This is a comprehensive set of bid documents and drawing specifications for a construction project to install alternate connections for steam and chilled water systems at Lake Nona VA Medical Center in Orlando, Florida (Project 675-22-117). The drawings include 32 sheets covering architectural, structural, civil, mechanical, plumbing, and electrical disciplines with detailed plans, elevations, sections, and specifications for piping connections, equipment pads, structural supports, and electrical infrastructure required to connect temporary boiler and chiller equipment to the existing central energy plant.
The project requires installation of new piping connections for high-pressure steam (10"), boiler feed water (2.5"), steam return (4"), chilled water supply and return (12"), and condenser water systems (18"). The scope includes structural support systems with HSS steel columns and concrete footings, equipment pads for disconnects and transformers, conduit duct banks for electrical service, weatherproof enclosures for exterior connections, flow metering stations with VORTEX meters, and DDC controls integration with the existing Johnson Controls Metasys system. Work involves coordination with multiple building systems including HVAC, plumbing, fire protection, and security systems, with phased construction to maintain continuous hospital operations and limitations on service interruptions to one hour maximum for scheduled shutdowns. The drawings specify conformance to VA technical standards, International Building Code, International Mechanical Code, and NFPA codes, with comprehensive general notes addressing demolition procedures, utility coordination, pipe freezing requirements, fire-sealing of penetrations, test and balance requirements, and detailed coordination requirements between trades.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
GI001
DRAWING
NO.
DRAWING TITLE
GENERAL
CIVIL
SHEET
NO.
COVER SHEET
INSTALL ALTERNATE CONNECTIONS FOR
STEAM AND CHILLED WATER
PROJECT NUMBER: 675-22-117
BID DOCUMENTS
LAKE NONA VA MEDICAL CENTER
ORLANDO, FL
KEY MAPC-001
MECHANICAL
MECHANICAL LEGEND, ABBREVIATIONS, AND NOTESM001
CENTRAL ENERGY PLANT OVERALL GROUND FLOOR PLAN MECHANICALM101
M102
LOCATION MAP
NOT TO SCALE
AREA MAP
NOT TO SCALE
TRUE
NORTH
PLAN
NORTH
PROJECT LOCATION PROJECT LOCATION
TRUE
NORTH
PLAN
NORTH
BOILER PLANT AND STEAM SYSTEM CONNECTION
M103 CHILLED WATER SYSTEM CONNECTION
M104 CONDENSER WATER SYSTEM CONNECTIONS
M501 SCHEMATIC FLOW DIAGRAM STEAM SYSTEM - DEMOLITION AND NEW WORK PLAN
NOTES AND LEGENDC-010
ARCHITECTURAL
ARCHITECTURAL SITE DEMO PLANASD101
ARCHITECTURAL SITE PLANAS101
DEMOLITION AND EROSION CONTROL PLANC-050
SITE PLANC-100
GRADING, DRAINAGE, & UTILITY PLANC-200
M502
M503 MECHANICAL PIPING DETAILS
M601 MECHANICAL SCHEDULES
STRUCTURAL
STRUCTURAL NOTESS001
FOUNDATION & FRAMING PLANSS101
PLUMBING
PLUMBING LEGEND, ABBREVIATIONS AND NOTESP001
BOILIER PLANT CONNECTIONP102
PLUMBING SECTIONS AND DETAILSP103
PLUMBING PIPING DETAILSP501
ELEVATIONSS201
CONCRETE DETAILSS301
STEEL DETAILSS502
SCHEMATIC FLOW DIAGRAM STEAM SYSTEM - DEMOLITION AND NEW WORK PLAN
M800 CONTROL LEGEND AND SEQUENCE OF OPERATION
SHEET
NO.
DRAWING TITLE
ELECTRICAL LEGEND, ABBEVIATIONS AND NOTESE001
ELECTRICAL PLANE101
ELECTRICAL DETAILSE601
ELECTRICAL SITE PLANES101
ELECTRICAL
GI002 GENERAL NOTES, DETAILS, ABBREVIATIONS AND LEGENDS
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
JLH SJ/SM
INSTALL ALTERNATE CONNECTIONS FOR
STEAM AND CHILLED WATER
675-22-17
ORLANDO, FL
10-26-2023REVISIONS: SHEET 0F 032 SHEETS
COVER SHEET
GI001
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND
GENERAL ARCHITECTURAL NOTES
GENERAL PROJECT NOTES
A
GA4
A301
A201
A401
ROOM
NAME
+ 0'-6"
F.E.C.
AIR CONDITIONING
ACOUSTICAL CEILING TILE
ABOVE FINISH FLOOR
ALUMINUM
BATT INSULATION
BOTTOM OF
CEMENTITIOUS BACKER BOARD
CEMENTITIOUS CRYSTALLINE WATERPROOFING
COLD-FORMED METAL FRAMING
CORNER GUARD
CENTERLINE
CONCRETE MASONRY UNIT
CASED OPENING
COMMUNICATION
CONCRETE
SEALED CONCRETE
CONTINUOUS
CONTRACTING OFFICER'S REPRESENTATIVE
CERAMIC TILE
CERAMIC TILE BASE
CARPET
DIAMETER
EXPANSION JOINT
ELECTRICAL
EPOXY FLOORING
EXPOSED STRUCTURE
ET CETERA
EXISTING
EXPOSED
FACTORY FINISH
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FINISHED FLOOR
FINISH
FLOOR
FACE OF
FIELD VERIFY
FABRIC WALLCOVERING
GAGE
GRANITE
GYPSUM (WALL) BOARD
HANDICAPPED
HOLLOW METAL
HANDRAIL
HEATING VENTILATION AND AIR-CONDITIONING
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
METAL
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
PLASTER
PLASTIC LAMINATE
PORCELAIN TILE
PAIR
PAINT
QUARRY TILE
RESILIENT BASE
REFRIGERATOR
REQUIRED
RESINOUS FLOORING
RESINOUS EPOXY WALL-CEILING
ROUGH OPENING
RUBBER FLOORING
RECESSED PAPER HOLDER
SEALED HIGH BUILD GLAZED COATING
SOLID CORE WOOD
SIMILAR
SPECIAL FACED
STAINLESS STEEL
STEEL
SUBSTRATE
SHEET VINYL
SOLID VINYL TILE
TELEPHONE
TOP OF
TYPICAL
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VINYL WALL COVERING
WALL COVERING
WALL PROTECTION
WOOD
WELDED SEAM SHEET FLOORING
AC
AT
AFF
AL
BATT
BO
CBB
CCW
CFMF
CG
C
CMU
CO
COMM
CONC
SCONC
CONT
COR
CT
CTB
CP
DIA
EJ
ELEC
EPY
ES
ETC
EXIST
EXP
FAC FIN
FD
FEC
FHC
FF
FIN
FLR
FO
FV
FWC
GA
GRA
GYP BD/GWB
HC
HM
HR
HVAC
MATL
MAX
MECH
MFR
MIN
MO
MTL
NIC
NTS
OC
OH
PLS
PL
PT
PR
P
QT
RB
REF
REQ'D
RES
RES-W
RO
RF
RPH
SC
SCW
SIM
SP
SS
STL
SUBS
SV
SVT
TELE
TO
TYP
UNO
VCT
VWC
WC
WP
WD
WSF
L
FIRE EXTINGUISHER CABINET
ROOM NAME AND NUMBER
DOOR NUMBER
KEY NOTE
WINDOW TYPE
PARTITION TYPE
DETAIL CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
SECTION CALLOUT
VERTICAL ELEVATION
COLUMN CENTERLINE DESIGNATION
DEMOLITION KEY NOTE
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
INTERIOR ELEVATION CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
CARD READERCR
HIGH-PRESSURE LAMINATEHPL
LUXURY VINYL TILELVT
EDGE OF DECKEOD
DOWNSPOUTDS
CONTROL JOINTCJ
DRINKING FOUNTAINDF
FIRE RETARDANT TREATEDFRT
EXTERIOR INSULATION FINISHING SYSTEMEIFS
WATER RESISTANTWR
J1
SECTION CUT
HEAD/JAMB/SILL DETAIL NUMBER EQUALEQ
CARPET TILECPT
REFLECTED CEILING PLANRCP
SOLID SURFACE MATERIALSSM
X1045 EQUIPMENT JSN NUMBER
ALUMINUM COMPOSITE METAL PANELSACMP
A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:
• FACE OF EXISTING WALL SURFACE
• FACE OF NEW MASONRY
• FACE OF NEW WALL STUDS
• TOP OF SLAB
• TOP OF MASONRY
• ALIGN NEW WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED.
B. COORDINATE WITH ALL DISCIPLINES DRAWINGS FOR ADDITIONAL REQUIREMENTS.
COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING
WALLS AND SLABS ARE CREATED FOR PENETRATIONS, COORDINATE SIZE AND LOCATION.
PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT,
GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,
MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.
C. COORDINATE AND PROVIDE GALVANIZED METAL BACKER PLATE OR SOLID FIRE
RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS. COORDINATE
LOCATIONS WITH COR FOR GOVERNMENT PROVIDED/CONTRACTOR INSTALLED
EQUIPMENT.
D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING,
INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED.
E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND
FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF
THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR
APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES.
F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING.
G. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS
REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL
BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES.
WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.)
EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES
SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF NEW
MATERIALS.
H. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM
CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST.
WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.
A. THE CONTRACTOR SHALL BE PERPARED TO STOP ANY WORK AND CLEAN UP THE WORK AREA
IF SO ASKED IN EMERGENCY SITUATIONS REQUIRING SUCH ACTION.
B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL
SUBMIITTALS FOR SUCH HAVE BEEN APPROVED.
C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL
TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A
HAZARD TO PATIENTS, VISITORS AND STAFF.
D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF
HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE
WITH COR.
E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF
HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE
ALLOWED TO PERFORM WORK ON VA PREMISES.
F. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUPMENT WILL BE LOANED OR GIVEN BY THE VA
TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME.
G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE,
DUST AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING
CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AN CLEARED WITH THE COR
AND THE VA SAFETY OFFICER. ALL FUNCIONAL FIRE ALARM DEVICES SHALL BE ACTIVE
WHENEVER THE CONTRACTOR'S FORCES ARE NOT PRESENT IN THE WORK AREA.
H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY
WORK DAY TO THE COR CERIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND FOUND
TO BE SECURE, SAFE AND FREE OF ANY FLAMMABLE LIQUIDS.
I. CONTRACOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER.
J. SEE SPECIFICATONS SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.
K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR DESIGNER WHERE NOT
OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT COLORS FROM THE MANUFACTURER'S
FULL RANGE OF COLORS.
L. PROVIDE 24"X24" ACCESS PANELS IN HARD CEILINGS WHERE DUCTS AND DAMPERS OR OTHER
PIPES REQUIRE ACCESS AS REQUIRED. COORDINATE EXACT LOCATIONS WITH THE COR.
M. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT WITHOUT
AUTHORIZATION FROM VAMC ENGINEERING SERVICE UNLESS AN EMERGENCY SITUATION
OCCURS.
N. CONTRACOR SHALL MAINTAIN ALL FIRE-RATED ASSEMBLIES WITHIN THE PROJECT AREA
DURING PERFORMANCE OF THE WORK.
O. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL REQUIRED EXIT LIGHTING AND SIGNAGE
REQUIRED FOR EGRESS WITHIN AND ADJACENT TO THE PROJECT AREA DURING
PERFORMANCE OF THE WORK.
P. INDICATED EXISITNG CONDITIONS ARE BASED UPON LIMIITED FIELD INVERSTIGATION AND DID
NOT INCLUDE DESTRUCTIVE INVESTIGATION OR TESTING. CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS INCLUDING DIMENSIONS OF THE INSTALLED CONSTRUCTION PRIOR TO
COMMENCING WITH THE WORK. IF DISCREPENCIES ARE DISCOVERED, THE CONTRACTOR
SHALL NOTIFY THE COR FOR INTERPRETATION AND DIRECTION PRIOR TO PROCEEDING WITH
THE WORK.
Q. THE CONTRACTOR SHALL LOCATE EXISTING WALL REINFORCING THROUGH NON-DESTRUCTIVE
MEANS PRIOR TO SUBMISSION OF CONDUIT LAYOUT DRAWINGS FOR REVIEW. IN NO INSTANCE
SHALL EXISTING WALL REINFORCING BE CUT DURING CORING WITHOUT A/E REVIEW AND
WRITTEN APPROVAL OF THE COR.
A ACCESSORY TYPE
UL DETAIL C-AJ-1254UL DETAIL W-L-2038
NOTE: ANY UL ASSEMBLY MEETING CRITERIA MAY
BE UTILIZED. ASSEMBLIES INDICATED ON THIS
SHEET ARE FOR INFORMATION ONLY.
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
JLH SJ/SM
INSTALL ALTERNATE CONNECTIONS FOR
STEAM AND CHILLED WATER
675-22-17
ORLANDO, FL
10-26-2023REVISIONS: SHEET 0F 032 SHEETS
GENERAL NOTES, DETAILS, ABBREVIATIONS
AND LEGENDS
GI002
Feet 0 150 300
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2023-10-26 gmuereng.com
(352) 281-4928
2603 NW 13th ST, Box 314
Gainesville, FL 32609
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
INSTALL ALTERNATE CONNECTIONS
FOR STEAM AND CHILLED WATER
ORLANDO, FL
675-22-17
Project Director
10-26-2023REVISIONS: DATE: CAG ABG
Fi le
: 2 3-
-C -0
D
EM
O
.D W
G
LA
ST
S
AV
ED
: 2
3-
-2
:0 3:
A
M
PL
O
T
SC
AL
E
: 1 :1
P
LO
TT
ED
: 2
3-
-2
:0 3:
A
M
U
SE
R : C hr is
G
SHEET 0F 032 SHEETS
590 MEANS ST NW
STE. 200
ATLANTA, GA 30318
KEY MAP
C-001
LAUREATE BLVD
TAVISTOCK LAKES BLVD
VETERANS W
AY
VETERANS W
AY
C
EN
TE
R
LI
N
E D
R
IV
E
H
IT
C H
IN
G
S
AV
E
LAKE NONA BLVD
C-050 C-100 C-200
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2023-10-26 gmuereng.com
(352) 281-4928
2603 NW 13th ST, Box 314
Gainesville, FL 32609
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
INSTALL ALTERNATE CONNECTIONS
FOR STEAM AND CHILLED WATER
ORLANDO, FL
675-22-17
Project Director
10-26-2023REVISIONS: DATE: CAG ABG
Fi le
: 2 3-
-C -0
D
EM
O
.D W
G
LA
ST
S
AV
ED
: 2
3-
-2
:0 3:
A
M
PL
O
T
SC
AL
E
: 1 :1
P
LO
TT
ED
: 2
3-
-2
:0 3:
A
M
U
SE
R : C hr is
G
SHEET 0F 032 SHEETS
590 MEANS ST NW
STE. 200
ATLANTA, GA 30318
NOTES AND LEGEND
C-010
DESIGN ELEMENTS AND INFORMATION FURNISHED BY
OTHERS
1. THE ENGINEER AND ITS CONSULTANTS PREPARED THESE PLANS AND DESIGN DOCUMENTS THROUGH THE USE OR
RELIANCE UPON DESIGN ELEMENTS AND INFORMATION ORDINARILY OR CUSTOMARILY FURNISHED BY OTHERS, INCLUDING, BUT NOT LIMITED TO, SURVEYORS, GEOTECHNICAL ENGINEERS, ENVIRONMENTAL CONSULTANTS, ARCHITECTS, BUILDING SYSTEMS ENGINEERS, SPECIALTY CONTRACTORS, MANUFACTURERS, SUPPLIERS, AND THE PUBLISHERS OF TECHNICAL STANDARDS. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR DESIGN ERROR
AND OMISSIONS RESULTING FROM THE QUALITY OF THIS INFORMATION.
2. ALL POINTS OF COORDINATION OR INTERFACE BETWEEN THESE PLANS AND DESIGN DOCUMENTS AND THE PLANS
AND DESIGN DOCUMENTS OF OTHERS MUST BE COMPARED BY THE CONTRACTOR.
3. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE PROCURING MATERIALS AND
INSTALLATION.
UTILITY LOCATES, RELOCATION, PROTECTION, AND
TERMINATION
1. UTILITY LOCATES SHALL BE COMPLETED BY THE CONTRACTOR PRIOR TO THE INITIATION OF SITE CONSTRUCTION.
2. PROPOSED UTILITY TAPS AND CROSSINGS SHALL BE PHYSICALLY LOCATED AND VERIFIED BY THE CONTRACTOR AS
SOON AS PRACTICABLE AND SHALL CONTACT THE ENGINEER IMMEDIATELY WITH ANY DISCREPANCIES OR
CONFLICTS.
3. UTILITY RELOCATION, SUPPORT, PROTECTION, TERMINATION, CAPPING, AND REMOVAL SHALL BE COORDINATED BY THE CONTRACTOR WITH UTILITY COMPANIES. ADEQUATE TIME SHALL BE PROVIDED FOR PROPER COORDINATION
AND TO MINIMIZE SERVICE INTERRUPTIONS.
4. CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES TO THE UTILITY COMPANY FOR THEIR
SERVICES.
SAFETY AND TEMPORARY TRAFFIC CONTROL
(MAINTENANCE OF TRAFFIC)
1. ALL SAFETY REGULATIONS AND PRACTICES SHALL BE ENFORCED BY THE CONTRACTOR THROUGHOUT THE
DURATION OF THIS PROJECT. THIS ALSO INCLUDES THE TRAVELING PUBLIC. THE FOLLOWING IS A NOTICE TO THE CONTRACTOR AND DOES NOT IMPLY THAT THE OWNER OR ENGINEER WILL INSPECT OR ENFORCE SAFETY
REGULATIONS.
2. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) REGULATIONS.
