Attachment 2 - Divisional Price Breakout.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C26025R0079
About this file
The file is a Price Schedule Breakdown attachment for RFQ 687-24-112, detailing a door operator installation project at the Walla Walla VA Medical Center. The project involves installing pushbutton door operators at a staff entrance and four single wooden restroom doors across first and second floors of Building 143, with the goal of improving ADA accessibility. The pricing template includes a comprehensive breakdown across 33 construction specification divisions, allowing contractors to itemize costs for general requirements, existing conditions, electrical work, and other related categories. The document specifies fixed-price pricing and requires contractors to provide detailed cost allocations, including mobilization, demobilization, insurance, bonds, taxes, overhead, and potential subcontractor markup rates, with the ultimate objective of enhancing building entrance accessibility for staff and public users.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| RFQ: 687-24-112 Install Door Operators at B143 |
Project Location: Walla Walla VA Medical Center, 77 Wainwright Dr, Walla Walla, WA 99362
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements | ||
| Division 2 Existing Conditions | ||
| Division 3 Concrete | ||
| Division 4 Masonry | ||
| Division 5 Metals | ||
| Division 6 Woods, Plastic and Composites | ||
| Division 7 Thermal and Moisture Protection | ||
| Division 8 Openings | ||
| Division 9 Finishes | ||
| Division 10 Specialties | ||
| Division 11 Equipment | ||
| Division 12 Furnishings | ||
| Division 13 Special Construction | ||
| Division 14 Conveying Equipment | ||
| Division 21 Fire Suppression | ||
| Division 22 Plumbing | ||
| Division 23 HVAC | ||
| Division 25 Integrated Automation | ||
| Divison 26 Electrical | ||
| Division 27 Communications | ||
| Divison 28 Electronic Safety and Security | ||
| Division 31 Earthwork | ||
| Division 32 Exterior Improvements | ||
| Division Item 33 Utilities |
SubTotals N/A $0.00
Period of Performance (FAR 52.211-10) ________ days
| Mobilization / Demobilization | ||
| Insurance / Bonds | ||
| Taxes / Other Fees (provide itemized list) | ||
| O&M Manuals and Red Line Drawings | ||
| Overhead | Rate _______% | |
| Overhead (daily rate) | Per Day $0.00 | |
| SubContract Mark-Up | Rate _______% | |
| Profit | Rate _______% | |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00
File details come from the government source that posted it. Updated .