Attachment 2 Draft XLWU 21-1013 SOW Renovate and Addition B950.docx
DOCX document 70 KB Posted
- Attached to
- Renovate HVAC for B950 Phase 1
- Solicitation number
- FA4819HVACRENOVATION
About this file
This document is a Draft Statement of Work (SOW) for the Tyndall Air Force Base (TAFB) project XLWU 21-1013, Phase 1 to renovate the first phase of the HVAC system for Building 950. The SOW outlines the scope of work for this design-build project, which includes replacing AHU-1, 2, and 3 and large ductwork, installing a new Siemens control panel, UPS, and surge suppression, and performing related controls work. The project will be completed in multiple phases, with Phase 1 focusing on the immediate HVAC repairs. Key requirements include providing phasing plans, temporary cooling, and tying the new controls into the Desigo front-end system. The contractor will also be responsible for demolition, recycling, testing, balancing, and smoke testing the HVAC system. The previous 65% design package will be provided as a reference, and the contractor will be required to submit 95% and 100% design packages. The SOW also includes details on environmental requirements, inspections, and additional contract documents.
The associated federal contract opportunity is a sources sought notice for small businesses (including SDBs, HUBZone, 8(a), SDVOSB, and WOSB) to identify capable sources for this HVAC renovation contract at Tyndall AFB. The Air Force's 325th Fighter Wing is looking for potential contractors to perform the work outlined in the SOW.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1- Sources Sought Notice.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX - A
DESCRIPTION OF WORK
For
REQUEST FOR PROPOSAL
Renovate/Addition B950 Phase 1
TYNDALL AFB FLORIDA
Project Number: XLWU 21-1013
XLWU 21-1013, Phase 1 Appendix - A 29 Aug 2024
Contents
| 1.0 | SCOPE | 4 |
| 1.1 | Purpose | 4 |
| 1.2 | General: | 5 |
| 1.3 | Other Requirements: | 6 |
| 1.3.1 | Inspections | 6 |
| 1.3.2 | Options | 7 |
| 2.0 | Summary of Work | 9 |
| 2.1 | Work Task | 10 |
| 2.1.1 | Task 1.0 Sitework – Phase 4 | 10 |
| 1.0 | Specific Work and Utilities - None | 10 |
| 2.0 | Architectural – None | 10 |
| 3.0 | Electrical – None | 10 |
| 4.0 | Mechanical – None | 10 |
| 2.1.2 | Task 2.0 Building 950 and Addition Roofing – Phase 4 and 5 | 10 |
| 1.0 | Specific Work and Utilities - None | 10 |
| 2.0 | Architectural – None | 10 |
| 3.0 | Electrical – None | 10 |
| 4.0 | Mechanical – None | 10 |
| 2.1.3 | Task 3.0 Building 950 Renovation – Multiple Phases | 10 |
| 1.0 | Specific Work and Utilities | 10 |
| 2.0 | Architectural | 10 |
| 3.0 | Electrical | 11 |
| 4.0 | Mechanical | 11 |
| 2.1.4 | Task 4.0 Building 950 HVAC and Controls – Multiple Phases | 12 |
| 1.0 | Specific Work and Utilities | 12 |
| 2.0 | Architectural | 12 |
| 3.0 | Electrical | 12 |
| 4.0 | Mechanical | 12 |
| 2.1.5 | Task 5.0 Building 950 and Addition Fire Alarm and Mass Notification System (MNS). - Multiple Phases | 15 |
| 1.0 | Specific Work and Utilities | 15 |
| 2.0 | Architectural | 15 |
| 3.0 | Electrical | 15 |
| 2.1.6 | Task 6.0 Building 950 and Addition Fire Suppression – Phase 4 | 16 |
| 1.0 | Specific Work and Utilities - None | 16 |
| 2.0 | Architectural – None | 16 |
| 3.0 | Electrical – None | 16 |
| 4.0 | Mechanical – None | 16 |
| 2.1.7 | Task 7.0 Building 950 Addition – Phase 4 | 16 |
| 1.0 | Specific Work and Utilities - None | 16 |
| 2.0 | Architectural – None | 16 |
| 3.0 | Electrical – None | 16 |
| 4.0 | Mechanical – None | 16 |
| 2.1.8 | Task 8.0 Building 950 MCC replacement – Phase 2 | 16 |
| 1.0 | Specific Work and Utilities - None | 16 |
| 2.0 | Architectural – None | 16 |
| 3.0 | Electrical – None | 16 |
| 4.0 | Mechanical – None | 16 |
| 2.2 | O&M Manuals and drawings (Project Closeout Clarification) | 16 |
| Attachments: | 17 | |
| Appendix B | Additional Requirements | 17 |
| Appendix C | Maps, Drawings, and Other Project Specifics | 17 |
| Appendix D | Example Schedule (Contains all deliverables including task items from Appendix A) | 17 |
| Appendix E | AF 66 Schedule, 3064 and 3065 Template | 17 |
| Appendix F | Facility Related Control Systems | 17 |
| Appendix G | FRCS Deliverable Checklist | 17 |
| Appendix H | Approved Master FRCS Acronyms List | 17 |
| Appendix I | FRCS HVAC Points Example | 17 |
| Appendix J | FRCS Energy Dashboard Example | 17 |
| Appendix K | FRCS Fire Points Example | 17 |
| Appendix L | FRCS Fire Graphic Examples | 17 |
| Appendix M | Environmental Protection Plan Guidance | 17 |
1.0 SCOPE
1.1 Purpose
