATION TYPE

NET OUTPUT

CAPACITY MBH

FIRING

RATE PRESSURE

ELECTRICAL

DATA

VENT

STACK

OPERATING

WEIGHT MANUFACTURER MODEL REMARKS

DESIGN

FLOW EWT LWT MAXIMUM OPERATING

NATURAL

GAS (CFH)

OPERATING

PRESSURE MAX. VOLTAGE PHASE

OPC-B-1 HHWS MECHANICAL CONDENSING BOILER 168.0 GPM 110 °F 130 °F 1800 1688 0 28.00 psi 150 psi 120 V 1 6" 2.19 kip Riverside Hydronics, LLC 56 WBX 250A-IFC OPC-B-2 HHWS MECHANICAL CONDENSING BOILER 168.0 GPM 110 °F 130 °F 1800 1688 0 28.00 psi 150 psi 120 V 1 6" 2.19 kip Riverside Hydronics, LLC 56 WBX 250A-IFC OPC-B-3 HHWS MECHANICAL CONDENSING BOILER 168.0 GPM 110 °F 130 °F 1800 1688 0 28.00 psi 150 psi 120 V 1 6" 2.19 kip Riverside Hydronics, LLC 56 WBX 250A-IFC

COOLING TOWER SUMP SWEEPER

TAG SERVICE LOCATION

FLUID

DESIGN

FLOW SEPARATOR

SOLID

RECOVERY

SIZE MOTOR DATA

MANUFACTURER REMARKSTYPE TEMPERATURE INLET DISCHARGE

HORSE

POWER VOLTAGE PHASE

OPC-SW-1 CW MECH RM WATER 95 °F 240 GPM WITH AUTO PURGE 3" 3" 7.5 hp 460 V 3

CWB TANK SCHEDULE

TAG SYSTEM LOCATION TYPE

TANK

VOLUME

SIZE DATA

MAX.

PRESSURE

OPERATING

WEIGHT MANUFACTURER MODEL REMARKSDIAMETER LENGTH

CONNECTION

SIZE

OPC-CWB-1 CHW MECHANICAL CHW Buffer

Tank

850.0 gal 5' - 4" 10' - 0" 1" 125 PSI 9.10 kip CEMLINE V850CWB-F15-SL-15-I

Government funished drawings are for reference only

Replace Boiler #1

(OPC-B-1)

Lochinvar Crest Condensing Boiler model FBN2000

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

VHAWWWStyneB Line

UP

R

EF

REF.

9 10 11 12 13

D

E

F

G

P-502

P-529

P-418 P-529

P-524

P-529

P-418

P-103

P-103

P-103P-418

P-418

P-701

P-701

P-103

P-103

P-418

P-418

P-701

P-701

P-707

FD-C

FD-C

FD-C

FD-H

FD-H

FD-H

P-418

P-103

P-529

P-529

M4.3

DHWR

DCW

3/4"

1 1/2"

BV

3/4"

1 1/2"

3/4"

V D

H W

1 1/2"

3/4"

3/4"

DCW

V

DHW

DHWR

DHW

DCW

D H

W R

D H

W

3/4"

V

1 1/2"

1 1/2" 2"

3/4"

1 1/2" 2"

3/4" 1 1/2"

3"

3/4" 1 1/2" 2"

3/4"

3/4"

3" V

3/4"

3/4" 1 1/2" 2"

3/4" 3/4"

D C

W D

H W

CO

DHW

3/4"

3/4"

4"

DHW

S

AN

SAN

3/4"

2"

4"

4"

3/4"

1 1/2"

3/4"

2"

1 1/2"

DHW

DCW

D H

W R

D H

W

4" ST (OF)

(TERMINATE W/

DOWNSPOUT

NOZZLE W/

BIRDSCREEN 12"

A.F.F.)

4" ST DN

(5,075 SQ. FT.)

4" ST (OF)

(TERMINATE W/ DOWNSPOUT

NOZZLE W/ BIRDSCREEN 12" A.F.F.)

4" SAN DN

4" ST UP & DN

(6,819 SQ. FT.)

ST6

ST

OFD

OFD

SAN

3" SAN DN

SAN

DHWR

DCW

DHW

V

.1

1403.1

1405.1

1506.2

1505.1

1503.1

1504.1

1506.1

1501.1

.1

1408.1

B.

A.

C.

B.

1421.11424.1

.1

C.