3. ALL SUBSURFACE CONSTRUCTION SHALL CONFORM TO THE PROVISIONS SET FORTH BY THE "TRENCH SAFETY ACT".
4. TEMPORARY TRAFFIC CONTROL (TTC) IS REQUIRED FOR ALL WORKS ON HIGHWAYS, ROADS, STREETS, BIKE LANES, SIDEWALKS AND SHALL HAVE A TTC PLAN. THE PLAN SHALL BE PREPARED BY A PROFESSIONAL ENGINEER THAT IS FDOT ADVANCED MOT CERTIFIED AT THE COST OF THE CONTRACTOR. ALL WORK SHALL BE EXECUTED UNDER THE ESTABLISHED TTC PLAN AND THE REVIEWING AGENCY'S APPROVED PROCEDURES. THE PLAN AND WORK SHALL BE
AT THE CONTRACTOR'S EXPENSE.
GENERAL AND MISCELLANEOUS NOTES
1. THESE PLANS, DESIGN DOCUMENTS, AND NOTES ARE NOT EXHAUSTIVE. ALL THE APPLICABLE CONSTRUCTION
STANDARDS AND DETAILS THAT ARE LISTED, REFERENCED, OR IMPLIED ARE INCLUDED IN THE CONTRACT
DOCUMENTS BY REFERENCE.
2. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE REVIEWING AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
3. THE REPAIR OF DAMAGE EITHER ABOVE OR BELOW GROUND BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. DAMAGE WILL BE IN THE OPINION OF THE OWNER, APPLICABLE AGENCY, OR ENGINEER. ALL REPAIRS SHALL BE MADE AT CONTRACTOR EXPENSE IN A MANNER SPECIFIED BY THE
PARTICULAR ENTITY.
4. CONTRACTOR IS RESPONSIBLE FOR GRADING ALL PAVEMENT, SIDEWALKS, AND GRADING AROUND BUILDINGS TO DRAIN POSITIVELY. INTERSECTIONS SHALL BE TRANSITIONED TO PROVIDE SMOOTH DRIVING SURFACE WHILE
MAINTAINING POSITIVE DRAINAGE.
5. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY OBSERVED AREAS OF POOR DRAINAGE PRIOR TO PLACEMENT
OF CURBS OR PAVEMENT COURSES.
6. ALL UNDERGROUND UTILITIES MUST BE INSTALLED, INSPECTED, AND TESTED PRIOR TO PAVEMENT BASE OR
SIDEWALK INSTALLATION.
EROSION CONTROL AND STABILIZATION
1. CONTRACTOR IS REQUIRED TO SUBMIT A COMPLETE NOI AND APPROPRIATE FEE TO SECURE A FDEP GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES (CGP) AT LEAST TWO DAYS BEFORE CONSTRUCTION BEGINS. A PERMIT IS REQUIRED FOR CONSTRUCTION ACTIVITIES THAT DISTURB ONE OR MORE ACRES OR IF THE PROJECT IS PART OF A LARGER DEVELOPMENT THAT WILL ULTIMATELY DISTURB ONE
OR MORE ACRES.
2. PROJECTS THAT DISCHARGE STORMWATER TO AN MS4, A COPY OF THE NOI MUST ALSO BE SUBMITTED TO THE
OPERATOR OF THE MS4.
3. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR OBTAINING PERMIT COVERAGE AND IMPLEMENTING APPROPRIATE POLLUTION PREVENTION TECHNIQUES TO MINIMIZE EROSION AND SEDIMENTATION FROM STORMWATER DISCHARGES DURING CONSTRUCTION. THE ENGINEER SHOULD NOT BE LISTED AS THE OPERATOR
AS THEY DO NOT HAVE OPERATIONAL CONTROL OVER THE PROJECT.
4. WHEN THE OPERATOR CHANGES, THE NEW OPERATOR SHOULD OBTAIN PERMIT COVERAGE AT LEAST 2 DAYS BEFORE ASSUMING CONTROL OF THE PROJECT, AND THE PREVIOUS OPERATOR SHOULD FILE AN NPDES STORMWATER NOTICE OF TERMINATION WITHIN 14 DAYS OF RELINQUISHING CONTROL OF THE PROJECT TO A NEW
OPERATOR.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION AND SEDIMENTATION CONTROLS UNTIL
THE CONTRIBUTING DISTURBED AREAS ARE STABILIZED.
6. ALL DISTURBED AND OPEN AREAS OF THE SITE SHALL BE SODDED UNLESS INDICATED OTHERWISE.
TREE PRESERVATION AND DEMOLITION
1. CONTRACTOR SHALL VERIFY AND PROTECT ALL EXISTING TREES AND NATURAL VEGETATION THAT ARE INDICATED
TO REMAIN UNDISTURBED ON THE PLANS.
2. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY DEMOLITION.
3. ALL TREES NOT SPECIFICALLY SHOWN TO BE PRESERVED OR REMOVED SHALL CONFIRMED WITH THE REVIEWING
AGENCY AND THE OWNER. THE PROTECTION OR REMOVAL IS AT THE COST OF THE CONTRACTOR.
4. CONTRACTOR SHALL SUBMIT DEMOLITION SCHEDULE TO OWNER PRIOR TO PROCEEDING WITH DEMOLITION
ACTIVITIES.
5. DISTURBED AREAS SHALL BE CLEARED AND GRUBBED TO REMOVE ALL ROOTS, MISCELLANEOUS VEGETATION, DELETERIOUS MATERIAL, DEBRIS, ETC.
6. SOME ITEMS TO BE REMOVED OR SALVAGED MAY NOT BE DEPICTED ON THE PLANS OR SURVEY. CONTRACTOR
SHALL BE AWARE OF ALL EXISTING IMPROVEMENTS WITHIN THE CONSTRUCTION LIMITS AND CONFIRM AN
INVENTORY WITH THE OWNER.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OR SALVAGE OF ALL EXISTING BUILDINGS, STRUCTURES, SLABS, CONCRETE, ASPHALT, DEBRIS PILES, SIGNS, ETC., AND THEIR APPURTENANCES UNLESS
OTHERWISE NOTED. ALL ITEMS SHALL BE PROPERLY DISPOSED IN A LEGAL MANNER.
8. PROVIDE PROTECTION AS NECESSARY TO PREVENT DAMAGE TO EXISTING IMPROVEMENTS SHOWN IN THE PLANS
TO REMAIN.
PERMITTING, CONSTRUCTION STANDARDS, SUBMITTALS,
REQUESTS FOR INFORMATION, INSPECTIONS, TESTING,
PUNCH LISTS, RECORD DRAWINGS, AND AS-BUILTS
1. SITE CLEARING AND DEMOLITION MAY NOT BE ABLE TO BEGIN UNTIL CERTAIN PERMITS HAVE BEEN ISSUED AND MAY
REQUIRE PRE-CONSTRUCTION MEETINGS, INSPECTIONS, CLEARANCES. THESE PERMITS ARE TYPICALLY ISSUED BY
THE APPLICABLE WATER MANAGEMENT DISTRICT AND THE MUNICIPALITY.
2. OTHER PERMITS ARE REQUIRED PRIOR TO COMPLETING OTHER SITE COMPONENTS SUCH AS THE UTILITY
CONSTRUCTION PERMITS, DRIVEWAY CONNECTION PERMITS, ROW USE PERMITS, ETC.
3. CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIAR WITH AND OBTAINING ALL REQUIRED PERMITS, BONDS, TESTING, INSPECTIONS, CERTIFICATIONS, ETC. PRIOR TO AND DURING CONSTRUCTION (E.G. FDEP CGP, DEWATERING, MOT, WATER/SEWER INSPECTIONS).
4. A COMPLETE SET OF PERMITTED DRAWINGS AND SPECIFICATIONS MUST BE MAINTAINED ON SITE AT ALL TIMES
THAT THE CONTRACTOR IS PERFORMING WORK.
5. THE CONTRACTOR IS RESPONSIBILITY TO VERIFY THE CONSTRUCTION STANDARDS APPLICABLE TO EACH PORTION OF THE PROJECT. A SUGGESTED LIST OF APPLICABLE STANDARDS TYPICALLY ACCOMPANY THIS NOTE ON THIS
PLAN SHEET.
6. CONTRACTOR SHALL FURNISH SHOP DRAWINGS TO THE ENGINEER INDICATING MATERIALS AND MANNER OF INSTALLATION FOR ALL COMPONENTS OF THE PROJECT PRIOR TO PROCUREMENT OF MATERIALS AND INSTALLATION (E.G. PRECAST STRUCTURES, MANUFACTURED ITEMS). FAILURE TO OBTAIN APPROVAL BEFORE
INSTALLATION MAY RESULT IN REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE
7. ALL REQUESTS FOR INFORMATION SHALL BE SUBMITTED TO THE ENGINEER FOR RESPONSE BEFORE COMMENCING
THE RELATED WORK VIA THE OWNER'S CONSTRUCTION DOCUMENTATION PROCESS.
8. CONTRACTOR IS RESPONSIBLE FOR COMPILING A LIST INSPECTIONS AND FIELD VISITS DESIRED BY THE OWNER
AND THE ENGINEER AND REASONABLY SCHEDULING THOSE INSPECTIONS.
9. CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND COORDINATING ALL INSPECTIONS REQUIRED BY THE REVIEWING AGENCIES AS LISTED IN THE PERMITS, INSPECTOR'S REQUEST, OR IMPLIED BY THE DESIGN STANDARDS.
