USCGC HEALY (WAGB 20)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2023
Developed By: LT Matthew Bogdan
(Draft-0, 8 October 2021)
ATTACHMENT 2
USCGC HEALY (WAGB-420) DRYDOCK AVAILABILITY FY2023
ii (Draft-0)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ............................................................................... xiv Consolidated List of Critical Inspection Items ........................................................................................... xvi Principal Characteristics .......................................................................................................................... xviii General Requirements
Independent NACE Inspector (Level 3), Provide Hull Plating (U/W Body & Freeboard), Ultrasonic Testing Hull Plating (U/W Body), Inspect U/W Body, Preserve “100%” Hull Plating Freeboard, Preserve “100%” Tanks (Ballast), Clean and Inspect Tanks (Ballast), Preserve “100%” Transducer Well Deck, Preserve Voids (Non-Accessible), Leak Test
Propulsion Shafts, Alignment Check Propulsion Shaft Bearings (External), Check Clearances Propulsion Shaft Seals (Inflatable), Clean and Inspect Propulsion Shaft Bulkhead Seals, Annual Maintenance Fuel Oil Purifier (FOP) Overhaul Lube Oil Purifier (LOP) Overhaul Fathometer Transducer, General Maintenance Recapitalize SRD-500/600 Doppler Speed Log System Multibeam EM-124, Replace Boiler, Annual Maintenance Rudders, Remove, Inspect and Reinstall Anchor Chain(s) and Ground Tackle, Inspect and Repair Impressed Current Cathodic Protection System Anodes and Reference Cells, Inspection and Anode Renewal A-Frames, Annual Inspection Port & Starboard Miranda Davit, Annual Inspect and Repair 04 Deck Crane (Port) TB 100-55, Annual Inspect and Test 04 Deck Crane (Starboard) TB 100-55, Annual Inspect and Test Aft Crane (Port), Annual Inspect and Repair Aft Crane (Starboard), Inspect and Test Bow Crane, Annual Inspect and Test Oceanographic Winch, Inspect and Test Trawl / Core Winch, Inspect and Test Drydock Service, Temporary Fuel Off-Load Drydock Temporary Services, Provide - Cutter Sea Trial Performance, Support, Provide Flex Hose Assemblies, Renew Damage Control and Firefighting Systems, PMS Internal Hoists, Level 1 Inspect and Test Automatic Main Seawater Strainer, Renew Hull Penetration Renewal Valves, Overhaul or Renew iii (Draft-0)
Sea Strainer, Duplex, Overhaul iv (Draft-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Draft-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 420 WAGB 085-001, Rev D, Docking Plan
Coast Guard Drawing 420 WAGB 085-001, Rev E, Docking Plan
Coast Guard Drawing 420 WAGB 085-002, Rev E, Tank Capacity Curves
Coast Guard Drawing 420 WAGB 101-02, Rev C, Construction Dwg Units 101 & 102
Coast Guard Drawing 420 WAGB 101-07, Rev B, Construction Dwg Unit 113 & 114
Coast Guard Drawing 420 WAGB 101-08, Rev C, Construction Dwg Units 121 & 122
Coast Guard Drawing 420 WAGB 101-09, Rev C, Construction Dwg Units 123-124
Coast Guard Drawing 420 WAGB 101-12, Rev B, Construction Dwg Units 131-132
Coast Guard Drawing 420 WAGB 101-13, Rev C, Construction Dwg Unit 133 & 134
Coast Guard Drawing 420 WAGB 101-15, Rev C, Construction Dwg Unit 141 & 142
Coast Guard Drawing 420 WAGB 101-19, Rev D, Construction Drawing Unit 250
Coast Guard Drawing 420 WAGB 101-19, Rev D, Construction Drawing Unit 250
Coast Guard Drawing 420 WAGB 101-20, Rev B, Construction Drawing Units 251-252
Coast Guard Drawing 420 WAGB 101-22, Rev C, Construction Drawings for Units 255 & 257
Coast Guard Drawing 420 WAGB 101-33, Rev B, Construction Drawing Units 430 & 431
Coast Guard Drawing 420 WAGB 101-47, Rev D, Construction Dwg Units 601-602
Coast Guard Drawing 420 WAGB 101-48, Rev D, Construction Dwg Units 603-604
Coast Guard Drawing 420 WAGB 101-61, Rev A, Midship Section
Coast Guard Drawing 420 WAGB 101-62, Rev B, Scantling Plan (Decks)
Coast Guard Drawing 420 WAGB 101-63, Rev B, Scantling Plan (Elev's & Section)
Coast Guard Drawing 420 WAGB 101-64, Rev B, Shell Expansion
Coast Guard Drawing 420 WAGB 101-64, Rev D, Shell Expansion
Coast Guard Drawing 420 WAGB 101-65, Rev C, Construction Dwg Unit 111 & 112
Coast Guard Drawing 420 WAGB 101-68, Rev C, Construction Drawing Units 432 & 433
Coast Guard Drawing 420 WAGB 161-03, Rev B, Rudder Horn
Coast Guard Drawing 420-WAGB 167-7, Rev ~, Structural Doors