.1

.1

1524.1

.1

.1

1528.1

.1

.1

D.

1520.1

1522.1

1511.1

1508.1

B.

G.

.1

C.

A.

A.

A.

1509A.1

1299N.11299N.2

1401.2

1410.1

1412.1

1701.1

A.

1507.1

A.

.1

CO

CO

4" SAN DN

SAN

FS

.2

1255.1

CORRIDOR

1199G

2" SAN UP

CO

4" SAN UP

2" SAN UP

CO

CO

4"

2" V DN

4" SAN UP

4" SAN DN

1 1/2"

DCW P-801

D C

W

P-801

3/4"

DCW

D H

W

DCW

4" ST (OF) UP

(6,819 SQ. FT.)6

OFD

D C

W D

H W

CO

4"

4" SAN UP

3" SAN UP

3" SAN UP

4"

4"

3"

2" SAN UP

3"

4"

2" SAN UP

2" SAN UP

2" SAN UP

P-418

SCW

W

DHWR

D C

W

D C

W D

H W

D C

W D

H W

OPC-WS1

D C

WINSTALL MIXING

VALVE ON WALL

DCW

2" MAKE UP NPW W/

RPZ TO HVAC

RPBP

(SEE DETAIL)

2"

BFP

1" MAKE-UP DN TO

CHILLED WATER SYSTEM

1" MAKE-UP DN

TO HEATING

WATER SYSTEM

OPC-WH-1

OPC-WH-2

PL1.1.2

PL

1.

1.

.1

C.

.1

FD-H

FD-H

FD-H

FD-H

FD-H

FD-H

FD-H

FD-H

FD-H

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

OPC-CH-1

OPC-CH-2

OPC-CH-3

OPC-CH-4

OPC-CH-5

OPC-CH-6

OPC-SH2OPC-SH1

OPC-SW-1

OPC-CWP-1

OPC-CWP-2

WT-1

OPC-CHP-1

OPC-CHP-2

OPC-B-3 OPC-B-2 OPC-B-1

CO

3/4"

3/4" 3/4"

1"

2"

3/4"

1"

1"

3/4"

1"

1"

1 1/4"

1 1/4"

4"

2 1/2" 1"

2 1/2"

1"

2"

4"

4"

2 1/2"

4" 2 1/2"

4"

4"

4"

1 1/2"

1 1/4"

2"

1 1/4"

1 1/2"

1 1/2"

1 1/2"

1 1/4"

3/4"

3/4"

1"

1 1/4" 1 1/4"

1 1/4"

1 1/4"

2"

1 1/4"

2"

2" 2"

4" SAN DN,

2" V UP

SAN

CO 4" SAN UP

4" SAN DN,

2" V UP

4" SAN UP

SAN

4" SAN UP

SAN SAN

S

AN

4" SAN UP

CO

4"

D C

W

1 1/2"

3/4"

1"

1"

V V

V V

2" SAN UP

CO

3/4"

CO

FD-C

FD-C

FD-C

FD-C

FD-C

PC

P C

1"

PC

CO

NG NG

N G

3" SAN UP

N

PW

NPW

NPW NPW

2"

2 1/2"

2 1/2"

2" 2" 2"

NPW

N

PW

1 1/2"2"

1"

2"

3/4"

2"

2 1/2"

S

AN

4" SAN UP

4" SAN DN,

3" V UP

3/4"

V

3" V DN

3"

4"

CO

3" V UP

4" SAN DN

4" SAN UP

2" V

3" V UP

2" V UP

CO

3"

3"

2" SAN UP

COWCO

3"

2" SAN UP

2" SAN UP

2"

3" V UP

3" SAN UP

CO

1 1/2"

2" SAN UP

4" ST (OF) UP

(5,089 SQ. FT.) 5

OFD

WCO

WCO

WCO

CO

2" V UP

DDCA

(SEE DETAIL)

CO

4" ST UP

ST

TP TP

TP TP

TP

TP TP

T P T

P T

P T P

T P

T P T P

T P

T P T

P

TP

T P

1/2"TP IN WALL DN TO

UNDERSLAB FOR FD-H IN

MECH ROOM #1701

T P

T P

T P

T P

TP

TP

DHWR

PC

WCO

CO

2" SAN UP

S

AN

BV

DHW

DCW

OPC-HWP-1

OPC-HWP-2

2" V

1 1/2"

1 1/2" DCW

1 1/2" V77

2" V

2" V

1 1/2" DCW

CO

WCO

PD

6" PD

3" V UP &

4" VTR

3" HW UP TO

FD-L

SAN

4"

ST(OF)

ST(OF)

S

T( O

F)

4" ST(OF) DN

4"

4"

4" ST(OF) DN

3" SAN

2" SAN FROM HUB

DRAIN ABOVE

2" SAN UP

3" SAN UP

Pl ot

Da te:

th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

FULLY SPRINKLERED

SMITHGROUP, INC.