10. CONTRACTOR SHALL CONTRACT WITH AN INDEPENDENT TESTING LABORATORY TO PERFORM TESTING OF MATERIALS, SOILS, UTILITIES, ETC. THE TESTING SHALL BE IN ACCORDANCE WITH THE APPROVED PERMITS, CONSTRUCTION STANDARDS, INSPECTOR'S REQUEST, DESIGN REPORTS, AND STANDARD PAVING AND GRADING TESTING. THIS SHALL INCLUDE DENSITY TESTING IN ALL PAVEMENT AREAS, UTILITY TRENCH COMPACTION ESPECIALLY UNDER ROADS AND OTHER PAVED AREAS, CONCRETE, AND OTHER MATERIALS TESTING.
11. SHOULD ANY RETESTING BE REQUIRED DUE TO THE FAILURE OF ANY TESTS TO MEET THE REQUIREMENTS, THE CONTRACTOR IS RESPONSIBLE FOR ALL RETESTING COSTS AND ANY RECONSTRUCTION REQUIRED TO MEET THE
TESTING REQUIREMENTS.
12. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER THE SCHEDULE OF PUNCH LIST SITE VISITS WITH THE CONSTRUCTION SCHEDULE TO AVOID REPEAT VISITS. A TIMELINE OF ADDRESSING THE PUNCH LIST ITEMS SHALL BE PROVIDED IN A TIMELY MANNER. ANY DISPUTES SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND THE
ENGINEER.
13. RECORD DRAWINGS ARE DEFINED AS NOTES AND OTHER DOCUMENTATION COLLECTED BY THE CONTRACTOR THROUGHOUT CONSTRUCTION AS IT RELATES TO INSTALLATION PROGRESS, FIELD CONDITIONS, MEANS, METHODS, DEVIATIONS, AND OTHER VARIATIONS FROM THE CONTRACT DOCUMENTS. THE DOCUMENTATION MUST BE MADE AVAILABLE TO THE OWNER, ENGINEER, AND REVIEWING AGENCIES UPON REQUEST. RECORD DRAWINGS ARE NOT INTENDED TO BE EXHAUSTIVE, HOWEVER, VERIFICATION OF INSTALLED CONDITIONS CAN BE REQUESTED AT THE
COST OF THE CONTRACTOR UTILIZING STANDARD METHODS.
14. CONTRACTOR SHALL CONFIRM REQUIREMENTS TO PROVIDE COMPLETE AS-BUILT INFORMATION TO THE OWNER, ENGINEER, AND REVIEWING AGENCIES AT THE COST OF THE CONTRACTOR.
15. AS-BUILTS ARE DEFINED AS A DRAWING PRODUCED BY A REGISTERED LAND SURVEYOR BASED ON FIELD MEASUREMENTS OF THE FINISHED SITE IMPROVEMENTS WITH LOCATIONS, ELEVATIONS, AND DESCRIPTION OF IMPROVEMENTS. THEY SHOULD MEET REVIEWING AGENCIES REQUIREMENTS PER PERMIT AND CLOSEOUT REQUIREMENTS. THEY SHOULD ALSO MEET THE OWNER'S NEED FOR LENDING, WARRANTEE, AND OTHER
REQUIREMENTS.
16. AS-BUILTS CONTAIN AT A MINIMUM: BUILDING LOCATION AND FINISHED FLOOR ELEVATIONS, ACCESSIBLE ROUTE AND PARKING GRADES, PAVEMENT GRADE BREAKS, GRAVITY STRUCTURE TOP ELEVATIONS AND PIPE SIZES AND INVERTS, PRESSURE SYSTEM FITTINGS AND VALVES, SAMPLING POINTS, STORMWATER FACILITY TOP AND BOTTOM PERIMETERS AND OTHER FEATURES, OUTFALL STRUCTURE DETAILS, ETC. AND OTHER LOCATIONS WHERE FIELD
CONDITIONS DO NOT MATCH THE CONTRACT DOCUMENTS.
17. ADDITIONAL AS-BUILT INFORMATION MAY BE REQUIRED DURING CONSTRUCTION INSTALLATIONS AT CRITICAL AREAS. THIS INCLUDES BUT IS NOT LIMITED TO PIPE CROSSINGS OF WATER MAINS WITH LESS THAN 18 INCHES OF CLEARANCE OR WHEN PARALLEL UTILITIES WITH WATER MAINS HAVE LESS THAN 10 FEET OF CLEARANCE.
WARRANTIES
1. IF NOT SPECIFICALLY INDICATED IN THE CONTRACT DOCUMENTS, ALL IMPROVEMENTS SHALL BE WARRANTED BY
THE CONTRACTOR TO THE OWNER FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE BY THE OWNER. THIS WARRANTEE WILL ALSO EXTEND TO THE MAINTENANCE ENTITY OF ANY OTHER IMPROVEMENTS INCLUDING ROADS, SIDEWALKS, UTILITIES, STORM PIPING, ETC. OR TO THE EXTENT REQUIRED BY THEIR APPLICABLE DESIGN
STANDARDS.
GENERAL LEGEND - SEE PLANS FOR ADDITIONAL CALLOUTS
EXISTING CABLE
EXISTING COMMUNICATIONS
EXISTING ELECTRIC OVERHEAD
EXISTING ELECTRIC UNDERGROUND
EXISTING FIBER OPTIC
EXISTING FIRE
EXISTING FORCEMAIN
EXISTING GAS
EXISTING RECLAIMED WATER
EXISTING STORM
EXISTING TELEPHONE
EXISTING WATER
PROPOSED CABLE
PROPOSED COMMUNICATIONS
PROPOSED ELECTRIC OVERHEAD
PROPOSED ELECTRIC UNDERGROUND
PROPOSED FIBER OPTIC
PROPOSED FIRE
PROPOSED FORCEMAIN
PROPOSED GAS
PROPOSED RECLAIMED WATER
PROPOSED STORM
PROPOSED TELEPHONE
PROPOSED WATER
EXISTING ELEVATION CONTOUR
PROPOSED ELEVATION CONTOUR
SWALE CENTERLINE
PROPOSED GRADE SPOT ELEVATION
SILT FENCE
TREE BARRICADE
SETBACK
BUFFER
PROPERTY BOUNDARY
EXISTING FENCE
CABLECABLE
COMCOM
OHEOHE
UGEUGE
FIBERFIBER
FIREFIRE
FMFM
GASGAS
RCWRCW
STORMSTORM
TELTEL
WMWM
CABLECABLE
COMCOM
OHEOHE
UGEUGE
FIBERFIBER
FIREFIRE
FMFM
GASGAS
RCWRCW
STORMSTORM
TELTEL
WWWW
SILTSILT
TREETREE
99.99
STANDARD
ABBREVIATIONS
ADJ ADJACENT
ALUM ALUMINUM
APT APARTMENT
ASPH ASPHALT
B&J BORE & JACK
BLDG BUILDING
BM BENCHMARK
BOC BACK OF CURB
BOW BOTTOM OF WALL
BSL BUILDING SETBACK LINE
C&G CURB & GUTTER
C1 CURVE ONE
CATV CABLE TELEVISION
CEC CLAY ELECTRIC COOPERATIVE
CF CUBIC FEET
Cl CAST IRON
CIP CAST-IN-PLACE
CL CENTER LINE
CLF CHAIN LINK FENCE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
C/O CLEAN OUT
COMM COMMUNICATIONS
CONC CONCRETE
CY CUBIC YARD
DBI DITCH BOTTOM INLET
DDCBP DOUBLE DETECTOR CHECK BACKFLOW
PREVENTER
DEG DEGREES
DHWL DESIGN HIGH WATER LEVEL
DI DUCTILE IRON
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
E EAST
EL ELEVATION
ELEC ELECTRIC
EOP EDGE OF PAVEMENT
ERCP ELLIPTICAL REINFORCED CONCRETE PIPE
ESMT EASEMENT
EX EXISTING
FOC FACE OF CURB
FDC FIRE DEPARTMENT CONNECTION
FFE FINISH FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FIRE LINE
FM FORCE MAIN
FO FIBER OPTIC
FP FLOOD PLAIN
FT FEET
FUT FUTURE
GALV GALVANIZED
GV GATE VALVE
HC HANDICAP
HORIZ HORIZONTAL
HR HOUR
INV INVERT
LF LINEAR FEET
L1 LINE ONE
LAT LATITUDE
LONG LONGITUDE
LT LEFT
MAINT MAINTENANCE
MAX MAXIMUM
MES MITERED END SECTION
MH MANHOLE
MIN MINIMUM
MO MONTH
MUTCD MANUAL ON UNIFORM TRAFFIC DESIGN
N NORTH
N/A NOT APPLICABLE
NE NORTH EAST
NG NATURAL GRADE
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
NW NORTH WEST
OC ON CENTER
PE PROFESSIONAL ENGINEER
POB POINT OF BEGINNING
POE POINT OF ENDING
PL PROPERTY LINE
PRI PRIMARY
PRM PERMANENT REFERENCE MARKER
PSI POUNDS PER SQUARE INCH
PUE PUBLIC UTILITY EASEMENT
PUD PLANNED URBAN DEVELOPMENT
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
RCP REINFORCED CONCRETE PIPE
REF REFERENCE
ROW RIGHT OF WAY
RPZBP REDUCED PRESSURE ZONE BACKFLOW
PREVENTER
RT RIGHT
S SOUTH
S/W SIDEWALK
SE SOUTH EAST
SF SQUARE FEET
SG SWITCH GEAR
SPC SPACE
SS SANITARY SEWER
ST STORM SEWER
STCO STORM CLEANOUT (TYP ROOF DRAINS)
STA STATION
STD STANDARD
STL STEEL
SW SOUTH WEST
SY SQUARE YARD
TBRC TRAFFIC BEARING RING & COVER
TEL TELEPHONE
TX TRANSFORMER
TV TELEVISION
TOW TOP OF WALL
TYP TYPICAL
UTIL UTILITY
VCP VITRIFIED CLAY PIPE
VEH VEHICLE
W WEST
W/ WITIH
W/WW WATER / WASTEWATER
WM WATER MAIN
WS WATER SERVICE
WW WASTEWATER
YR YEAR
STORMWATER POLLUTION PREVENTION PLAN
THE FOLLOWING STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS PREPARED IN CONFORMANCE WITH FDOT DESIGN MANUAL CHAPTER 320 AND THE FOLLOWING NARRATIVE CONTAINS REFERENCES TO THE FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, THE FDOT DESIGN STANDARDS, AND OTHER SHEETS OF THESE CONSTRUCTION PLANS. THE FIRST SHEET OF THE CONSTRUCTION PLANS (C-000 COVER & SHEET INDEX) REFERENCES ALL THE OTHER COMPONENTS OF THE SWPPP. A COMPLETE STORMWATER POLLUTION PREVENTION PLAN INCLUDES SEVERAL ITEMS: THIS NARRATIVE DESCRIPTION, THE DOCUMENTS REFERENCED IN THIS NARRATIVE, THE CONTRACTOR'S APPROVED EROSION AND SEDIMENTATION CONTROL PLAN REQUIRED BY FDOT SPECIFICATION SECTION 104, AND REPORTS OF INSPECTIONS MADE DURING CONSTRUCTION.