Coast Guard Drawing 420-WAGB 167-528, Rev A, Polar Icebreaker Structural Door List
Coast Guard Drawing 420 WAGB 184-001, Rip-Out Iwo Kongsberg Em 122 Installation
Coast Guard Drawing 420 WAGB 184-002, Kongsberg Em 122 Xdcr Casting Installation Receive Unit vi (Draft-0)
Coast Guard Drawing 420 WAGB 184-002, Rev C, Kongsberg EM 122 XDCR Casing Installation Receive Unit
Coast Guard Drawing 420 WAGB 184-003, DS60 Doppler Shell Ring Installation
Coast Guard Drawing 420 WAGB 184-003, Kongsberg Em 122 Xdcr Casting Installation Transmit Unit
Coast Guard Drawing 420 WAGB 184-004, Arrangement & Fdns Em 122 Electronic Components And Cables
Coast Guard Drawing 420 WAGB 184-502, Rev _, Kongsberg Hull Mounted Transducer Window
Coast Guard Drawing 420 WAGB 186-001, Rev G, Mooring & Towing Details
Coast Guard Drawing 420 WAGB 243-1, Rev A, Shafting Arrangements
Coast Guard Drawing 420 WAGB 243-3, Rev C, Shafting Details
Coast Guard Drawing 420 WAGB 243-5, Rev C, Propulsion Shafting Alignment Analysis
Coast Guard Drawing 420 WAGB 243-6, Rev C, Propulsion Shafting Arrangement Procedures
Coast Guard Drawing 420 WAGB 243-7, Rev -, Propulsion Shafting Bearing Reaction Report
Coast Guard Drawing 420 WAGB 244-2, Rev C, Stern Tube Bearings and Seals Arrangement and Details
Coast Guard Drawing 420 WAGB 244-501, Rev G, Icebreaker Variant Seal
Coast Guard Drawing 420 WAGB 244-502, Rev C, Ga of 23.750 Type No Seal
Coast Guard Drawing 420 WAGB 244-507, Rev G, Stave Bearings, Water Lubricated Stern
Coast Guard Drawing 420 WAGB 244-508, Rev E, Assembly Drawing
Coast Guard Drawing 420 WAGB 256-001, Rev E, Main Seawater Circulation System
Coast Guard Drawing 420 WAGB 259-5, Rev B, Machinery Plant Exhaust Gas Piping A & D
Coast Guard Drawing 420 WAGB 304-001, Rev B, Typical Methods of Electrical Installations and Details
Coast Guard Drawing 420 WAGB 320-002, Power System One-Line Diagram
Coast Guard Drawing 420 WAGB 320-11, Rev J, SS Power System Connection Details
Coast Guard Drawing 420 WAGB 320-2, Rev-AN, Power System One Line Diagram
Coast Guard Drawing 420 WAGB 400-002, General Arrangement of Electrical Equipment-Pilothouse
Coast Guard Drawing 420 WAGB 405-001, Rev H, Genl Arr Of Antennas For Radio, Radar & Navigation Sys
Coast Guard Drawing 420 WAGB 410-001, General Arrangement of Electrical Equipment-Engineering Control Center
Coast Guard Drawing 420 WAGB 423-008, Integrated Bridge and Control Monitor System Block Wiring Diagram
Coast Guard Drawing 420 WAGB 423-011, 1SG38-CGECDIS(V)WAGB 420 Installation, Block Wiring Diagram, and Details
Coast Guard Drawing 420 WAGB 423-013, SPS-461 DGPS Installation, Block wiring Diagram, and Details
Coast Guard Drawing 420 WAGB 424-004, Rev J, Hull Mounted Transducers Installation Details
Coast Guard Drawing 420 WAGB 424-006, General Arrangement of Electrical Equipment, Transducer Well
Coast Guard Drawing 420 WAGB 424-008, Bottom Mapping Sonar System Blk Wrg Diag
Coast Guard Drawing 420 WAGB 424-013, Doppler Speed Log System Replacement Ripout, Installation, Arrangement, Wiring, and Details
Coast Guard Drawing 420 WAGB 424-014, Kongsberg Em-124 Installation Bwd & Details vii (Draft-0)
Coast Guard Drawing 420 WAGB 424-4, Rev G, Hull Mounted Transducer Installation Details
Coast Guard Drawing 420 WAGB 424-4, Rev K, Hull Mounted Transducers Installation Details
Coast Guard Drawing 420 WAGB 424-502, Rev -, Outline / Ice Hardened Sea Chest
Coast Guard Drawing 420 WAGB 424-6, Rev A, Gen Arrgt of Elec Equip Transducer Well
Coast Guard Drawing 420 WAGB 424-6, Rev D, General Arrangement of Elec Equipment – Transducer Well
Coast Guard Drawing 420 WAGB 426-004, Gyrocompass System and Indicator Circuit “LC” Elementary Wiring Diagram
Coast Guard Drawing 420 WAGB 426-009, SRD-600 Doppler Speed Log One-Line, Block Wiring Diagram, and Mechanical Installation Diagram
Coast Guard Drawing 420 WAGB 426-010, Gyrocompass System MK-39 and MK-27F Elementary Wiring Diagram and Details
Coast Guard Drawing 420 WAGB 430-001, General Arrangement of Electrical Equipment, IC Equipment Room
Coast Guard Drawing 420 WAGB 440-1, Rev T, General Arrangement of Elec Equipment _ Radio Room
Coast Guard Drawing 420 WAGB 505-001, Rev D, Piping General Notes and Installation Details
Coast Guard Drawing 420 WAGB 505-006, Rev K, PP-ARR Units: 103, 113, 123, 133, 143, 811, 821 & 831.