500 Griswold Suite 1700 Detroit, MI 48226 T 313.983.3600 F 313.983.3636 www.smithgroup.com

CIVIL ENGINEER:

J-U-B ENGINEERS, Inc.

2810 West Clearwater Ave, Suite 201 Kennewick, WA 99336 T 509.783.2144 F 509.736.0790

DOOR HARDWARE:

Jenosky Consultanting, Inc.

Architectural Hardware Specifications 43422 West Oaks Drive #270 Novi, MI 48377-3300 T 248.496.7900

RADIATION SHEILDING DESIGN:

Diagnostic Physics, Inc.

P.O. Box 49587 Charlotte, NC 28277 T 704.541.9628 F 704.541.2843

SIGNAGE:

Inkspotdesign, Inc

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

T 248.960.115

320 W. Ohio Street, Suite 4W Chicago, IL 60654 T 312.337.9600 F 312.337.9876

DESIGN/BUILDER:

TRUE NORTH PROJECT NORTH

A3

LEVEL II DESIGN:

HDR Architecture, Inc.

440 S. Church Street, Suite 1000 Charlotte, NC 28202 Phone: (704) 338-6700

97 8654321

9/5 /20

:08 :35

A M

05AUG13

WALLA WALLA, WASHINGTON

PL1.1.3

FIRST FLOOR PLUMBING PLAN AREA 3

RWH MT 191 286

JONATHAN M. WAINWRIGHT VA

MEDICAL CENTER – MULTI-SPECIALTY

OUTPATIENT CLINIC 142

687-400

SCALE: 1/4" = 1'-0"1 01 FIRST LEVEL - PLUMBING PLAN - AREA A3

ROOM SCHEDULE LEVEL 1 AREA 3

Name Number

ELEVATOR EQUIP 1108

SOUTH STAIR 1109

COMM 1110

HAC 1111

CORRIDOR 1199G

VESTIBULE 1199N

ELEVATOR P3 1199P

BULK STOR 1401

URINALYSIS 1402

SECRETARY 1403

SPEC PROCESS 1404

CHIEF MED TECH 1405

ADPAC 1406

CHEMISTRY/ HEMATOLOGY 1407

PATH OFFICE 1408

STER SOIL PREP 1410

MICRO- BIOLOGY 1412

BIO SAFETY 1412A

RECEPTION 1421

BLOOD DRAW 1422

BLOOD DRAW 1423

SPEC TLT 1424

HALLWAY 1499A

HALLWAY 1499B

WAITING 1499C

SLEEP ROOM 1501

TLT/ SHWR 1501A

SLEEP ROOM 1503

TLT/SHWR 1503A

ST TLT 1504

SLEEP ROOM 1505

TLT/ SHWR 1505A

CONTROL 1506

DME 1506A

SLEEP ROOM 1507

TLT/ SHWR 1507A

HOLTER 1508

OFFICE 1509

OFFICE 1509A

PULMONARY TESTING 1510

TECHS 1511

C & P CLERK 1520

C & P EXAM 1522

C & P EXAM 1524

DEPLOY HEALTH 1525

DEPLOY HEALTH 1527

CONFERENCE 1528

HALLWAY 1599A

HALLWAY 1599B

HALLWAY 1599C

HALLWAY 1599D

STAFF CONF/ BREAK 1601

LOCKERS 1601A

MECHANICAL 1701

ELECTRICAL 1702

NOTES:

1. DOOR NUMBERS RELATE TO THE

ROOM NUMBER PER THE ABOVE ROOM

SCHEDULE.

2. FINISHED FLOOR ELEVATION 0'-00"

KEY NOTES

1 3/4" DCW AND DHW DN TO HOSE BIBB.

2 2" V UP.

3 INSTALL DCW/DHW PIPING CLOSE TO WALL TO

AVOID DUCT AND BEAM.

4 1" PC TO AC UNIT.