1. SITE DESCRIPTION:
1.A. NATURE OF CONSTRUCTION ACTIVITY: PAVING AND UTILITY INSTALLATIONS
1.B. SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES:
IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A DETAILED SEQUENCE OF CONSTRUCTION FOR ALL CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF MAJOR ACTIVITIES DESCRIBED BELOW, UNLESS THE CONTRACTOR PROPOSES A DIFFERENT SEQUENCE THAT IS EQUAL OR BETTER AT CONTROLLING EROSION AND TRAPPING SEDIMENT AND IS
APPROVED BY THE ENGINEER.
1.B.1. INSTALL PERIMETER CONTROLS AND TREE PROTECTION BARRIERS BEFORE BEGINNING OTHER WORK FOR THE CONSTRUCTION PHASE.
THESE MAY ONLY BE REMOVED AFTER ALL UPSTREAM AREAS ARE STABILIZED.
1.B.2. CLEARING AND GRUBBING, EARTHWORK, FOR CLEARING THE DISTURBED AREA
1.B.3. UTILITY CONSTRUCTION
1.B.4. EARTHWORK ASSOCIATED WITH THE CONSTRUCTION OF SUBGRADE, BASE, PAVEMENT, AND CONCRETE
1.C. AREA ESTIMATES:
TOTAL PROPERTY AREA: 2 ACRES
TOTAL ESTIMATED AREA TO BE DISTURBED: .5 ACRES
TOTAL WETLAND AREA: 0 ACRES
TOTAL DISTURBED WETLAND AREA: 0 ACRES
1.D. RUNOFF DATA:
PRE-DEVELOPMENT RUNOFF COEFFICIENT: 0.30
POST-DEVELOPMENT RUNOFF COEFFICIENT: 0.30
1.E. OUTFALL INFORMATION: NOT APPLICABLE
1.F. SITE MAP: THESE CONSTRUCTION PLANS SERVE AS THE SITE MAPS FOR THE PROJECT. THE LOCATION OF THE REQUIRED INFORMATION IS
DESCRIBED BELOW. THE SHEET NUMBERS FOR THE PLAN SHEETS REFERENCED ARE IDENTIFIED ON C-000 COVER & SHEET INDEX OF THESE
CONSTRUCTION PLANS.
1.F.1. DRAINAGE PATTERNS: SEE THE GRADING PLANS FOR DRAINAGE BASIN DIVIDES AND FLOW DIRECTIONS 1.F.2. APPROXIMATE SLOPES: SEE THE GRADING PLANS FOR EXISTING AND PROPOSED SLOPES OF THE SITE 1.F.3. AREAS OF SOIL DISTURBANCE: SEE THE EROSION AND SEDIMENTATION CONTROL PLANS FOR THE AREAS TO BE DISTURBED - ANY
AREAS WHERE PERMANENT FEATURES ARE SHOWN TO BE CONSTRUCTED ABOVE OR BELOW GROUND WILL BE DISTURBED 1.F.4. AREAS NOT TO BE DISTURBED: SEE THE EROSION AND SEDIMENTATION CONTROL PLANS AND TREE PROTECTION PLANS FOR THE
AREAS TO BE PROTECTED
1.F.5. LOCATIONS OF TEMPORARY CONTROLS: SEE THE EROSION AND SEDIMENTATION CONTROL PLANS 1.F.6. LOCATIONS OF PERMANENT CONTROLS: SEE THE STORMWATER MANAGEMENT FACILITY CROSS SECTIONS AND THE LANDSCAPE PLANS 1.F.7. AREAS TO BE STABILIZED: ALL DISTURBED AREAS MUST BE STABILIZED WITH PERMANENT CONTROLS 1.F.8. SURFACE WATERS: NO SURFACE WATER EXIST ON THE SITE OR DIRECTLY ADJACENT TO THE SITE
1.F.9. DISCHARGE POINTS TO SURFACE WATERS: NONE ARE PROPOSED
1.G. RECEIVING WATERS: NOT APPLICABLE
2. CONTROLS:
2.A. EROSION AND SEDIMENT CONTROLS:
THE SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES LISTED ABOVE AND AS SHOWN IN THE EROSION AND SEDIMENTATION CONTROL PLAN IS BASED ON GENERAL PRACTICES OF SITE CONSTRUCTION. THE CONTRACTOR IS EXPECTED TO ADJUST AND MODIFY THE EROSION AND SEDIMENTATION CONTROL PLAN BASED ON THE ACTUAL PLANNED SEQUENCE OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO MODIFY THE PLAN TO ADAPT TO SEASONAL VARIATIONS, CHANGES IN CONSTRUCTION ACTIVITIES, AND THE NEED FOR BETTER PRACTICES.
2.B. STABILIZATION PRACTICES:
THE CONTRACTOR SHALL DESCRIBE THE STABILIZATION PRACTICES PROPOSED TO CONTROL EROSION. THE CONTRACTOR SHALL INITIATE ALL STABILIZATION MEASURES AS SOON AS PRACTICAL, BUT IN NO CASE MORE THAN THE REQUIREMENTS OF THE PERMITTING AGENCIES.
FOR THE FDEP GENERIC PERMIT FOR CONSTRUCTION ACTIVITIES, THE MINIMUM IS 7 DAYS AFTER CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. UNLESS OTHERWISE APPROVED BY AN ENGINEER, THE STABILIZATION PRACTICES SHALL
INCLUDE AT LEAST THE FOLLOWING:
2.B.1. TEMPORARY:
ARTIFICIAL COVERINGS lN ACCORDANCE WITH SPECIFICATION SECTION 104
TURF AND SOD IN ACCORDANCE WITH SPECIFICATION SECTION 104
2.B.2. PERMANENT:
ASPHALT OR CONCRETE SURFACE AS SHOWN IN THE CONSTRUCTION PLANS
TREES, SHRUBS, SOD, GRAVEL, ETC. AS SHOWN IN THE LANDSCAPE PLANS
SOD AT A MINIMUM IN ACCORDANCE WITH SPECIFICATION SECTION 570 FOR ALL OTHER DISTURBED AREAS SEED AND MULCH THAT HAS BEEN ESTABLISHED PRIOR TO REMOVAL OF TEMPORARY EROSION CONTROL DEVICES
2.C. STRUCTURAL PRACTICES:
THE CONTRACTOR SHALL DESCRIBE IN THE EROSION AND SEDIMENTATION CONTROL PLAN THE PROPOSED STRUCTURAL PRACTICES TO CONTROL OR TRAP SEDIMENT AND OTHERWISE PREVENT THE DISCHARGE OF POLLUTANTS FROM EXPOSED AREAS OF THE SITE. SEDIMENT CONTROLS SHALL BE IN PLACE BEFORE DISTURBING SOIL UPSTREAM OF THE CONTROL. UNLESS OTHERWISE APPROVED BY THE ENGINEER, THE STRUCTURAL PRACTICES SHALL INCLUDE AT LEAST THE FOLLOWING:
2.C.1. TEMPORARY:
SEDIMENT BARRIERS IN ACCORDANCE WITH DESIGN SPECIFICATION SECTION 104 AND FDEP EROSION AND SEDIMENT CONTROL
DESIGNER AND REVIEWER MANUAL
INLET PROTECTION IN ACCORDANCE WITH FDEP EROSION AND SEDIMENT CONTROL DESIGNER AND REVIEWER MANUAL, AND SPECIAL
DETAILS SHOWN CONSTRUCTION PLANS
SEDIMENT CONTAINMENT SYSTEM: THE PERMANENT STORMWATER MANAGEMENT FACILITIES CAN TEMPORARILY SERVE IN THIS CAPACITY DURING CONSTRUCTION - FINAL GRADING AND PERMANENT STABILIZING OF STORMWATER MANAGEMENT FACILITIES (SMF)
SHALL WAIT UNTIL THE COMPLETION OF ALL OTHER MAJOR SOIL DISTURBING ACTIVITIES
2.C.2. PERMANENT:
ENERGY DISSIPATION DEVICES AS SHOWN IN THE CONSTRUCTION PLANS
CONCRETE LINED DITCHES AND CONCRETE FLUMES AS SHOWN THE THE CONSTRUCTION PLANS
2.D. STORMWATER MANAGEMENT:
PROPOSED STORMWATER CONVEYANCE SYSTEMS (E.G. PIPES, DITCHES, SWALES, FLUMES) ARE CONSTRUCTED TO CONVEY RUNOFF TO THE PROPOSED STORMWATER MANAGEMENT FACILITIES. THE FACILITIES HAVE BEEN PERMITTED WITH THE ASSOCIATED WATER MANAGEMENT DISTRICT, THE LOCAL PERMITTING AGENCIES, AND THE FDOT OR PUBLIC WORKS DEPARTMENT AS APPLICABLE. THE SYSTEMS COMPLY WITH THE APPLICABLE DESIGN STANDARDS OF THESE PERMITTING AGENCIES.