A. The purpose of the Tyndall Air Force Base (TAFB) project XLWU 21-1013, Phase 1, Renovate first phase of HVAC for B950 that is in immediate need of repair. This phase encompasses the AHU-1, 2, and 3 and the large duct work replacement to support the other phases. A new Siemens panel, UPS and surge suppression will be required. Siemen’s controls will be required for the new equipment and any new duct sensors. Section Summary of Work 2.0 has a detailed breakdown of the work scope.
B. The Design documents and drawing files from XLWU 21-1013D will be provided to the contractor to use as the 65% design documents. The provided 65% design is for use in the development of the 95% design for completion of the project.
C. This task order delivery method is Design-Build (D-B). Work on supporting facilities includes external building fixtures, building utilities within the Points of Demarcation (POD) for privatized utilities, and work within the Administration / Office Building. The Contractor shall be responsible for providing all labor, equipment, tools, materials, and services necessary to complete the project within the allotted timeframe.
D. Implementation of work will not start until an approved 100% Design has been issued. Ordering of long lead items may be coordinated with CO.
E. See Appendix M for Environmental Protection Plan Guidance (EPP)
1.2 General:
A. Field Changes: The Contractor and the Government may agree to perform at no cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated items. All field changes must be approved by the CO prior to execution. Only the CO may authorize field changes or deviations from the SOW.
B. Ancillary Task: The tasks in this scope of work do not describe all the ancillary tasks required to complete the task. The contractor is required to complete all ancillary tasks to meet codes and standards that results in a complete and useable facility. Any task omissions by the contractor in their proposal will be the responsibility of the contractor.
C. Quantities and Measurements: All quantities, square footage, linear footage, etc. are estimated to assist contractor in determining scale and scope of this project. Contractor is responsible to verifying and calculating his own quantities for his proposal and estimates do not relieve contractor from providing required quantities and cost to successfully complete project. For example, measurements for drywall and painting are a square footage for the room versus the actual wall square footage. Contractor shall provide all calculations, and quantities for government review/approval.
D. Provide a draft and final 95% Design and a draft and final 100% Design. Additionally provide the deliverables contained in the SOW Table and verbiage contained in the SOW document.
E. The existing building portion is being brought up to ADA or ABA standards.
F. Appendix C has pictures, and some available drawings.
G. Provide a detailed schedule with WBS tasks in a spreadsheet format for bid proposal and after award. An example spreadsheet will be provided as part of this package. Each task will have a dollar value for the tasks. A start and end date are required for each task. All deliverables shall be included in the schedule. Use Appendix D, example schedule to provide this breakdown. A 3064 is not considered the schedule. Appendix E, AF 66 Schedules 3064 and 3065 Template is an example reporting tool like a 3064/3065.
H. The building will be occupied during construction and the mission must not be impacted. The project work shall be phased with the user to ensure continued mission operation.
I. For Siemens supplied work, electrical interfaces, conduit lengths and paths are the responsibility of the prime contractor to determine during site inspections.
J. Use Appendix G FRCS Guide Deliverable Checklist in the development of the controls system. It is a detailed document with most of the details for the control systems requirements. This was developed from Appendix F, Facility Related Control Systems.
K. Use Appendix H Approved Master FRCS Acronyms List for use on the drawings for mechanical, electrical, and controls.
L. Use Appendix H Approved Master FRCS Acronyms List for the development of points for HVAC, Fire Alarm and Energy.
M. See Appendix I FRCS HVAC Points Example for examples of required HVAC points.
N. See Appendix J FRCS Energy Dashboard Example for examples of required Energy Graphics.
O. See Appendix K FRCS Fire Points Example for examples of required Fire Alarm points.
P. See Appendix L FRCS Fire Graphics Example for examples of required Fire Alarm Graphics.
1.3 Other Requirements:
A. Refer to the Appendix B for additional requirements.
B. Appendix I, FRCS Deliverables Checklist has additional requirement that shall be met. The required information has been checked in the document.