5 1" PUMPED CONDENSATE DRAIN FROM AC

UNIT. ROUTE DOWN WALL AND TERMINATE 4"

ABOVE SERVICE SINK.

6 GAS SERVICE AND METER BY LOCAL UTILITY.

7 3/4" DCW AND DHW, 1/2" W AND V TO LAB

CASEWORK SINK (BY OWNER)TO BE CAPPED

FOR FINAL CONNECTION BY OWNER.

8 6" HUB OUTLET. INSTALL 30" AFF.

9 OIL INTERCEPTOR #2: 75 GPM FLOW RATE

CAPACITY. AS MANUFACTURED BY ZURN

MODEL Z-1188.

RECORD DRAWINGS 05AUG13

Remove and replace these two water heaters and this boiler

Government furnished drawings are for reference only

VHAWWWStyneB Polygon

VHAWWWStyneB Polygon

VHAWWWStyneB Line

2 1/2"DHW (115°F) TO BLDG SYSTEM

2 1/2"DHW

1/2"DHWR

3"DWC

RPBP

4"DCW

WATER HEATER DD

P&T

2"NPW

(NON-POTABLE

WATER)

2"DCW

2 1/2"DCW

2 1/2"DCW

2 1/2"SCW

FD

2 1/2"DHW

DOMESTIC WATER

REDUCED PRESSURE

BACKFLOW PREVENTER

4"DCW

3"

WATER HEATER

3"DCW

1"DHWR

M

M

OPC-ET 3

OPC-WS 1

OPC-WH 1 OPC-WH 2

OPC-PP 1

OPC-H 1 OPC-H 2

F8 P501

D1 P501

T

DOMESTIC WATER METER WATER SOFTENING SYSTEM WATER HEATER SYSTEM HVAC MAKE-UP SYSTEM

THERMOSTATIC

MASTER MIXING

VALVE.

FROM WATER

SERVICE

TO BLDG

BRINE

TANK

CONDITIONER

TANK

DRAIN

HOUSE KEEPING PAD

HARD WATER

SOFT WATER

TO FLOOR

ISOLATION VALVE (TYP)

AUTOMATIC RESET

WATER METER

TO CT-1

TO CT-2

TO CT-3

KEYED NOTES :

1. 3/4" MAKE UP WATER TO HYDRONIC HEATING SYSTEM.

2. 3/4" MAKE UP WATER TO CHILLED WATER SYSTEM.

3. MIXING VALVE PIPING SCHEMATIC SHOWN IS BASED ON LEONARD

VALVE. ACTUAL CONNECTIONS MAY VARY DEPENDING ON MIXING

VALVE SELECTION.

4"W

VAULT WATER METER W/STRAINER

LOCKED BY-PASS NC

MAIN SHUT-OFF VALVE

2" MAKE-UP WATER

TO HVAC SYSTEM

THERMOMETER

4"WHOUSE KEEPING PAD

BALANCING VALVE (TYP)

Pl ot

Da te:

th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

FULLY SPRINKLERED

SMITHGROUP, INC.

500 Griswold Suite 1700 Detroit, MI 48226 T 313.983.3600 F 313.983.3636 www.smithgroup.com

CIVIL ENGINEER:

J-U-B ENGINEERS, Inc.

2810 West Clearwater Ave, Suite 201 Kennewick, WA 99336 T 509.783.2144 F 509.736.0790

DOOR HARDWARE:

Jenosky Consultanting, Inc.

Architectural Hardware Specifications 43422 West Oaks Drive #270 Novi, MI 48377-3300 T 248.496.7900

RADIATION SHEILDING DESIGN:

Diagnostic Physics, Inc.

P.O. Box 49587 Charlotte, NC 28277 T 704.541.9628 F 704.541.2843

SIGNAGE:

Inkspotdesign, Inc

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

T 248.960.115

320 W. Ohio Street, Suite 4W Chicago, IL 60654 T 312.337.9600 F 312.337.9876

DESIGN/BUILDER:

TRUE NORTH PROJECT NORTH

LEVEL II DESIGN:

HDR Architecture, Inc.

