Attachment 2.pdf

PDF 13 KB Posted

Attached to
Heritage Surveys
Solicitation number
12444321R0002
Issued by

View the file

Other files

File Type Posted
Attachment 4__2015-4771.pdf PDF
Attachment 6__2015-4365.pdf PDF
12444321R0002.pdf PDF
Attachment 7__2015-4765.pdf PDF
Attachment 3.pdf PDF
Attachment 8__2015-4729.pdf PDF
Attachment 1.pdf PDF
Attachment 5__2015-5785.pdf PDF
Attachment 9.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective

Acceptable Quality Level (AQL) Surveillance Method Remedy

Plan of Work and Schedule (for each task order)

Must be 100% complete and accepted by the COR

100% Inspection – COR will review at the task order pre-work meeting.

Re-work at contractor expense. Task Orders will not be extended in the event re-work is required.

Field Investigation Must be 100% complete and accepted by the COR (including coverage maps)

100% Inspection – COR will review for conformance to the SOW/SHPO Guidelines.

COR and/or designated Inspectors may also perform Periodic Inspections in the field during task order performance.

Re-work at contractor expense. Task Orders will not be extended in the event re-work is required.

ARPA Violation

Must contact COR within 24 hours of discovery

100% Inspection by the COR and Law Enforcement

N/A

Treatment of Human Remains Inadvertently Discovered

Must cease work and contact COR within 24 hours of discovery.

Provide reasonable short-term protection.

100% Inspection by the COR N/A

GPS and GIS Electronic Spatial Data

The data shall be delivered to the Forest on or before the last day of the performance time as defined in the task order – data shall accompany the Final Report.

100% Inspection by the COR to ensure data is accurate, complete and reflects the survey results/site locations in the report.

Re-work at contractor expense.

Draft Report Must be 100% complete and accepted by the COR

100% Inspection – COR will review for conformance to the SOW/SHPO Guidelines.

Re-work at contractor expense.

Performance Objective

Acceptable Quality Level (AQL) Surveillance Method Remedy

Site Forms – I-Form

Must be 100% complete and accepted by the COR

100% Inspection Re-work at contractor expense.

Final Report Final report received by the COR on or before the last day of the performance time as defined in the task order. Report 100% complete and accepted by the COR with all previously identified deficiencies corrected

100% Inspection – COR will review for conformance to the SOW/SHPO Guidelines.

Re-work at contractor expense.

Preparation and Curation of Collected Materials

Materials prepared according to Ohio Historical Society Guidelines per contract specifications;

contractor coordinates for curation.

100% Inspection – COR will be notified by the Curation Facility

Re-work at contractor expense.

AG-55N9-C-16-0001 form
binder
02 RGA Bid Schedule_-_AG-64R4-S-15-0010 Revised 2015.09.28
binder
beginning of award doc
52.216-18 – Ordering (Oct 1995)
52.216-19 – Order Limitations (Oct 1995)
52.216-21 – Requirements (Oct 1995)
52.217-9 – Option to Extend the Term of the Contract (Mar 2000)
52.223-2 -- Affirmative Procurement of Biobased Products Under Service And Construction Contracts. (SEP 2013)
Statement of Work
WD 05-2417 (Rev.-18)
WD 05-2423 (Rev.-16)
WD 05-2573 (Rev.-18)
MAP 1
MAP 2
MAP 3
MAP 4
MAP 5

File details come from the government source that posted it. Updated .