Coast Guard Drawing 420 WAGB 505-016, Rev B, PP ARR Unit 135 L/M
Coast Guard Drawing 420 WAGB 505-024, Rev T, PP ARR Units: 251, 252, 255 & 257
Coast Guard Drawing 420 WAGB 505-025, Rev B, PP ARR Units: 251, 252, 255 & 257 L/M
Coast Guard Drawing 420 WAGB 505-078, Rev H, PP ARR Unit 125
Coast Guard Drawing 420 WAGB 505-079, Rev B, PP ARR Unit 125 L/M
Coast Guard Drawing 420 WAGB 505-084, Rev J, PP ARR Unit 135
Coast Guard Drawing 420 WAGB 506-2, Rev D, Boiler Blow Overboard Discharge Relocation
Coast Guard Drawing 420 WAGB 508-001, Rev F, PP & MCHRY Insulation Schedule
Coast Guard Drawing 420 WAGB 508-002, Rev D, PP & MCHRY Insulation Schedule L/M
Coast Guard Drawing 420 WAGB 521-001, Rev E, Diagram Firemain System
Coast Guard Drawing 420 WAGB 524-001, Rev K, Diagram Auxiliary Seawater System
Coast Guard Drawing 420 WAGB 529-001, Rev C, Diagram Ballast, Main Drainage and Independent Drainage Systems
Coast Guard Drawing 420 WAGB 535-1, Rev J, Diagram Steam, Feed & Condensate System
Coast Guard Drawing 420 WAGB 551-20, Rev A, Start Air Cprsr Piping Modifications Jacketwater, Aux. Seawater Clg Air Disch & Drain Piping
Coast Guard Drawing 420 WAGB 551-5, Rev D, Diag - Starting Air System
Coast Guard Drawing 420 WAGB 562-1, Rev E, Rudders Units 021 & 022
Coast Guard Drawing 420 WAGB 562-2, Rev B, Rudder Support System
Coast Guard Drawing 420 WAGB 573-1, Rev B, Crane Pedestals Arr & Dets
Coast Guard Drawing 420 WAGB 573-2, Rev D, Boom Rests
Coast Guard Drawing 420 WAGB 573-3, Rev A, Science Hoist
Coast Guard Drawing 420 WAGB 573-511, Rev F, General Arrangement KB 15-45
Coast Guard Drawing 420 WAGB 573-522, Rev A, General Arrangement TB 100-55
Coast Guard Drawing 420 WAGB 573-545, Rev G, Aft. "A" Frame Base Weldment viii (Draft-0)
Coast Guard Drawing 420 WAGB 573-546, Rev D, Stbd "A" Frame Base Weldment
Coast Guard Drawing 420 WAGB 573-547, Rev -, Hydraulic Cylinder Aft a-Frame
Coast Guard Drawing 420 WAGB 573-548, Rev -, Hydraulic Cylinder Starboard a-Frame
Coast Guard Drawing 420 WAGB 573-558, Rev C, Aft. "A" Frame Stop Tube Weldment
Coast Guard Drawing 420 WAGB 573-559, Rev B, Side "A" Frame Stop Tube Weldment
Coast Guard Drawing 420 WAGB 581-001, Rev - , Anchor Handling Arrangements and Details
Coast Guard Drawing 420 WAGB 582-001, Rev E, Mooring & Towing Arrangement
Coast Guard Drawing 420 WAGB 583-001, Rev F, Artic Survey Boat (ASB) Stowage & Handling.