440 S. Church Street, Suite 1000 Charlotte, NC 28202 Phone: (704) 338-6700

97 8654321

9/5 /20

:10 :34

A M

05AUG13

WALLA WALLA, WASHINGTON

PL6.2

DOMESTIC WATER HEATER DIAGRAM

RWH MT 209 286

JONATHAN M. WAINWRIGHT VA

MEDICAL CENTER – MULTI-SPECIALTY

OUTPATIENT CLINIC 142

687-400

SCALE: 12" = 1'-0"1 DOMESTIC WATER HEATER DIAGRAM

RECORD DRAWINGS 05AUG13

Remove and replace these two water heaters

Government furnished drawings are for reference only

VHAWWWStyneB Polygon

M

M

8 NATURAL GAS - BURNER AND IGNITER FUEL STANDARD PIPING DIAGRAM

NTS

G G

VENT SIZE IN. [mm]FUEL SSO VALVE SIZE IN. [mm]

4-5 [100-125]

2 1/2-3 [65-75]

6 [150] 2 1/2 [65]

2 [50]

1 1/4 [32]

1/2-1 1/2 [15-40]

2 [50] 1 [25]

3/4 [20]

[1219mm] MAX.

PRV

G G (I)

FILTER

G

LP

F(

I)

G/LPG(I)

V

V

VV

NOTES:

1.

2.

3.

PIPING SIZED BY BURNER MFGR. TO SUIT FLOW REQUIREMENTS &

AVAILABLE PRESSURE.

SIZE AUTOMATIC VENT VALVES & VENT PIPING AS FOLLOWS:

VENT HEADER SAME SIZE AS MAIN BURNER VENT.

FUEL FLOW

CONTROL VALVE

0-1.5xMAX.

BURNER PRESS

(IN. WC)

DIRT

POCKETS

HIGH PRESS.

CUTOUT SW.

3/8" [10mm]V

LOCKABLE

AUTOMATIC

VENT VALVE

SEE NOTE 2

SAFETY SHUT-OFF VALVESSEE NOTE 1

PRVFILTER

3/4" [20mm]V

1/2" [15mm]V

0-30 PSIG

[0-200kPa]

MAIN

BURNER

LOW PRESS.

CUTOUT SW.

0-1.5xPRV SET

PRESS.

DIRT

POCKET

V

V

G

TYPICAL BURNER MAIN GAS &

IGNITER (PILOT) GAS PIPING

FILTER PRV

3/4" [20mm]

1" [25mm] FROM PRV

INTERNAL RELIEF VENTS

1" [25mm] FROM PRV

CASING PILOT VENTS

FLEX. CONN.

IGNITER (PILOT)

AUTOMATIC VENT VALVE

1" [25mm]

3/4" [20mm]

0-30 PSIG

[0-200kPa]

LOW PRESS.

CUTOUT SW.

SEE NOTE 1

3-WAY

SAFETY SHUT-OFF VALVES

SEE NOTE 2

SEE NOTE 2

0-1.5xPRV

SET PRESS.

ROOF

SCREENED OUTLET OR

VENT CAP (TYP.)

[6 m m

MAIN GAS METERING & REGULATING AREA

OUT SIDE

BLDG. WALL

TO OTHER

BOILERS AND DOMESTIC

WATER HEATERS

FROM GAS MAIN

__PSIG [__kPa]

PRV - OUTLET PRESS:

___PSIG [___kPa]

1/2" [50mm]V

STRAIGHTENING VANES AS REQUIRED

BY MFGR OF GAS FLOW METER

1/2" [50mm]V

FILTER FLOW

METER

M-__

0-160°F [0-70°C]

0-30 PSIG

[0-200kPa]

0-1.5xLINE

PRESS

EARTHQUAKE AUTOMATIC

GAS SHUT-OFF VALVE3

EV

1/2" [15mm] TO PRESSURE GAGE

(INSTRUMENTATION PANEL)

HIGH PRESSURE SW.

(ANNUNCIATOR)

1/2" [50mm]V

EMERGENCY GAS

SAFETY SHUT-OFF VALVE1

EV

DIRT

POCKET

3/8" [10mm]V

3/8" [10mm]V

LOCKABLE

3/8" V [10mm]

CONNECTION TO OUTSIDE BUILDING

FOR EMERGENCY BOILER

CONNECTION

4' MAX.

GAS METER AND GAS SERVICE

BY LOCAL UTILITY

3/4"

GAS METER FOR DDC TO

MONITOR TOTAL BLDG.

NATURAL GAS USAGE

F

Pl ot

Da te:

th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

Drawing Title

Approved: Project Director

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 87 9

F

E

D

C

B

A

TRUE NORTH PROJECT NORTH

97 8654321

9/5 /20

:10 :31

A M

15NOV23

WALLA WALLA, WASHINGTON

PLUMBING DETAILS

3 5

Project Title

JONATHAN M. WAINWRIGHT VA

MEDICAL CENTER – BOILER

REPLACEMENT 143

687-24-110

RECORD DRAWINGS 05AUG13

Government funished drawings are for reference only

FROM GAS METER ASSEMBLY

B-1

1,800 MBH

B-3

1,800 MBH

B-4

1,800 MBH

(FUTURE)

2" NG

4" NG AT 0.5 PSI 8,000 MBH

DRIP LEG (TYP)

B-2

1,800 MBH

OPC-WH 2

400 MBH

OPC-WH 1

400 MBH

2" NG

2" NG

2" NG (FUTURE)

1 1/4" NG

4" NG

1 1/4" NG

400 MBH

2" NG

800 MBH

3" NG

2,600 MBH

3" NG

4,400 MBH

4" NG

6,200 MBH

4" NG

8,000 MBH

CAP VALVE

FOR FUTURE

BOILER

Pl ot

Da te:

th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

Office of Facilities

Management

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

TRUE NORTH PROJECT NORTH

97 8654321

9/5 /20

:10 :37

A M

15NOV23

WALLA WALLA, WASHINGTON

NATURAL GAS DIAGRAM

4 5

Project Title

JONATHAN M. WAINWRIGHT VA

MEDICAL CENTER – BOILER

REPLACEMENT 143

687-24-110

12" = 1'-0"1 Natural Gas Diagram

RECORD DRAWINGS 05AUG13

Government funished drawings are for reference only

Remove and replace boiler

Remove and replace these two water heaters

F.

AFM

OPC-B-1

O

PC

-C H

-1

OPC-CHP-2OPC-CHP-1

O

PC

-C W

P-

O

PC

-C W

P-

OPC-WS1

WH-1

WH-2

WT-1

OPC-AS-2

OPC-B-3 OPC-B-2

M4.1

M4.1

M4.2

M4.2

M4.3

M4.4

O

PC

-C H

-2

O

PC

-C H

-3

O

PC

-C H

-4

O

PC

-C H

-5

O

PC

-C H

-6

OPC-SH2

OPC-SH1

OPC-ET-1

OPC-ET-2

O

PC

-A S-

OPC-CT-1 OPC-CT-2 OPC-CT-3

OPC-SW-1

DCW3"

CWR

N

PW

CHWS

8"

8"

8" 8"

5" 5"

HHWR

HWHS5"

5"

3"

8"

8"

CHWR6"

DCW2 1/2"

D H

W R

3/ 4"1

1/ 2"

DHW2 1/2"

53"x138"

130"x32"

130"x32"

62"x28" 62"x28"

H H

W R

H W

H S

5" 5"

4" H

H W

R

4" H

W H

S

1/

2" 4"

1"

6"

HHWR6"

H W

H S

OPC-EF1

12"ø

OPC-PP-1

OPC-ET-3

RPBP

DC

W

REFER TO CIVIL DWGS AND

SHEETS P6.1/P6.2 FOR

ADDITIONAL INFORMATION

DDCA

F

REFER TO CIVIL DWGS AND

FIRE PROT. SHEETS

FX2.1/FX5.0 FOR

ADDITIONAL INFORMATION

BFP

GAS METER

S

AN V

6"

6" 6"

ST(OF)

Pl ot

Da te:

th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT/ENGINEERS:

Office of Facilities

Management

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

DESIGN/BUILDER:

TRUE NORTH PROJECT NORTH

97 8654321

9/5 /20

:00 :35

A M

15NOV23

WALLA WALLA, WASHINGTON

M4.0

ENLARGED MECHANICAL ROOM

PLANS

RWH MT 5 5

Project Title

JONATHAN M. WAINWRIGHT VA

MEDICAL CENTER - BOILER

REPLACEMENT RELACEMENT 143

687-24-110

SCALE: 1/4" = 1'-0"1 01 FIRST LEVEL - MECHANICAL ROOM PLAN

RECORD DRAWINGS 05AUG13

Government funished drawings are for reference only

Remove and replace this boiler

Remove and replace these two water heaters

VHAWWWMorelM Polygon

VHAWWWMorelM Line

VHAWWWStyneB Polygon

M - Sheet - FX-0 - FIRE PROTECTION ABRREVIATIONS AND SYMBOLS
M - Sheet - FX2-1 - FIRST FLOOR FIRE PROTECTION PLAN
M - Sheet - P0 - PLUMBING ABBREVIATIONS AND SYMBOLS
M - Sheet - PL1-0-1 - UNDERGROUND PLUMBING PLAN AREA 1
M - Sheet - PL1-0-2 - UNDERGROUND PLUMBING PLAN AREA 2
M - Sheet - PL1-0-3 - UNDERGROUND PLUMBING PLAN AREA 3
M - Sheet - PL1-0-4 - UNDERGROUND PLUMBING PLAN AREA 4
M - Sheet - PL1-1-3 - FIRST FLOOR PLUMBING PLAN AREA 3
M - Sheet - PL1-2-3 - SECOND FLOOR PLUMBING PLAN AREA 3
M - Sheet - PL6-1 - PLUMBING DETAILS
M - Sheet - PL6-2 - DOMESTIC WATER HEATER DIAGRAM
M - Sheet - PL6-3 - NATURAL GAS DIAGRAM
M - Sheet - PL7-0 - PLUMBING SCHEDULES
M - Sheet - M0 - MECHANICAL ABBREVIATIONS AND SYMBOLS
M - Sheet - MH2-1-1 - FIRST FLOOR HVAC PLAN AREA 1
M - Sheet - MH2-1-2 - FIRST FLOOR HVAC PLAN AREA 2
M - Sheet - MH2-1-3 - FIRST FLOOR HVAC PLAN AREA 3
M - Sheet - MH2-1-4 - FIRST FLOOR HVAC PLAN AREA 4
M - Sheet - MH2-1-5 - FIRST FLOOR HVAC PLAN AREA B1
M - Sheet - MH2-2-1 - SECOND FLOOR HVAC PLAN AREA 1
M - Sheet - MH2-2-2 - SECOND FLOOR HVAC PLAN AREA 2
M - Sheet - MH2-2-3 - SECOND FLOOR HVAC PLAN AREA 3
M - Sheet - MH2-2-4 - SECOND FLOOR HVAC PLAN AREA 4
M - Sheet - MH2-2-5 - SECOND FLOOR HVAC PLAN AREA B1
M - Sheet - MH2-3-0 - ROOF LEVEL HVAC PLAN
M - Sheet - MP3-1 - FIRST FLOOR HVAC PIPING PLAN
M - Sheet - MP3-2 - SECOND FLOOR HVAC PIPING PLAN
M - Sheet - MP3-3 - FIRST & SECOND FLOOR CONNECTOR HVAC PIPING PLANS
M - Sheet - M4-0 - ENLARGED MECHANICAL ROOM PLANS
M - Sheet - M4-1 - MECHANICAL SECTIONS
M - Sheet - M4-2 - MECHANICAL SECTIONS
M - Sheet - M4-3 - MECHANICAL SECTIONS
M - Sheet - M4-4 - MECHANICAL SECTIONS
M - Sheet - M5-0 - HVAC FLOW DIAGRAM # 1
M - Sheet - M5-1 - HVAC FLOW DIAGRAM # 2
M - Sheet - M6-1-1 - HVAC DETAILS
M - Sheet - M6-1-2 - MECHANICAL AHU DETAILS
M - Sheet - M6-2-1 - HVAC PIPING DETAILS
M - Sheet - M6-2-2 - HVAC PIPING DETAILS
M - Sheet - M6-3-1 - HVAC MISC- DETALS
M - Sheet - M6-3-2 - HVAC MISC- DETALS
M - Sheet - M7-0 - MECHANICAL SCHEDULES
M - Sheet - M7-1 - MECHANICAL SCHEDULES
M - Sheet - M7-2 - MECHANICAL SCHEDULES
M - Sheet - M7-3 - MECHANICAL SCHEDULES
M - Sheet - M7-4 - MECHANICAL SCHEDULES
M - Sheet - M8-1 - CONTROL DIAGRAMS
M - Sheet - M8-2 - CONTROL DIAGRAMS
M - Sheet - M8-3 - CONTROL DIAGRAMS
M - Sheet - M8-4 - CONTROL DIAGRAMS
M - Sheet - M8-5 - CONTROL DIAGRAMS
M - Sheet - M8-6 - CONTROL DIAGRAMS
M - Sheet - M8-7 - CONTROL DIAGRAMS
M - Sheet - M8-8 - CONTROL DIAGRAMS

File details come from the government source that posted it. Updated .