This is a Statement of Work (SOW) for foundation repair and atrium drainage work at the USDA U.S. Vegetable Laboratory in Charleston, South Carolina.

The USDA requires immediate repair of the foundation and drainage systems in the atrium area of Building 44, located at 2700 Savannah Highway, Charleston, SC 29414. The project addresses mission-critical concerns related to structural damage and drainage failures. The contractor must perform three primary tasks: (1) repair all cracked and subsided areas and stabilize affected components; (2) repair and replace all affected drainage infrastructure, including pipes and basins, to eliminate subsidence, drainage, and overflow issues; and (3) clean up all debris and restore the area to its prior visual condition with minimal disruption to daily facility operations. The deliverable is the complete repair or replacement of all known issues affecting subsidence, drainage, and overflow within the affected area. No specific timeline, budget, pricing terms, or other contracting details are provided in this SOW document.

View the file

Other files

File Type Posted
Attachment 1. Schedule of Items.pdf PDF
Attachment 3. Wage Determination.pdf PDF
12441926Q0041.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

Foundation Repair Bldg. 44 Atrium Drainage

1.0

Scope of Work. The United States Department of Agriculture (USDA) U.S. Vegetable Laboratory in Charleston, SC has a need for repair of the foundation and drainage in the atrium area of Bldg. 44 at the Charleston Location.

The contractor shall be required to deliver the repair in accordance with the technical requirements in Section 3 below.

Location: 2700 Savannah Highway Charleston, SC 29414

2.0 Background. The U.S. Vegetable Laboratory building 44 mission critical support mission accomplishment concerns and damage to structure and drainage.

CONTRACTOR REQUIREMENTS

Technical Requirements/Tasks. This project requires the immediate repair of all affected components and area. This will include the following requests:

2.1 Repair of all cracked, subsided, and stabilize affected areas

2.2 Repair and replacement of all affected drainage to include pipes and basins to reduce future subsidence, drain, and overflow issues in affected areas

2.3 Cleanup all debris and return area to prior visual condition with minimal interruption of location daily work

3.0 Deliverables: Repair or replacement of all known issues affecting subsidence, drainage, and overflow within affected area.