C. Select the Applicable stages listed below that are required.
| |X| | Design Build |
| |X| | 95% Design |
| |X| | 100% Design |
| 1.3.1 | Inspections |
The Contractor shall advise the Government 48 hours before performing any concrete pouring, backfilling, wall covering or test operation that will encase or cover his work. For soil compaction tests, a minimum of 72 hours notification shall be required. Coordinate with SFS for after- hours concrete delivery.
1.3.2 Options
See tasks 1.0 through 8.0 in Appendix A and B for further requirements.
1.3.2.1 Phase 1:
· Individual Task items provide additional clarifications.
· Replace all major large duct work in coordinates MD101A and MD101D
· Replace LVR-1, IDU-1, IDU-2, AHU-1,2,3 and ERU-1
· Install new Siemens main panel
· Install VAVs 1 - 7, 24, 26,27,28,29,30
· Perform all related controls work for this phase
1.3.2.2 Phase 2:
· Individual Task items provide additional clarifications.
· Replace MCC board and electrical components associated with board.
· Install submetering for the Food service and equipment loads on the MCC board.
· Tie information into the Siemens Desigo EMCS system to be displayed on the energy graphics
1.3.2.3 Phase 3:
· Individual Task items provide additional clarifications.
· Replace all duct work inside the BX sales area and tie to the new large ductwork replaced in Phase 1
· Install new Siemens sub panel as needed to support phase 3
· Install VAVs 21, 22, 23, and 25
· Perform all related controls work for this phase
1.3.2.4 Phase 4:
· Individual Task items provide additional clarifications.
· Construct new addition to support phase 5.
· Install AHU-4, 5, FLRD, RFD, and ERU-2
· Replace all other equipment not replaced in the other phases. Chillers, Pumps, Cooling Tower, Boiler, ERU, Air Separators, Expansion Tanks, EHDs, EF, IDUs, etc.
· Install new Siemens sub-panels as needed to support phase 4 and 5
· Install any VAVs missed or added as required by design
· Perform all related controls work for this phase
1.3.2.5 Phase 5:
· Individual Task items provide additional clarifications.
· Replace all duct work inside the food services, thrift shop, old pharmacy area and small retail shops and tie to any ductwork replaced in the other phases as required by design.
· Install new Siemens sub-panel as needed to support phase 5
· Replace LVR, IDUs not replaced in other phases.
· Install VAVs 8-20 as required by design
· Perform all related controls work for this phase.
· Provide final points and graphics for the HVAC, Fire, and energy dashboard.
· Ensure metering from Phase 2 is functioning for the various areas.
2.0 Summary of Work
A. Project XLWU211013D, Design Only for B950 was a Design Only contract for upgrade of HVAC, Controls and Fire Alarm. This also included a new addition design to include a HVAC mechanical room to house AHUs located on mezzanine area and for the restaurants. The five phases will complete this work. We are focusing on the drawing MD10 between top section of MD101A and MD101D. A markup will be provided.
B. A 100% design package that includes drawings and specifications has already been completed for this project and is considered a 65% package for this project XLWU211013D. This design package is to be used as a reference and starting point for this Design-Build project. A 95% and 100% design submittal will be required in the scope of this project. The purpose of the design submittals is to capture and reflect necessary requirement or end user changes to the previously completed design.
C. Geotechnical surveys for the building foundation are included in this contract. Slurry boring may require hazardous material to be hauled off site by the contractor.
D. Key elements of Phase 1 of the project but not limited to the following:
a. Refer to Appendix B for additional requirements.
b. Providing Phasing plan
c. Providing temporary cooling
d. Upgrading the HVAC, Controls and Fire Alarm for phase 1.
e. Test, Balance, smoke test HVAC.
f. Tie controls into Desigo Front end
g. Provide points and graphics for HVAC and Energy.
h. Demo old equipment and recycle metals and HVAC at recycle center.
| 2.1 | Work Task |
| 2.1.1 | Task 1.0 Sitework – Phase 4 |
| 1.0 | Specific Work and Utilities - None |
| 2.0 | Architectural – None |
| 3.0 | Electrical – None |
| 4.0 | Mechanical – None |
| 2.1.2 | Task 2.0 Building 950 and Addition Roofing – Phase 4 and 5 |
| 1.0 | Specific Work and Utilities - None |
| 2.0 | Architectural – None |
| 3.0 | Electrical – None |
| 4.0 | Mechanical – None |
| 2.1.3 | Task 3.0 Building 950 Renovation – Multiple Phases |
A. Refer to the provided design for a detailed scope of work. This is a simplified list of items.
1.0 Specific Work and Utilities
A. Surveys for asbestos, mold and lead paint should be conducted prior demolition or rehabilitation.
B. Remediation of any asbestos, mold and lead paint is the responsibility of the prime contractor.
2.0 Architectural
2.1 General Building Ceiling
2.1.1 Interface with facility manager and provide safety barrier around affected area.
2.1.2 Coordinate work with section 2.2
2.1.3 Demo affected ceiling grid and tile to facilitate duct replacement, VAV installation, and controls as required by design.
2.1.4 Demo any ceiling drywall to facilitate duct replacement.
2.1.5 Coordinate with mechanical, HVAC, electrical and communications, etc.
2.1.6 Install ceiling drywall.
2.1.7 Prep, and finish ceiling.
2.1.8 Install existing ceiling grid and ceiling tiles.
2.2 Interior Floor Space
2.2.1 Interface with facility manager and provide safety barrier around affected area.
2.2.2 Provide a phasing plan for moving shelving and merchandise.
2.2.3 Provide cover for shelving and merchandise adjacent to work area.
2.3 Flooring
2.3.1 Clean all existing flooring affected by the design.
2.3.2 Wax/buff all affected flooring that require treatment of flooring in this manner affected by the design.
2.3.3 Replace any damaged flooring
3.0 Electrical
3.1 Miscellaneous Electrical
3.1.1 Support Siemens in running any conduit and or wiring to support the HVAC, Controls and Fire Alarm replacement.
3.1.2 Install all required electrical not listed above.
4.0 Mechanical
4.1 Plumbing
| 4.1.1 | Demo any affected HVAC drains |
| 4.1.2 | Install any required HVAC drains. |
4.2 Miscellaneous Mechanical
| 4.2.1 | Demo any mechanical required by design. |
| 4.2.2 | Install any required mechanical as required by design. |
| 2.1.4 | Task 4.0 Building 950 HVAC and Controls – Multiple Phases |
A. Refer to the provided design for a detailed scope of work. This is a simplified list of items. Not all items will be required for this phase.
1.0 Specific Work and Utilities
1.1 Surveys for asbestos, mold and lead paint should be conducted prior demolition or rehabilitation.
1.1 Remediation of any asbestos, mold and lead paint is the responsibility of the prime contractor.
2.0 Architectural
2.1 Provide supports for equipment and ductwork.
3.0 Electrical
3.1. Schedule an Electrical Outage for the installation of electrical.
3.2. Run required power and controls for HVAC and other components.
3.3. Install submetering for all equipment loads as delineated in Appendix I, FRCS Deliverables Checklist.
4.0 Mechanical
4.1 FRCS plus is not being installed. Do NOT install monitored lighting controls, hydronics and leak detection, occupancy counters, gunshot detection or Kiosks. Wireless controllers are not allowed. The cybersecurity CIA rating is Mission Support, and the MAC rating is Incidental, thus any modifications must meet those ratings.
4.2 Control and design drawings shall use the approved base acronym list for equipment acronyms and point names provided by DOR.
4.3 Demo and install all new HVAC system designed that has been verified with calculations for the existing and new edition.
4.4 Label all circuits and wiring per base requirements.
4.5 Recycle existing HVAC components at the recycle center.
4.6 Install all new supply and return air ductwork.
4.7 Install all new Outside, exhaust and return air control damper actuators furnished, installed, and wired by Siemens.
4.8 Install VFD and Mixed Air Damper for AHUs are furnished and wired by Siemens
4.9 Duct Sensors and reheat field installed and wired by Siemens.
4.9.1 Install Duct supply air temperature sensors.
4.9.2 Install Individual Area temperature sensors
4.9.3 Demo existing VAVs and replace any VAVs to provide reheat for the new and old portion of the building.
4.9.4 Install Reheat
4.10 Design and Install Dedicated Outside Air System (DOAS) separate from the existing ductwork per current code.
4.11 Install humidity control on the building supply.
4.12 Replace HVAC Controls and Install Siemens HVAC control panel.
4.13 Provide 3rd party certification of HVAC system.
4.14 Provide a points schedule and list to include but not limited to: See Appendix I, FRCS Deliverables Checklist for additional points required. All the existing points and graphics will be upgraded to the new base standard.
4.14.1 Supply air temperature
4.14.2 Supply air pressure
4.14.3 Mixed air temperature
4.14.4 Return air temperature
4.14.5 DX Comp
4.14.6 Outside air temperature and RH (global)
4.14.7 Filter differential pressure
4.14.8 Outside air damper
4.14.9 Return air damper
4.14.10 Supply fan VFD speed
4.14.11 Supply fan VFD on-off control
4.14.12 Supply fan VFD status
4.14.13 Supply fan VFD fault
4.15 Provide new and modify EMCS graphics on Siemens Desigo server to meet current base standards.
4.16 Provide Energy Graphics to meet new base standard. This will include but not limited to the following Chillers, pumps, AHUs, fans, boilers, etc.
a. Volts
b. Virtual point for volts monthly average
c. Amps
d. Virtual point for amps monthly average
e. Frequency
f. Power
g. Virtual point for power monthly total usage
h. Virtual point for power yearly total usage
i. Virtual point for power year 2 total usage
j. Virtual point for power year 3 total usage
4.17 HVAC requirements Controls
4.17.1 Tie in HVAC controls to EMCS.
4.17.2 Provide new base standard points and graphics for new and old portion of the building.
4.17.3 Test points and graphics, locally, at front end and with the MOSA system.
4.18 Building surge suppression for the main board and Siemens Panels
4.18.1 Install (1) or more panel surge protection
4.18.2 Install (1) or more panel UPS battery backup
4.19 If installed, abandon pneumatic controls in place. The end state must be capped, neat and not be unsightly.
4.20 Test and balance and provide a smoke test of all ventilation.
4.21 Provide 11 by 17 laminated controls drawings.
| 2.1.5 | Task 5.0 Building 950 and Addition Fire Alarm and Mass Notification System (MNS). - Multiple Phases |
| A. | Refer to the provided design for a detailed scope of work. This is a simplified list of items. |
| 1.0 | Specific Work and Utilities |
1.1 None.
2.0 Architectural
2.1 Provide supports for fire alarm and MNS equipment.
3.0 Electrical
3.1 The cybersecurity CIA rating is Mission Support, and the MAC rating is Incidental, thus any modifications must meet those ratings. All Fire Protection alarm, detection, and suppression is L-M-M. The balance of the systems is L-L-L.
3.2 Tie new equipment sensors into the existing Fire Alarm system.
3.3 Label all circuits and wiring per base requirements.
3.4 Test Fire Alarm and MNS via local controls.
3.5 Provide 3rd party certification of Fire Alarm system.
3.6 Provide 11 by 17 laminated controls drawings.
3.7 Provide programming hard copies and backup disks.
| 2.1.6 | Task 6.0 Building 950 and Addition Fire Suppression – Phase 4 |
| 1.0 | Specific Work and Utilities - None |
| 2.0 | Architectural – None |
| 3.0 | Electrical – None |
| 4.0 | Mechanical – None |
| 2.1.7 | Task 7.0 Building 950 Addition – Phase 4 |
| 1.0 | Specific Work and Utilities - None |
| 2.0 | Architectural – None |
| 3.0 | Electrical – None |
| 4.0 | Mechanical – None |
| 2.1.8 | Task 8.0 Building 950 MCC replacement – Phase 2 |
| 1.0 | Specific Work and Utilities - None |
| 2.0 | Architectural – None |
| 3.0 | Electrical – None |
| 4.0 | Mechanical – None |
| 2.2 | O&M Manuals and drawings (Project Closeout Clarification) |
A. Provide (2) hard copies of vendor manuals.
B. Provide (2) Electronic copies of vendor manuals.
C. Provide (2) hard copies of signed and sealed drawings.
D. Provide (2) Electronic copies of signed and sealed drawings.
Attachments:
| Appendix B | Additional Requirements |
| Appendix C | Maps, Drawings, and Other Project Specifics |
| Appendix D | Example Schedule (Contains all deliverables including task items from Appendix A) |
| Appendix E | AF 66 Schedule, 3064 and 3065 Template |
| Appendix F | Facility Related Control Systems |
| Appendix G | FRCS Deliverable Checklist |
| Appendix H | Approved Master FRCS Acronyms List |
| Appendix I | FRCS HVAC Points Example |
| Appendix J | FRCS Energy Dashboard Example |
| Appendix K | FRCS Fire Points Example |
| Appendix L | FRCS Fire Graphic Examples |
| Appendix M | Environmental Protection Plan Guidance |
END OF DOCUMENT
File details come from the government source that posted it. Updated .