Coast Guard Drawing 420 WAGB 589-5, Rev B, Science Hoist Arrangement
Coast Guard Drawing 420 WAGB 589-506, Rev C, General Arrangement Trash Hoist
Coast Guard Drawing 420 WAGB 589-507, Rev E, General Arrangement 600Stores Hoist
Coast Guard Drawing 420 WAGB 591-501, Rev E, Winch Assembly Oceanographic
Coast Guard Drawing 420 WAGB 591-502, Rev E, Winch Assembly Traw/Core
Coast Guard Drawing 420 WAGB 631-001, Rev D, Paint Schedule & Corrosion Control
Coast Guard Drawing 420 WAGB 631-1, Rev D, Paint Schedule & Corrosion Control
Coast Guard Drawing 420 WAGB 631-1, Rev D, Paint Schedule & Corrosion Control
Coast Guard Drawing 420 WAGB 633-1, Rev -, Zinc Anodes
Coast Guard Drawing 420 WAGB 633-2, Rev B, Cathodic Protection System ISO & Elem Wrg Diag
Coast Guard Drawing 420 WAGB 635-001, Rev E, Insulation Layouts & Dets
Coast Guard Drawing 420 WAGB 635-1, Rev C, Insulation Layouts & Dets
Coast Guard Drawing 420 WAGB 665-11, Rev- , Radio Room Workbench, Coast Guard Drawing 420 WAGB 671-2, Rev D, CO2 Room
Coast Guard Drawing 420 WAGB 801-001, Rev K, Booklet of General Drawings
Coast Guard Drawing 420 WAGB 801-005, Rev B, Piping Material Schedule
Coast Guard Drawing 420 WAGB 801-1, Rev -, Booklet of General Drawings
Coast Guard Drawing 420 WAGB 801-9, Rev C, Tank Sounding Tables
Coast Guard Drawing 420 WAGB 85-1, Rev E, Docking Plan
Coast Guard Drawing 420 WAGB 85-2, Rev F, Tank Capacity Curves
Coast Guard Drawing 420 WAGB 97-3, Rev , Stability Test Report (Supercedes 420 WAGB 097 1)
Coast Guard Drawing 420 WAGB 97-3, Rev -, Stability Test Report (USCGC HEALY)
Coast Guard Drawing FL-1702-11, Sheave Inspection
Coast Guard Drawing FL-184-003, DS60 Doppler Shell Ring Installation
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINS) 10360.3 (series), Coatings and Color Manual
Coast Guard Commandant Instruction (COMDTINST) 16672.2D, Mar 1999, Navigation Rules, International-Inland
Coast Guard Commandant Instruction (COMDTINST) 9000.6 (series), Naval Engineering Manual
Coast Guard Commandant Instruction (COMDTINST) 9077.1 (series), Equipment Tag-Out Procedures
Coast Guard Technical Manual S9WAG-AV-SIB-010, Nov 2003, Hull and Mechanical Systems
Coast Guard Technical Publication (TP) 01-NOV-14, SG811-C5-MMC-010 - Crane, Primary Telescoping Boom Pedestal Type – Model 100-55 ix (Draft-0)
Coast Guard Technical Publication (TP) 10500, Doppler Sonar-Model DS-60
Coast Guard Technical Publication (TP) 5028, 01-NOV-03, S9243-BV-MMC-010 - Stern Tube Seal Assembly
Coast Guard Technical Publication (TP) 5028, S9243-BV-MMC-010 - Stern Tube Seal Assembly
Coast Guard Technical Publication (TP) 5029, S9243-BX-MMC-010 - Bulkhead Shaft Seal
Coast Guard Technical Publication (TP) 5053, 01-NOV-03, S6437-B6-MMC-010 – Strainer, 24” Self Cleaning
Coast Guard Technical Publication (TP) 5061, S9261-BE-MMC-010 - Purification System, Fuel Oil
Coast Guard Technical Publication (TP) 5068, S9264-A9-MMC-010 - Lube Oil Purification System, Coast Guard Technical Publication (TP) 5150 - S6161-U4-FSE-010-Grease Interceptor Hood with MGPC-4000-S-2 Control Cabinet
Coast Guard Technical Publication (TP) 5162, S9517-AY-MMC-010 - Boiler, Oil Fired Auxiliary
Coast Guard Technical Publication (TP) 5200, S6220-B4-MMC-010, Compressor, High Pressure Breathing Air, Model K15-E3
Coast Guard Technical Publication (TP) 5207, S9555-DM-MMC-010 - Fire Extinguishing System, High Pressure Carbon Dioxide
Coast Guard Technical Publication (TP) 5214, 01-NOV-03, SG700-AM-MMC-010 - Hydraulic Power Unit (HPU), Aft General Service
Coast Guard Technical Publication (TP) 5216, S9561-A9-MMC-010 - Hydraulic Steering System
Coast Guard Technical Publication (TP) 5217, S9561-D4-MMC-010 - Steering Gear, Electro-Hydraulic
Coast Guard Technical Publication (TP) 5218, S9242-AG-MMC-010 - Pilgrim Pintle Nut
Coast Guard Technical Publication (TP) 5219, S9243-BW-MMC-010 - Rudderstock Seal
Coast Guard Technical Publication (TP) 5221, 01-NOV-03, SG700-AP-MMC-010 - A-Frames
Coast Guard Technical Publication (TP) 5223, SWBS 572, Section A, Dumbwaiter (200 Lb Capacity) – Model 20700
Coast Guard Technical Publication (TP) 5243, Nov 2013, SG811-B4-MMC-010 – Crane, Electro- Hydraulic Telescoping Boom – Model TB60-65
Coast Guard Technical Publication (TP) 5249, SWBS 589, SG825-A3-MMC-010 - 1000 Lb Capacity Stores Hoist
Coast Guard Technical Publication (TP) 5250, SWBS 589, SG825-AY-MMC-010 - 6000 Lb Capacity Science Hoist
Coast Guard Technical Publication (TP) 5251, SWBS 589, SG825-AZ-MMC-010 - 600 Lb Capacity Trash Hoist
Coast Guard Technical Publication (TP) 5262, SWBS 591, May 2020, Science Winch, Mechanical System & Wire Handling (Volume 1)
Coast Guard Technical Publication (TP) 5263, SWBS 591, Nov 2003, Science Winch, Mechanical System & Wire Handling (Volume 2)
Coast Guard Technical Publication (TP) 5264, SWBS 591, Nov 2003, Science Winch, Mechanical System & Wire Handling (Volume 3)
Coast Guard Technical Publication (TP) 5274, 01-NOV-03, S9633-Ag-MMC-010 - Impressed Current Cathodic Protection System
Coast Guard Technical Publication (TP) 5274, S9633-AG-MMC-010 - Impressed Current Cathodic Protection System
Coast Guard Technical Publication (TP) 5336, 06-NOV-07, The Cranesmart "LMI" System x (Draft-0)
Coast Guard Technical Publication (TP) 5340, Sauer WP 400 Air Compressor
Coast Guard Technical Publication (TP) 5359, Boiler Water Management System – Model Aquaman 300
Coast Guard Technical Publication (TP) 5360, Speed Log Model Naviknot SRD-500 (420’ WAGB Only)
Coast Guard Technical Publication (TP) 5502 - Fire Suppression System Model WHDR
Coast Guard Technical Publication (TP) 7120, 21-MAR-11, Duplex Strainer 3/4" Thru 8" - Model 50
Coast Guard Technical Publication (TP) E-424-021, May 2008, EM 122 Multi Beam Echo Sounder
Coast Guard Technical Standard (TS) 505-2, Hoses and Expansion Joints
Coast Guard Technical Standard (TS) 551, Compressed Air Systems, Appendix A, Start Air System
Coast Guard Technical Standard (TS) 583-2, Shipboard Boat Hoisting Systems
Coast Guard Technical Standard (TS) 589, Cranes
Coast Guard Technical Standard (TS) 591, Rev -, Oceanographic Research Equipment
Maintenance Procedure Card A-Q-7253 Boiler Feed Water Test
Maintenance Procedure Card M-A-10661 Boiler Automated Safety Control Service
Maintenance Procedure Card M-A-13039 Boiler Safety Valve Test/Check
Maintenance Procedure Card M-A-7209 Boiler Relief Valves Check
Maintenance Procedure Card M-A-7210 Boiler Inspection and Cleaning
Maintenance Procedure Card M-A-7225 Inspect and Change Boiler Compressor Air Filters, L/O and F/O Filters.
Maintenance Procedure Card R-A-13058 Portable Stored Pressure Purple K Powder (PKP) Fire Extinguisher Inspect
Maintenance Procedure Card R-A-1562 1-1/2 Through 2-1/2 Inch Fire Hose Test
Maintenance Procedure Card R-A-1568 AFFF Hose Reel Insp/Lube
Maintenance Procedure Card R-A-1570 Weigh CO2 Cylinder, Test Delay and Cables
Maintenance Procedure Card R-C-11069 Self Contained Breathing Apparatus (SCBA) Cylinder Repair
Maintenance Procedure Card R-C-11748 15LB Portable CO2 Fire Extinguisher Parts Replace
Maintenance Procedure Card R-C-1600 Renew or Hydro Test CO2 Hose
Maintenance Procedure Card R-C-1604 AFFF Fire Extinguisher Service
Maintenance Procedure Card R-C-8747 Self Contained Breathing Apparatus (SCBA) Cylinder Inspect
Maintenance Procedure Card R-C-8750 Self Contained Breathing Apparatus (SCBA) Cylinder Hydrostatic Test
Maintenance Procedure Card R-M-10671 AFFF Fire Extinguisher Check
Maintenance Procedure Card R-M-12950 Kiddie WHDR Aqueous Potassium Carbonate (APC) System Check
Maintenance Procedure Card R-M-1605 Fire station Equipment Inspect
Maintenance Procedure Card R-M-1606 15LB Portable CO2 Fire Extinguisher Inspect
Maintenance Procedure Card R-Q-11988 Self Contained Breathing Apparatus (SCBA) Cylinder Inspect/Clean
Maintenance Procedure Card R-Q-1634 Fixed CO2 Visual Inspection
Maintenance Procedure Card R-S-10672 AFFF Fire Extinguisher Inspect
Maintenance Procedure Card R-S-12949 Kiddie WHDR Aqueous Potassium Carbonate (APC) System Semi-Annual Service
Maintenance Procedure Card R-S-1643 15LB Portable CO2 Fire Extinguisher Weigh
Maintenance Procedure Card R-S-1646 Inspect Fixed CO2 System and Alarms xi (Draft-0)
Maintenance Procedure Card R-W-8531 Self Contained Breathing Apparatus (SCBA) Cylinder Check
Ship Information Book (SIB) – HULL & MECHANICAL SYSTEMS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard Electrical Cable test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machinery Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2020, Install Interior Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2020, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2020, Temporary Hull Accesses
OTHER REFERENCES
Actisense Data Multiplexer NDC-4 Full User Manual
Amerex Inspection, Maintenance, and Recharge Service manual NO. 13259
American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016
American National Standards Institute (ANSI)/ National Conference of Standards Laboratories (NSCL) Z540-1-1994, 1994, Calibration Laboratories and Measuring and Test Equipment – General Requirements
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded and Welding End
ASTM International (ASTM) F992, 2011, Standard Specification for Valve Label Plates
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN)
Code of Federal Regulations 46, Subchapter J, Electrical.