2.E. OTHER CONTROLS: THE CONTRACTOR SHALL DESCRIBE IN THE EROSION AND SEDIMENTATION CONTROL PLAN THE PROPOSED METHODS
FOR EACH ACTIVITY LISTED BELOW
2.E.1. WASTE DISPOSAL: METHODS TO PREVENT THE DISCHARGE OF SOLID WASTE AND BUILDING MATERIALS OFF-SITE. UNLESS OTHERWISE APPROVED BY AN ENGINEER, THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING: 1) PROVIDING LITTER CONTROL AND COLLECTION WITHIN THE PROJECT DURING CONSTRUCTION ACTIVITIES, 2) DISPOSING OF ALL FERTILIZER OR OTHER CHEMICAL CONTAINERS ACCORDING TD EPA'S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER, 3) DISPOSING OF SOLID MATERIALS INCLUDING BUILDING AND CONSTRUCTION MATERIALS OFF THE PROJECT SITE BUT NOT IN SURFACE WATERS, OR WETLANDS.
2.E.2. OFF-SITE VEHICLE TRACKING & DUST CONTROL: UNLESS OTHERWISE APPROVED BY AN ENGINEER, THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING: 1) COVERING LOADED HAUL TRUCKS WITH TARPAULINS, 2) REMOVING EXCESS DIRT FROM ROADS DAILY, 3) STABILIZING CONSTRUCTION ENTRANCES ACCORDING TO THE FDEP EROSION AND SEDIMENT CONTROL DESIGNER AND REVIEWER MANUAL, 4) USING ROADWAY SWEEPERS DURING DUST GENERATING ACTIVITIES SUCH AS EXCAVATION AND MILLING
OPERATIONS.
2.E.3. STATE AND LOCAL REGULATIONS FOR WASTE DISPOSAL, SANITARY SEWER, OR SEPTIC TANK REGULATIONS 2.E.4. FERTILIZERS AND PESTICIDES: COMPLY WITH APPLICABLE SUBSECTIONS OF SECTION 982 OF THE FDOT SPECIFICATIONS 2.E.5. TOXIC SUBSTANCES: PROVIDE A LIST OF TOXIC SUBSTANCES THAT ARE LIKELY TO BE USED ON THE JOB AND PROVIDE A PLAN
ADDRESSING THE GENERATION, APPLICATION, MIGRATION, STORAGE, AND DISPOSAL OF THESE SUBSTANCES 2.E.6. APPROVED STATE AND LOCAL PLANS AND PERMITS: ANY ACTIVITIES REQUIRING SPECIAL CONSIDERATION IN THE APPLICATION
REVIEWING AGENCY PERMITS
3. MAINTENANCE: THE CONTRACTOR SHALL LIST THE MAINTENANCE REQUIREMENTS, SCHEDULES, INDICATORS IN THE EROSION AND
SEDIMENTATION CONTROL PLAN THAT WILL BE IMPLEMENTED THROUGHOUT CONSTRUCTION. THE MAINTENANCE SHALL AT A MINIMUM, COMPLY
WITH THE FOLLOWING:
3.A. SILT FENCE: MAINTAIN PER SPECIFICATION SECTION 104. THE CONTRACTOR SHOULD ANTICIPATE REPLACING SILT FENCE ON 12 MONTH
INTERVALS
3.B. SEDIMENT BARRIERS : REMOVE SEDIMENT AS PER MANUFACTURER'S RECOMMENDATIONS OR WHEN WATER PONDS IN UNACCEPTABLE
AMOUNTS OR AREAS
3.C. STORMWATER MANAGEMENT FACILITIES: THE SMF ARE INTENDED TO SERVE AS TEMPORARY SEDIMENT BASINS UNTIL THE AREAS THAT DRAIN TO THEM ARE STABILIZED. UNTIL THAT TIME, THE CONTRACTOR SHALL REMOVE SEDIMENT FROM THE SMF WHEN IT BECOMES 18" DEEP AT ANY POINT OR LIMITS THE ABILITY OR THE VOLUME CAPACITY OF THE SMF HAS BEEN REDUCED BY 25%, WHICHEVER COMES FIRST.
4. INSPECTIONS: QUALIFIED PERSONNEL SHALL INSPECT THE FOLLOWING ITEMS AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.50 INCHES OR GREATER. TO COMPLY, THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL. WHERE SITES HAVE BEEN PERMANENTLY STABILIZED, INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH. THE CONTRACTOR SHALL ALSO INSPECT THAT CONTROLS INSTALLED IN THE FIELD AGREE WITH THE LATEST STORMWATER
POLLUTION PREVENTION PLAN.
4.A. POINTS OF DISCHARGE TO WATERS OF THE UNITED STATES
4.B. POINTS OF DISCHARGE TO MUNICIPAL SEPARATE STORM DRAIN SYSTEMS
4.C. DISTURBED AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED
4.D. AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION
4.E. STRUCTURAL CONTROLS
4.F. STORMWATER MANAGEMENT FACILITIES AND CONVEYANCE SYSTEMS
4.G. LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE
THE CONTRACTOR SHALL INITIATE REPAIRS WITHIN 24 HOURS OF INSPECTIONS THAT INDICATE ITEMS ARE NOT IN GOOD WORKING ORDER. IF INSPECTIONS INDICATE THAT THE INSTALLED STABILIZATION AND STRUCTURAL PRACTICES ARE NOT SUFFICIENT TO MINIMIZE EROSION, RETAIN SEDIMENT, AND PREVENT DISCHARGING POLLUTANTS, THE CONTRACTOR SHALL PROVIDE ADDITIONAL MEASURES, AS APPROVED BY AN
ENGINEER.
5. NON-STORMWATER DISCHARGES: IN THE FDOT SPECIFICATION SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL IDENTIFY ALL ANTICIPATED NON-STORMWATER DISCHARGES (EXCEPT FLOWS FROM FIRE FIGHTING ACTIVITIES). THE CONTRACTOR SHALL DESCRIBE THE PROPOSED MEASURES TO PREVENT POLLUTION OF THESE NON-STORMWATER DISCHARGES. IF THE CONTRACTOR ENCOUNTERS CONTAMINATED SOIL OR GROUNDWATER, CONTACT THE LOCAL ENVIRONMENTAL PROTECTION DEPARTMENT.
W M
W M
WM
WM
WM
WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
WM
WM
W M
W M
WM
WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
WM
WM
WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
WMWM
W M
WMWM
W M
W M
W M
W M
W M
W M
W M
W M
W M
WMWM
W M
WMWMWMWM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
WMWM
WMWMWMWMWMWMWMWMWMWMWMWMWM
WM
SAWCUT & REMOVE
EXIST ASPHALT
SAWCUT & REMOVE
EXIST CONCRETE
EXIST CURB TO
BE REMOVED
FUEL TANK FILL STATION - CONTROL PANEL AND
ASSOCIATED PIPING / CONDUIT TO BE REMOVED - FUEL TANK
OVERFLOW ALARM TO BE RELOCATED TO THE FACE OF THE
EXISTING BUILDING AS SHOWN ON SHEETS AS101 AND ES101
SAWCUT EXISTING PAVEMENT
AT THE PROPOSED CURB LINE
EXISTING UNDERGROUND
FUEL TANKS TO REMAIN
Feet 0 20 40
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2023-10-26 gmuereng.com
(352) 281-4928
2603 NW 13th ST, Box 314
Gainesville, FL 32609
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
INSTALL ALTERNATE CONNECTIONS
FOR STEAM AND CHILLED WATER
ORLANDO, FL
675-22-17
Project Director
10-26-2023REVISIONS: DATE: CAG ABG
Fi le
: 2 3-
-C -0
D
EM
O
.D W
G
LA
ST
S
AV
ED
: 2
3-
-2
:0 3:
A
M
PL
O
T
SC
AL
E
: 1 :1
P
LO
TT
ED
: 2
3-
-2
:0 3:
A
M
U
SE
R : C hr is
G
SHEET 0F 032 SHEETS
590 MEANS ST NW
STE. 200
ATLANTA, GA 30318
DEMOLITION AND EROSION CONTROL PLAN
C-050
LAUREATE BLVD
C
EN
TE
R
LI
N
E D
R
IV
E
AutoCAD SHX Text
12"WATER POTABLE
AutoCAD SHX Text
12"WATER FIRE
AutoCAD SHX Text
12" POTABLE
AutoCAD SHX Text
6" FIRE
AutoCAD SHX Text
12"WATER POTABLE
AutoCAD SHX Text
12"WATER FIRE
AutoCAD SHX Text
12"WATER POTABLE
AutoCAD SHX Text
12"WATER FIRE
9.8'
11.48' 16.74'
10.78'
16.08'
49.76'
MATCH EXISTING
PAVEMENT GRADE
NEW 6" CURB , SEE DETAIL 3
TIE INTO
EXISTING
6" CURB
42.91'12'
36.83'6.12'
R91.4'
MATCH EX
SIDEWALK
GRADE
10'
MATCH EXISTING
SIDEWALK GRADE
.05
240.03'
MATCH EXISTING
PAVEMENT GRADE
MATCH EXISTING
PAVEMENT GRADE
PROPOSED 12" HEAVY DUTY CONCRETE
EQUIPMENT PAD - DETAIL 2 SHOWN FOR
QUANTITY PURPOSES - FINAL SPECIFICATION
FOR PAD CONSTRUCTION AND REINFORCEMENT
TO BE DETERMINED FROM EQUIPMENT VENDOR
NEW ASPHALT, SEE DETIAL 1 (TYP)
R
R
R30'
R30'
R30
R30
R 30'
.6
6'
CONDUIT DUCT BANK - SEE
SHEET ES101 FOR DETAILS
CONCRETE PAD FOR NEMA
DISCONNECTS - SIZE SHOWN IS
ASSUMED AND MUST BE VERIFIED
AGAINST FINAL EQUIPMENT SIZE
AND MOUNTING - SEE SHEET
ES101 & E604 FOR DETAILS
3'
Feet 0 20 40
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2023-10-26 gmuereng.com
(352) 281-4928
2603 NW 13th ST, Box 314
Gainesville, FL 32609
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
INSTALL ALTERNATE CONNECTIONS
FOR STEAM AND CHILLED WATER
ORLANDO, FL
675-22-17
Project Director
10-26-2023REVISIONS: DATE: CAG ABG
Fi le
: 2 3-
-C -1
S
IT
E.
D W
G
LA
ST
S
AV
ED
: 2
3-
-2
:0 2:
A
M
PL
O
T
SC
AL
E
: 1 :1
P
LO
TT
ED
: 2
3-
-2
:0 3:
A
M
U
SE
R : C hr is
G
SHEET 0F 032 SHEETS
590 MEANS ST NW
STE. 200
ATLANTA, GA 30318
SITE PLAN
C-100
6" CURB - DETAIL 3
NOT TO SCALE
6"
CHAMFER (TYP)
6"
CLASS I
3,000 PSI
CONCRETE
PAVEMENT
MIN 8" LIMEROCK BASE
COMPACTION 98%
AASHTO T-180
MIN 12" STABILIZED TYPE B
SUBGRADE, MIN LBR 40
COMPACTION 98% AASHTO T-180
PROOF ROLLED FILL
2.5" SP9.5 ASPHALT
PAVEMENT
PAVEMENT DESIGN - DETAIL 1
NOT TO SCALE
PROPOSED CONCRETE
EQUIPMENT PAD - DETAIL 2
NOT TO SCALE
12" CONCRETE
FDOT JPCP 5,000 PSI
WITH WWF
MIN 12" STABILIZED TYPE B
SUBGRADE, MIN LBR 40
COMPACTION 98% AASHTO T-180
SAWCUT OR TOOLED CONTRACTION JOINT
LAUREATE BLVD
C
EN
TE
R
LI
N
E D
R
IV
E
FINAL SPECIFICATION FOR PAD CONSTRUCTION, THICKNESS,
REINFORCEMENT, ETC. TO BE DETERMINED FROM
EQUIPMENT VENDOR SPECIFICATIONS
W
W M
WM
WM
WM
WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
WM
WM
W M
W M
WM
WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
WM
WM
WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
WMWM
W M
WMWM
W M
W M
W M
W M
W M
W M
W M
W M
W M
WMWM
W M
WMWMWMWM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
WMWM
WMWMWMWMWMWMWMWMWMWMWMWMWM
WM
85.60 85.80
85.40 85.60
85.20 85.40
85.80
86.00
85.75
85.65
85.20 85.40
85.80 86.00
86.50 86.70
86.90 87.10
85.09
84.73
85.12
85.40
86.00
85.80
86.00
86.20
86.40
86.20
86.30 86.65
86.99
85.8085.80
85.7085.70
85.70 85.60
85.50
85.70
85.70
85.5085.50
85.70 85.50
85.30
85.30
85.10
Feet 0 20 40
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2023-10-26 gmuereng.com
(352) 281-4928
2603 NW 13th ST, Box 314
Gainesville, FL 32609
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
INSTALL ALTERNATE CONNECTIONS
FOR STEAM AND CHILLED WATER
ORLANDO, FL
675-22-17
Project Director
10-26-2023REVISIONS: DATE: CAG ABG
Fi le
: 2 3-
-C -2
G
R
AD
IN
G
.D W
G
LA
ST
S
AV
ED
: 2
3-
-2
:0 2:
A
M
PL
O
T
SC
AL
E
: 1 :1
P
LO
TT
ED
: 2
3-
-2
:0 3:
A
M
U
SE
R : C hr is
G
SHEET 0F 032 SHEETS
590 MEANS ST NW
STE. 200
ATLANTA, GA 30318
GRADING, DRAINAGE, & UTILITY PLAN
C-200
LAUREATE BLVD
C
EN
TE
R
LI
N
E D
R
IV
E
AutoCAD SHX Text
12"WATER POTABLE
AutoCAD SHX Text
12"WATER FIRE
AutoCAD SHX Text
12" POTABLE
AutoCAD SHX Text
6" FIRE
AutoCAD SHX Text
12"WATER POTABLE
AutoCAD SHX Text
12"WATER FIRE
AutoCAD SHX Text
12"WATER POTABLE
AutoCAD SHX Text
12"WATER FIRE
6 5
DD
SL
E-CH-6
(FUTURE)
CF
E-ET-3
(FUTURE)
D N
D N
DEMOLISH
EXISTING CURB
REMOVE FUEL FILL STATION
AND ASSOCIATED POWER.
RELOCATE OVERFILL ALARM -
SEE CIVIL DRAWING C-050
DEMOLISH EXISTING
ASPHALT PAVING -
SEE CIVIL DRAWING C-050EXISTING INLET TO
REMAIN, TYP
DEMOLISH EXISTING CONCRETE
PAVING - SEE CIVIL DRAWING C-050
REMOVE PARKING
SPACES - SEE CIVIL
EXISTING FUEL
TANKS TO REMAIN
EXISTING GAS METER
PAD TO REMAIN
EXISTING
CONCRETE PAD
TO REMAIN
EXISTING
SERVICE
VEHICLE
DRIVE
N
C
D
PP
G2
H
W
E
G1
KEY PLAN
N.T.S.
H
BUILDING 7
TRUE
NORTH
PLAN
NORTH
0' 16' 32' 64' 96'
SCALE: 1/32" = 1'-0"
DEMO PLAN LEGEND
EXISTING CONSTRUCTION
TO REMAIN
EXISTING CONSTRUCTION
TO BE DEMOLISHED
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
JLH SJ/SM
INSTALL ALTERNATE CONNECTIONS FOR
STEAM AND CHILLED WATER
675-22-17
ORLANDO, FL
10-26-2023REVISIONS: SHEET 0F 032 SHEETS
ARCHIECTURAL SITE DEMO PLAN
ASD101
1/32" = 1'-0"ASD101
1 ARCHITECTURAL SITE PLAN _DEMO
DD
SL
E-CH-6
(FUTURE)
CF
E-ET-3
(FUTURE)
D N
D N
N
C
D
PP
G2
H
W
E
G1
KEY PLAN
N.T.S.
H
BUILDING 7
TRUE
NORTH
PLAN
NORTH
CONCRETE TEMPORARY
TRAILER PAD - SEE CIVIL
DRAWING C-100
EXISTING INLET TO
REMAIN, TYP
EXISTING FUEL
TANKS TO REMAIN
ASPHALT PAVING
EXTENSION - SEE CIVIL
DRAWING C-100
EXISTING GAS
METER PAD TO
REMAIN
EXISTING
CONCRETE PAD
TO REMAIN
EXISTING
SERVICE
VEHICLE
DRIVE
ASPHALT PAVING -
SEE CIVIL
PIPE SUPPORTS -
SEE STRUCTURAL
FUTURE TEMPORARY
TRAILER, TYP
10'-0"W x 4'-0"D x 6'-0"H W 11 GA TYPE 316
STAINLESS STEEL, WEATHERTIGHT VALVE
ENCLOSURE WITH PASSIVE VENTILATION AND
REMOVABLE, LOCKABLE DOORS ON CONCRETE
PAD. BASIS OF DESIGN: T&G CONTROLS, INC.