Environmental Protection Agency (EPA) Technician Certification, Type IV (Universal Certification)
Federal Specification (Fed Spec) QQ-N-281, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections xii (Draft-0)
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper-Aluminum Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and Alloy Steel
Final report for SFLC Central activity 33510 “Rev A Final report for 33510. Request Electrical System Analysis and Review for WAGB 420 Healy radio room workbench, modify”.
Huber A-Frame Drawing HI-571-1001, Rev C
IEEE STD 45-2002, Recommended Practice for Electrical Installations on Shipboard
IEEE STD-45 Recommended Practice for Electric Installations on Shipboard
Kongsberg EM 124 Installation Manual
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2013 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves.
MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-DTL-15024, General Specification for Plates, Tags, and Bands for Identification of Equipment
MIL-DTL-23549, Sep 2016, Grease, General Purpose
MIL-DTL-24643, Dec 2011, Cables and Cords, Electric, Low Smoke, For Shipboard Use, General Specification for
MIL-DTL-24643, General Specification for Low Smoke Electric Cables and Cords for Shipboard Use
MIL-HDBK-299, Oct 1991, Cable Comparison Handbook – Data Pertaining to Electric Shipboard Cable
MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness
MIL-R-21252, May 1991, Rubber Sheet, Solid, Synthetic, Shipboard Water Evaporator Gasketing
MIL-S-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling or Main Propulsion Shafting
MIL-S-22473, Apr 1983, Sealing, Locking, And Retaining Compounds: (Single-Component).
MIL-S-45180, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-1310 (series), Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EPM) Mitigation and Safety
MIL-STD-2003, Electric Plant Installation Standard Methods (Section 1: Cable)
MIL-STD-2003, Electric Plant Installation Standard Methods (Section 2: Equipment)
MIL-STD-2003, Electric Plant Installation Standard Methods (Section 3: Penetrations)
MIL-STD-2003, Electric Plant Installation Standard Methods (Section 4: Cableways)
MIL-STD-2003, Sep 2009, Electrical Plant Installation Standard Methods for Surface Ships & Submarines
MIL-V-24624, Nov 1983, Valves, Butterfly, Wafer and Lug Style, Shipboard Service
National Fire Protection Association standard NFPA-10 (Portable Fire Extinguishers)
Naval Sea Systems Command (NAVSEA) S6430-AE-TED-010, Jul 1996, Technical Directive for Piping Devices, Flexible Hose Assemblies
Naval Ship's Technical Manual (NSTM) Chapter 505, Rev 5, Piping Systems
Naval Ship's Technical Manual (NSTM) Chapter 556, Rev 9, Hydraulic Equipment Power Transmission and Control
Naval Ship's Technical Manual (NSTM) Chapter 589, May 2002, Cranes
Naval Ship's Technical Manual (NSTM) Chapter 613, Wire and Fiber Rope Rigging xiii (Draft-0)
Naval Ships’ Technical Manual (NSTM) Chapter 541, 2007, Ship Fuel and Fuel Systems
Naval Ships’ Technical Manual S9086-RK-STM-010, 2013, Chapter 505 Piping Systems
NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation Details
NAVSEA Drawing NAVSEA S9AAO-AB-GOS-101, General Specification for the Overhaul of Surface Ships
NAVSEA S6430-AE-TED-010, Rev -; Technical Directive for Piping Devices, Flexible Hose Assemblies
NAVSEA S9583-AR-MMC-010, VOL 1, Davit, Winch & HPU, Rescue Boat (RHIB)
NAVSEA SG700-AM-MMC-010/34712, POWER UNIT, HYDRAULIC, AFT GENERAL SERVICE
NAVSEA SG700-AP-MMC-010, Rev -; Preliminary Operation & Maintenance Manual for WAGB 20 Polar Icebreaker a-Frames
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), Power Tool Cleaning
The Society for Protective Coatings (SSPC), Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
The Society for Protective Coatings SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
U.S. Navy SL740-AA-MAN-010, Jul 2002, U.S. Navy Towing Manual
United States Environmental Protection Agency 402-K-01-001, 2008, Mold Removal in Schools and Commercial Buildings.
USCGC HEALY (WAGB-420) DRYDOCK AVAILABILITY FY2022
xiv (Draft-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
N 420' WAGB Minor
(Face Change out) Overhaul Kit
Wartsila P/N 001442-001 2 EA $20,250
12 N SEAT Wartsila P/N H82923-A03 2 EA
12 N
Inflatable Seals Wartsila P/N: H72031-01-1-
5, NSN: 5330-01-431-0869
2 ea.
13 N Oversized Diaphragm Assy, 23.750”-in ND
Seals
John Crane (Wartsila)
P/N US-72032-01-2
CG P/N: XFC058099
NSN 5330-01-430-4164
2 EA $15,000
13 N O-Ring Wartsila P/N: H47667-2F03 2 EA
16 Y Teledyne Ocean
Surveyor RD OS- 75(ADCP Transducer)
PN: 1 EA $20,000
16 Y Teledyne Ocean
Surveyor RD OS-150 (ADCP Transducer)
PN: 1 EA $20,000
16 Y Simrad (By Kongsberg) EK80 18kHz Transducer
PN: 1 EA $28,500
16 Y Simrad (By Kongsberg)
EK80 38 kHz Transducer
PN: 1 EA $16,000
16 Y Bathy 1500C PN: P06100-1 1 EA $15,000
17 N Display Unit 7025-01-678-5218 / DS600 4 EA $1,641
17 N Distribution Unit 5895-01-678-5147 / DS610 1 EA $4,335
17 N Transceiver Unit 5845-01-678-5160 / DS620 1 EA $6,337
17 N Transducer w/30M
Cable
5845-01-678-5056 / DS630-
1 EA $5,005
17 N Gate Valve 4820-01-678-5058 / DS661 1 EA $10,237
17 N Doppler Shell Ring 5340-01-F19-5622/DS-661-1 1 EA
17 N Mounting Bracket 5340-01-685-8548/000-016-
4 EA $245
18 N 2 degree RX transducer w/ 25M cable
364296 8 EA
18 N Baffleplate Kit 2 degree
RX
386820 1 EA
20 N Rudder Bolts 5306-01-F16-5873 12 EA $300 xv (Draft-0)
20 N Rudder Nuts 5310-01-F16-5874 12 EA $90
22 N Anode, elliptical, iridium oxide & titanium, 75 A
Wilson Walton AQ-AEI-103
NSN: 5342-01-453-1429
20 EA $3,665
N Recessed Zinc Reference
Cell Wilson Walton AQ-RRC-100
NSN: 5977-01-453-2560
4 EA $590
27 N Capscrew Allied Systems P/N:
240930
8 EA $106
27 N Washer Allied Systems P/N:
234271
8 EA $0.82
27 N Nut, Esna Allied Systems P/N:
230897
8 EA $2.85
28 N Capscrew Allied Systems P/N: 240930 8 EA $106
28 N Washer Allied Systems P/N: 234271 8 EA $0.82
28 N Nut, Esna Allied Systems P/N: 230897 8 EA $2.85
29 N Capscrew Allied Systems P/N:
240930
8 EA $106
29 N Washer, Hard Allied Systems P/N:
234271
8 EA $0.82
30 N 0.322 Wire Rope N/A 10,000 FT
39 N Automatic Main
Seawater Strainer, 24”, Model 596
EATON P/N: 5962004005
2 EA $750,000
41 Y 20” PIMA Gate Valve 01-645-2698 4 $35,910.00
41 Y 18” PIMA Gate Valve 01-645-2527 2 $31,066.00
41 Y 16” PIMA Gate Valve 01-645-2599 2 $28,461.00
41 Y 18” Motor Operated
Btfly Valve 01-663-7956 4 $37,254.67
*Government-loaned property, which must be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center xvi (Draft-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item
Title
2 Hull Plating (U/W Body and Freeboard), Ultrasonic Testing
3 Hull Plating (U/W Body), Inspect
4 U/W Body, Preserve “100%”
5 Hull Plating Freeboard, Preserve “100%”
6 Tanks (Ballast), Clean and Inspect
7 Tanks (Ballast), Preserve “100%”
8 Transducer Well Deck, Preserve
9 Voids (Non-Accessible), Leak Test
10 Propulsion Shafts, Alignment Check
11 Propulsion Shaft Bearings (External), Check Clearances
20 Rudders, Remove, Inspect, and Reinstall
21 Anchor Chains(s) and Ground Tackle, Inspect and Repair
23 A-Frames, Annual Inspect and Test
24 Port and Starboard Miranda Davit, Annual Inspect and Repair
25 04 Deck Crane (Port) TB 100-55, Annual Inspect and Test
25 04 Deck Crane (Starboard) TB 100-55 Annual Inspect and Test
27 Aft Crane (Port), Annual Inspect and Test
28 Aft Crane (Starboard), Annual Inspect and Test
29 Bow Crane, Annual Inspect and Test
30 Oceanographic Winch, Inspect and Test
31 Trawl/Core Winch, Inspect and Test xvii (Draft-0)
38 Internal Hoist, Level 1 Inspect and Test
39 Automatic Main Seawater Strainer, Renew xviii (Draft-0)
PRINCIPAL CHARACTERISTICS
420' WAGB (CGC HEALY)
PHYSICAL
Length overall 420' Length between perpendiculars 396' 6" Beam, extreme 82' 0" Depth amidships to main deck 42' 0" Draft to bottom of keel @ full load 29' 3" Full load displacement 16,423 long tons Effective keel length 230' 0" Mast height above DWL @ 28' draft 158' 3/8"
HULL
Frame spacing 30" Material Hull ASTM A131, GR EH 36, or ABS EH 36 Flight deck ASTM A131, GR EH 36, or ABS EH 36 Superstructure ASTM A131, GR EH 36, or ABS EH 36
MACHINERY
Propulsion 4 Sultzer 12Z a V 40S
2 AC Synchronous, 11.2MW Drive Motors Auxiliary generator 1 EMD 16-645F7B, 2200 KW, 450V AC, 3 phase Rudder 2 Anchor & chain Two 13,200 lbs Navy Stockless, 150 fathoms chain Starboard, 165 fathoms chain
Port
TANKS
Diesel oil or JP-5 (@ 95%) 1,187,117 gal.
JP-5 (Helo) (@ 95%) 56,434 gal.
9250 lube oil (@ 95%) 24,794 gal.
Fresh water (@ 95%) 34,553 gal.
Hydraulic oil (@95%) 8,571 gal.
Ballast water (@95%) 899,776 gal.
1 (Draft-0)
00000_1219_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINS) 10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Draft-0)
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor must be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor must be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the KO and COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the KO, the COR and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, and must be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance
3 (Draft-0) with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 Hazardous Waste disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Schedule and Progress. The Contractor must provide planning document(s) IAW SFLC Std Spec 0000 and hold a weekly progress meeting for all stakeholders. The Contractor must also hold a daily production meeting.
Dates and times must be mutually agreed upon with the Coast Guard at the Arrival Conference.
3.7 SFLC standard specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:
None.
3.8 Instrument/Tooling Calibration. The requirement for instrument/tooling calibration called out in SFLC Std Spec 0000 Paragraph 3.2.6.1.2 must be modified to the following: The Contractor must ensure that all measurements and readings are taken with calibrated measurement and test instruments on QA forms at the time of the inspection. Upon COR request, the Contractor must provide calibration information for any applicable measurement and test instruments/equipment used in performance of this contract.
3.9 Valves. The Contractor must provide adequate containment (flanging, etc.) to facilitate performance of work contained herein. The Contractor must assume all valves on the cutter leak by.
3.10 Gas Free Certification. The Contractor must clean as required to obtain gas free certifications for hot work required in the specification.
3.11 Operational Test Notification. The Contractor must notify the Coast Guard by email 24 hours in advance of all operational tests or work requiring a Coast Guard Operator. The COR or KO may waive the 24 hour requirement for notification upon request.
3.11.1 Weekend/Federal Holliday Operational Tests. Operational tests or work requiring a Coast Guard operator that will occur on a Saturday, Sunday, or Federal Holiday must be submitted no later than 1600 the working day prior. This requirement may be waived by the COR upon request.
3.12 Call Out Process. All QA inspections/check points must be called out by email 24 hours in advance to an email list designated by the COR. The COR may waive the 24 requirement for notification upon request.
3.12.1 Weekend/Federal Holliday Call Outs. Call outs for inspections that will occur on a Saturday, Sunday, or Federal Holiday must be submitted no later than 1600 the working day prior. This requirement may be waived by the COR upon request.
3.13 CFR Submission. The Contractor is not required to sign CFRs.
3.13.1 All CFRs that include a recommended repair must include proposed change language to the specification.
4 (Draft-0)
3.13.2 The Contractor must maintain a spreadsheet tracking all CFR deliverables required by the contractor. The spreadsheet must be provided to the COR weekly.
3.14. Critical Inspection Report (CIR) Deadline.
3.14.1 All CIRs are due within the first 25 percent of the contract period in accordance with SFLC Std Spec 0000 paragraph 1.3.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Draft-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK
ITEM #
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Draft-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT, TOP
COAT, ETC.)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFAC
E
AMBIEN
T
ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Draft-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Draft-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT
QA RECORD.