CONTACT: TERRY KNYFF. PHONE: 770-921-6565.
EMAIL: TKNYFF@TGCONTROLS.COM.
10'-0"W x 4'-0"D x 6'-0"H W 11 GA TYPE 316 STAINLESS STEEL, WEATHERTIGHT VALVE ENCLOSURE WITH PASSIVE VENTILATION
AND REMOVABLE, LOCKABLE DOORS ON CONCRETE PAD. BASIS
OF DESIGN: T&G CONTROLS, INC. CONTACT: TERRY KNYFF.
PHONE: 770-921-6565. EMAIL: TKNYFF@TGCONTROLS.COM.
RELOCATED WALL MOUNTED
FUEL TANK ALARM PANEL
JUNCTION BOXES - SEE
ELECTRICAL DRAWING E601
TRANSFORMER PAD - SEE
ELECTRICAL DRAWING E101
0' 16' 32' 64' 96'
SCALE: 1/32" = 1'-0"
PLAN LEGEND
EXISTING CONSTRUCTION
TO REMAIN
NEW CONSTRUCTION
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
JLH SJ/SM
INSTALL ALTERNATE CONNECTIONS FOR
STEAM AND CHILLED WATER
675-22-17
ORLANDO, FL
10-26-2023REVISIONS: SHEET 0F 032 SHEETS
ARCHIECTURAL SITE PLAN
AS101
1/32" = 1'-0"AS101
1 ARCHITECTURAL SITE PLAN
DESIGN CODES
1.01 2021 INTERNATIONAL BUILDING CODE (IBC) AS MODIFIED BY:
A. ANSI/ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
1.02 AMERICAN CONCRETE INSTITUTE (ACI)
A. ACI 318-19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
1.03 AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
B. ANSI/AISC 360-16, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS
DESIGN LOADS
1.01 DESIGN LOADS ARE AS FOLLOWS:
1. DEAD LOADS: 210 PLF
2. SNOW LOADS: GROUND SNOW LOAD
a. GROUND SNOW LOAD Pg = 0 PSF
b. SNOW EXPOSURE FACTOR Ce = 0.9
c. SNOW LOAD IMPORTANCE FACTOR I = 1.0
d. THERMAL FACTOR Cf = 1.0
3. RAIN LOADS: N/A NOT APPLICABLE
4. WIND LOADS:
a. ULTIMATE WIND SPEED Vult = 149 MPH
b. NOMINAL WIND SPEED = 115.4 MPH
c. RISK CATEGORY = IV
d. IMPORTANCE FACTOR lw = 1.00
e. EXPOSURE CATEGORY = B
5. SEISMIC LOADS
a. RISK CATEGORY = IV
b. SITE CLASS = D
c. SEISMIC IMPORTANCE FACTOR = 1.00
d. MAPPED SPECTRAL RESPONSE ACCELERATIONS:
1) Ss = 0.06
2) S1 = 0.033
e. SPECTRAL RESPONSE COEFFICIENTS:
1) SDS = 0.064
2) SD1 = 0.052
f. SITE COEFFICIENTS:
1) Fa = 1.6
2) Fv = 2.4
g. SEISMIC CATEGORY = A
GENERAL STRUCTURAL NOTES
1.01 ELEVATIONS AS SHOWN ON THE STRUCTURAL DRAWINGS ARE ELEVATIONS RELATIVE TO THE EXISTING
TOP OF FOOTING.
1.02 WHERE A DETAIL, TYPICAL DETAIL, SECTION, TYPICAL SECTION OR NOTE IS SHOWN FOR ONE CONDITION, IT SHALL APPLY FOR ALL SIMILAR OR LIKE CONDITIONS UNLESS OTHERWISE NOTED.
1.03 THE STRUCTURAL DESIGN OF THE STRUCTURE, IS BASED ON THE FULL INTERACTION OF ALL ITS COMPONENT PARTS, WITH NO PROVISION MADE FOR CONDITIONS OCCURRING DURING CONSTRUCTION.
THEREFORE, CONTRACTOR SHALL PROVIDE ADEQUATE BRACING AND TEMPORARY SHORING DURING
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE STANDARDS.
1.04 CONTRACTOR IS RESPONSIBLE FOR ALL JOB SITE SAFETY INCLUDING THE SAFE RIGGING, LIFTING, BRACING AND SETTING OF MATERIALS AND EQUIPMENT IN ACCORDANCE WITH APPLICABLE STANDARDS.
1.05 FURNISH AND INSTALL ALL NECESSARY ATTACHMENTS, ANCHORAGES AND ACCESSORIES TO PROVIDE A
COMPLETE STRUCTURALLY SOUND STRUCTURE WITH A CONTINUOUS LOAD PATH. BRING ANY
DISCONTINUITIES TO THE ATTENTION OF THE STRUCTURAL ENGINEER IMMEDIATELY.
1.06 FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF FABRICATION OR CONSTRUCTION.
BRING ANY DISCREPANCIES ALONG WITH DETAILED FIELD SKETCHES OF AS-BUILT CONDITIONS TO THE
ATTENTION OF THE STRUCTURAL ENGINEER IMMEDIATELY.
1.07 COORDINATE AND VERIFY ALL DIMENSIONS AND DETAILS WITH THE EXISTING, CIVIL, PROCESS, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, SHOP AND
SUBMITTAL DRAWINGS. NOTIFY THE COR IMMEDIATELY OF ANY DISCREPANCIES
SHOP DRAWINGS
1.01 STRUCTURAL DRAWINGS INDICATE TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY. SHOP DRAWINGS SHALL DETAIL ALL CONDITIONS IN ACCORDANCE WITH SPECIFIED STANDARDS AND THE SPECIFIC
REQUIREMENTS OF THIS PROJECT AS INDICATED ON THE DRAWINGS.
1.02 PHOTOCOPY REPRODUCTIONS OF THE CONTRACT DOCUMENTS WILL BE REJECTED AND CONTRACTOR WILL BE RESPONSIBLE FOR ANY ASSOCIATED DELAYS. STRUCTURAL DRAWINGS INDICATE TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY. SHOP DRAWINGS SHALL DETAIL ALL CONDITIONS IN ACCORDANCE WITH SPECIFIED STANDARDS AND THE SPECIFIC REQUIREMENTS OF THIS PROJECT AS INDICATED ON THE DRAWINGS. THE PURPOSE OF SHOP DRAWINGS IS TO VERIFY THAT THE CONTRACTOR HAS INTERPRETED THE INTENT OF THE CONSTRUCTION DOCUMENTS CORRECTLY, DETAIL ALL CONDITIONS, INDEPENDENTLY CHECK, CONFIRM AND COORDINATE ALL DIMENSIONS AND DETAILS, TAKE FIELD MEASUREMENTS, VERIFY FIELD CONDITIONS, FUNCTIONALITY AND CONSTRUCTABILITY AS WELL AS COORDINATE WITH OTHER TRADES AND ACTUAL PRODUCTS PURCHASED. THE CONTRACT DRAWINGS ARE NOT INTENDED FOR THIS PURPOSE AND TRANSLATION OF ELECTRONIC MEDIA MAY NOT BE ACCURATE. THE USE OF PHOTOCOPY REPRODUCTIONS DEFEATS THE PURPOSE OF SHOP DRAWINGS AND DOING SO IS ENTIRELY AT THE
CONTRACTORS OWN RISK.
1.03 SUBMITTALS FOR DELEGATED DESIGNED COMPONENTS SHALL BE ACCOMPANIED BY DRAWINGS AND CALCULATIONS SEALED BY A STRUCTURAL ENGINEER REGISTERED IN THE STATE OF THE PROJECT. IN ADDITION, THESE SHOP DRAWINGS AND CALCULATIONS SHALL BE PREPARED UNDER THE DIRECT
SUPERVISION OF THE STRUCTURAL ENGINEER SEALING THIS WORK.
1.04 COMPONENTS OR SYSTEMS REQUIRING SPECIALTY STRUCTURAL ENGINEER DELEGATED DESIGN:
A) STRUCTURAL STEEL CONNECTIONS WHERE IDENTIFIED ON THE DRAWINGS OR IN SPECIFICATIONS.
B) PIPING SUPPORTS INCLUDING ANY SUPPLEMENTAL FRAMING REQUIRED TO FACILITATE A
CONTINUOUS LOAD PATH TO THE PRIMARY STRUCTURE.
C) TEMPORARY SHORING.
1.05 A COPY OF THE APPROVED, SIGNED AND SEALED DOCUMENTS SHALL BE SUBMITTED TO THE BUILDING AUTHORITY FOR REVIEW AND BE AVAILABLE AT THE JOB SITE DURING INSPECTION AS REQUIRED.
1.06 COMPLETE SHOP DRAWINGS FOR CONSTRUCTION OF EACH STRUCTURE COMPONENT NOT DESIGNED BY THE DESIGN TEAM-OF-RECORD AND NOT SPECIFIED ON THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .